| 1 | Removal of of ACSR Dog/RABBIT/WEASEL conductor from both side spans of damaged pole and removal of H.T/L.T line accessories from damaged pole. |
| 2 | Digging of pit of damaged pole in Pakka road (Hard soil) with the help of road cutter/digging machine, Tractor etc. for dismantling the pole. |
| 3 | Digging of pit of damaged pole in Kachha side road (soft soil) for dismantling the damaged pole. |
| 4 | Dismantling of damaged single support PCC Pole/S.T Pole from pit and S.T Pole carriage from work site to J.E's store and damaged PCC Pole will be carriage from wotk site to dumping yard including loading & unloading at both ends. |
| 5 | Carriage of new 8.5mt. Long PCC pole, 11 mtr. Long STP from Cetral Store, SAMBHAL/J.E Store to work site including safe loading and unloading at both ends. |
| 6 | Opening LT/HT Connection of Damaged various capacities transfomers in RAPDRP Town & IPDS (Town) areas under Electricity Distribution Sub-Division-I/II/III Sambhal & Carraige of damaged transformers from Sambhal (Town)/ Sirsi & Mehmoodpur Mafi Town areas to Central Store, Chandausi. |
| 7 | 25 KVA Trasformer |
| 8 | 63 KVA Trasformer |
| 9 | 100 KVA Trasformer |
| 10 | 160 KVA Trasformer |
| 11 | 250 KVA Trasformer |
| 12 | 400 KVA Trasformer |
| 13 | 630 KVA Trasformer |
| 14 | Bringing from Cetral Store Chandousi to the safely site against burnt/damaged transformers and installing them in place of burnt/damaged transformers and making all connections thereof. |
| 15 | 25 KVA Trasformer |
| 16 | 63 KVA Trasformer |
| 17 | 100 KVA Trasformer |
| 18 | 160 KVA Trasformer |
| 19 | 250 KVA Trasformer |
| 20 | 400 KVA Trasformer |
| 21 | 630 KVA Trasformer |
| 22 | Erection & fabrication of following supports including fitting of all reqired accessories of HT/LT line as per RESPO schedule. |
| 23 | Single supports on ST Pole of 11 Mtr. Long |
| 24 | Single support on PCC Pole |
| 25 | Grouting, concreting and plinