| 1 | Rehabilitation of bridge |
| 2 | OD85187/2025-2026:Removing damaged concrete:Loose and delaminated concrete shall be identified and marked before proceeding with the removal. The loose cover concrete including the loose damaged concrete shall be removed upto beyond the corroded bars to a minimum depth of 10 mm behind the reinforcement. Only affected concrete shall be removed and conducting proper investigation, (Good & sound concrete should not be chipped / damaged) by chipping / hacking with chisel and hammer or by mechanical means like light weight chisel hammer, pneumatic chippers, making saw cut at periphery to avoid feather edge for all height and removal and disposal of debris at designated location including all material, labour, tools, temporary supports for structures, electricity, plant and machineries etc. complete as directed by Engineer-in-charge and/or Consultant. Depth of chipping may vary from 20 to 100 mm. |
| 3 | OD85174/2025-2026:Rust remover/Rust Convertor:Cleaning of rust / scales / corrosion from reinforcement bars should be carried out using acid based rust remover, Reebakleens RR of Fosroc or equivalent, or using alkali based rust converters such as Feovert of Krishna Conchem. The material is to be applied to the rusted metal bar, using brush and leaving it to dry for 30 Min. & washing surface with fresh water as required to exposed reinforcement bar at all heights, including all material, labour, tools, temporary supports for structures, electricity, plant and machineries complete as per detail specification and as directed by Engineer-in-charge and/or Consultant. The concrete surface area containing the cleaned rebars shall be measured for payment. |
| 4 | OD92061/2025-2026:Anti Corrosive treatment to Steel:Providing & applying inhibition coats/system to exposed reinforcement bars & also new bars,after cleaning & removing scales and rust completely as specified in 1.4, Two componentinhibitor Nitozinc Primer std. of Fosroc or MasterEmaco P130 of BASF or equivalent havingspecific gravity of 1.75 and solid content 57(+/-3) Adhesive bond strength > 1.5 N/mm2, 40microns DFT per coat as approved by Engineer-in-charge and/or Consultant shall be used as permanufacturers specification in two coats at all heights, including all material, labour, tools,temporary supports for structures, electricity, plant and machineries, necessary surfacepreparation and necessary protection after and during work. The concrete surface areacontaining the rebars where the treatment is carried out shall be considered for measurement. |
| 5 | OD85182/2025-2026:New/Additional steel Reinforcement:Supplying, cutting, fabricating new reinforcement Fe500 for Jacketing, and providing additional steel reinforcement to compensate corroded reinforcement in existing member etc. and fixing with old existing reinforcement which was reduced to 15 % or more of its original diameter as required as provided in original structure and additional steels as directed by EIC and/ or consultant as required tying with 16 gauge annealed binding wire complete as per drawing and specifications for all heights including all material, labour, tools, temporary supports for structures, electricity, plant and machineries, curing etc. complete as directed by Engineer-in charge and/or consultant (TMT BARS of various size as required) |
| 6 | OD85180/2025-2026:Anchoring mainsteel and stirrups:Drilling holes of min 4mm larger than new rebar diameter into existing concrete substrate for anchoring of new rebar and depth of Min. 10 times the diameter of rebar and fixing with anchor resin grout Lokfix E (35/55/75) series or Lokfix P or Emfix or chemical anchor material or Masterflow 935 of BASF or equivalent as per NF P 18-831 and NF P 18-836 including cleaning, cutting, fabricating, chemicals, material, labour, tools, temporary supports for structures, electricity, plant and machineries etc. complete as directed by Engineer-in-charge and/or consultant for all heights. |
| 7 | OD85188/2025-2026:Anchoring Steel & Shear Connectors:Drilling holes into existing concrete structure for anchoring of new rebar with 10 mm dia. shear connectors at 0.5 Mt. c/c (or as per design recommendation) and fixing with anchor resin grout Lokfix P / Lokfix E 75/55/35 series or Emfix or pure epoxy resin based cartridge form chemical anchor material or Masterflow 935 of BASF or equivalent as per NF P 18-831 and NF P 18- 836. Drilling hole for diameter: 14 mm, Drilling hole for depth: 100 mm including cleaning, cutting, fabricating, chemicals, material, labour, tools, temporary supports for structures, electricity, plant and machineries etc. complete as directed by Engineer-in-charge and/or consultant for all heights |
| 8 | OD92104/2025-2026:Injection Grouting-Cement polymer Cement:Providing and fixing Injection ports/nozzles at honeycombed area, cracks in CC, joints ofchannel and/or in staggered manner on all sides of Member at @ 0.5-0.75 M c/c spacing afterdrilling holes, to facilitate injecting cement-polymer grout, using quick setting material orepoxy putty and providing and executing injection / pressure grouting in prefixed nozzles/portsusing Cement polymer grout (Cement : Polymer ) in proportion of (50:5) with non-shrinkadmixture Cebex 100 or equivalent and adding water for required consistency till no furthergrout is accepted by ports using grout pump, at all heights including all material, labour, tools,temporary supports for structures, electricity, plant and machineries, curing etc. complete asdirected by Engineer-in-charge and/or consultant. |
| 9 | OD85175/2025-2026:Epoxy Injection Grouting:Providing and executing injection/pressure grouting in cracks in the parent concrete by fixing PVC perforated nozzles at 150 mm to 200 mm distance or specified distances as per design and detailed specifications. Pressure grouting using low viscous epoxy grout Conbextra EP10M of Fosroc or Masterinject 1315 of BASF or Shaligroput EI or equivalent having mix density 1050 kg/m3, Compressive Strength (ASTM D695)->50 N/mm2,Tensile Strength (ASTM C 304- 97)-18 N/mm2, Flexural strength(BS 6319 Part 4)-45 N/mm2 Pressure grouting shall be done at required pressure at all heights, including all material, labour, tools, temporary supports for structures, plant and machineries, curing etc. complete as directed by Engineer-in-chargand/or consultant. |
| 10 | OD85181/2025-2026:Galvanic Sacrificial Prevention of steel by Point anodes:Providing and fixing sacrificial zinc anode to prevent initialization of corrosion of reinforcement in adjoining sound concrete due to chloride ingress by installing anodes from VECTOR Galvashield XPI or equivalent for patches at Min. 2 to 4 anodes / Sq.mt. area of concrete (spacing of 300 to 700mm), as per manufacturer specification, covered with mortar with of resistivity less than of parent concrete on the cleaned reinforcement steel including design from manufacturer, installation of Monitoring Box to measure current thrown by Anode as per IS 12696 in range of 0.2 to 2mA/ sq.mt as per manufacturers specification before applying passivation coating at all heights and including of all material, labour, tools, temporary supports for structures, plant and machineries, etc. complete as directed by Engineer-in-charge and/or consultant.( for slabs) |
| 11 | OD85183/2025-2026:Galvanic anodes for sound but contaminated concrete:Providing and fixing sacrificial zinc anodes to control the ongoing corrosion of the embedded steel bars by installing anodes from Vector Galvashield XPI at a spacing of 400 as per the manufacturer's/consultant's specification covered with mortar with of resistivity less than of parent concrete on the cleaned reinforcement steel as per manufacturers specification before applying passivation coating at all heights and including of all material, labour, tools, temporary supports for structures, electricity, plant and machineries, etc. complete as directed by Engineer-in-charge and/or consultant. Paymenet shall be made per nos of the anode installed.( For girders) |
| 12 | OD85179/2025-2026:Polymer Modified Mortar (Pre-Packed):Providing and Applying single component, high strength, fibre reinforced, thixotropic cementitious patch repair mortar that achieves compressive strength minimum of 15 MPa at 1 day and 45 MPa at 28 days and capable of applying upto 50mm thick in single layer such as Renderoc SP40 of Fosroc or Master Emaco S 348 of BASF or equivalent, to the prepared concrete area for thickness up to 50mm, after applying epoxy resin based bonding coat as per manufacturers specification, before the bonding agent becomes tack free, initially by hand and finally finishing the same with trowel carefully compacting the same around the rebar and finishing to bring it in line with existing concrete surface on the columns, slabs, beam etc. at all heights, where the thickness of application is less than 50 mm in patches as per specification. Item rate is inclusive of all material including the bond coat, labour, tools, temporary supports for structures, electricity, plant and machineries, curing etc. complete and as directed by Engineer-in-charge and/or consultant. (Payment to be made in Sq.M for thickness up to 50mm of PMM for patch area repaired) |
| 13 | OD85176/2025-2026:Microconcrete Reinstatement for thickness more than 50mm for RCC members:-Providing and laying of special repair material micro-concrete for reinstatement of members having thickness of repair more than 50mm and jacketing, using Single component, high strength, high flow cementitious micro-concrete having compressive strength minimum of M40 at 28 days such as MasterEmaco 346 or Renderoc RGL / RGS of Fosroc or equivalent, blended with washed saturated surface-dry (SSD), graded, low absorption, high density, aggregates of size 3mm to 10mm at 50% by weight of micro concrete (if thickness is 100mm or more) and water as per data sheet and pouring into the shuttering if required than use birds beak type form work using suitable arrangement or if required using pumping device for uniform flow of Microconcrete. The side shuttering can be removed after Minimum of 24 hours, preferably 3 days and the bottom shuttering after 7 days ensuring proper bond between the micro concrete and existing concrete substrate at all heights, including all material, labour, tools, temporary supports for structures, electricity, plant and machineries, curing etc. complete as directed by Engineer-in-charge and/or consultant. (Payment shall be made in Sq.M for thickness up to 100mm of Microconcrete of area repaired, ) including shuttering work (Only steel reinforcement shall be paid in other relevant items) |
| 14 | OD85186/2025-2026:Providing drainage spout with 63mm PVC pipe 100cm long including all cost conveyance and lobour charges etc. complete |
| 15 | OD89862/2025-2026:Providing aluminium expansion joint using 16 gauge aluminium sheet including all cost andconveyance of sheet including cutting and bending in the required shape and filling withbitumen saw dust,mix, etc. complete as per specification. |
| 16 | Painting of bridge proper and approach road |
| 17 | 55.26a:Providing and applying elastic, elastomeric membrane forming system with anticarbonation and breathing properties. The system should be based on solvent free acrylic polymers with selected mineral fillers and should be ultra-violet resistant, crack bridging type, carbonation resistant, breathable, enviornment friendly, water proofing coating. For anticarbonation, equivalent air layer thickness denoted as R or SD CO2 grater than 50 m and for breathability equivalent air layer thickness denoted as SD H2O shall be less than 4 m for vapour transmitting barrier. The system consists of one coat primer @ 75- 100 g/m2. The consumption of main polymer coating to give film thickness of 200-225 microns (Solid contents- 70%+ -3%) should be approximately. 400-450 g/m2 per two coats depending upon the method of application (either by roller or brush) and surface smoothness of the concrete. The total dry film thickness of the coating system should be minimum 200 microns for the above system. Polymer coating should be in suitable approved shades, including cost of materials, cleaning, chipping and removing the dirt particles of the concrete slab with wire brush and water,labour charges for filling the bug holes, cracks, joints etc with one component polymer modified fine repair and cosmetic mortar, labour for applying the above coating, scaffolding charges,etc. complete as per IRC SP:80 Clause 6.5.1 and Clause 2808 in the Specifications Book for Roads & Bridges published by the Ministry during April 2013. |
| 18 | 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means |
| 19 | OD91869/2025-2026:Supplying and stacking well matured straight 6m long coconut post having average diameter on25cm for driving down through various strata below bed level including cost conveyance labourcharges etc complete. |
| 20 | OD91876/2025-2026:Driving down coconut pile to lines and levels through sandy soil strata including all hirecharges and labour and all other appliances necessary for pile driving down after pointing thebottom end. Details for one post of 6m long 5 numbers per day 6X5=30m Details for 30mlength. |
| 21 | OD91886/2025-2026:Cutting and removing the excess length of Wooden/ Coconut piles to lines and levels andremoving the cut end of piles and stacking within 150m. |
| 22 | OD91894/2025-2026:Filling with Quarry Muck filling up low lying and water logged areas with local material/quarrymuck, spreading in layers, levelling the top at site and consolidation by ramming etc. completefor improving the CBR value of subgrade (LSGD approved OD No. 51.2.3) |
| 23 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. |
| 24 | 12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer - (Without formwork) <br> |
| 25 | 12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 |
| 26 | 13.5.A:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications PCC Grade M15 - Height upto 5m |
| 27 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications |
| 28 | 13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications |
| 29 | OD85189/2025-2026:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg/sq.cm including cost of materials, conveyance, labour charges etc. complete.( As per approved OD Irrigation in price as spec.code 60.6) |
| 30 | 13.10:Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. |
| 31 | 3.16:Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. |
| 32 | 3.17:Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. |
| 33 | 15.4.A:Providing and laying Pitching on slopes laid over prepared filter media including boulder Stone/Boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications |
| 34 | 3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means |
| 35 | 4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method |
| 36 | 4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 37 | 5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means. |
| 38 | 5.2.b:Providing and applying tack coat with bitumen emulsion (RS) using emulsion pressure distributor at the rate of 0.25 - 0.30 kg per sqm on the prepared Granular Surface cleaned with mechanical broom. |
| 39 | 5.7.2:Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 13.2 mm to 0.09 mm (Type-B) aggregates using viscosity grade bitumen ( VG - 30) to the required line, grade, and level to serve as wearing course on a previously prepared base, including mixing in a suitable HMP of appropriate capacity not less than 75 tonnes/hour., laying and rolling with a Smooth wheeled roller 8-10 tonne capacity, and finishing to the required level and grade. |
| 40 | 55.10.1:Providing and erecting retro-reflectorised Object Hazard Marker 300mm x 900mm Providing and erecting retro-reflectorised Object Hazard Marker sign with 07 years warranty, manufactured as per IRC 67 USING Type IV ASTM D 4956-09 micro prismatic retro reflective sheeting fixed over aluminium sheetig, 2 mm thick / aluminium composit material sheeting 4 mm thick with suitable back support frame and supported on a mild steel angle iron post 75mmx75mmx6mm, firmly fixed 30cm above ground level by means of properly designed foundation with M 15 grade cement concrete 30cmx30x45cm, 45cm below ground level including painting all non-reflective faces with epoxy paint 2 coats over epoxy primer as per approved drawing and clause 801.300 mm x 900 mm |
| 41 | 55.14:Providing and fixing retro-reflectorised ceramic tilesProviding and fixing retro-reflectorised ceramic tiles of size 10cmX20cm using High Intensity Micro Prismatic (Type IV) grade sheeting with 7 years warranty fixed over Ist quality ceramic glazed tiles including cost of glue, cutting charges, fixing with suitable adhisive on concrete or other surface etc complete. |
| 42 | 8.5:Providing and fixing of direction and place identification retro-reflectorised sign with 7 years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with area not exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc. |
| 43 | OD91354/2025-2026:Engaging Man Mazdoor (coolie) for clearing and removing all the debris from the periphery of site |
| 44 | Ring Bund |
| 45 | OD348061/2025-2026:Putting up ring bund of top width 1.50m, bottom width 2.75m.and average height of 2.50m with 1:1/4 side slope and protect the sides with coconut post of 4.50m long driving down 2.00m below bed level at 75cm c/c, providing 3 rows of weiling pieces 1/4 split coconut post on both sides and 1/4 split cross ties to alternate posts at top, bottom and middle portion and screening the sides of bund with Seperation memebrane of impermeable plastic sheet 125 micron thick fixed properly using coconut post and weiling pieces using reeper and nails in full height including tying properly using iron wire and coir altogether and supply and filling inside with hard clay/cut earth up to 2.50m, levell and conveyed with all leads and lifts including consolidating properly and maintaing the bund till the work is completed and dismantling the bund after completion of work etc. as per the directions of departmental officers at site. Bottom width 2.75m, Height 2.5m Side slope 1:1/4 Length of coconut pile 4.50m Spacing 0.75m No. of leyers 2 Length of full coconut pile required for 10m = ((10/0.75)+1)x2x4.5 = 126m Length of (1/4 split) coconut cross ties for 10m = 3x2.5 av. x 7 Nos. = 52.50 m Length of 1/4 split weiling pieces for 10m = 3x2x10 = 60m |
| 46 | OD348063/2025-2026:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection, cost of fuel, lubrication oil and other stores, pay of staff etc complete Please Enable Macros to View BoQ information |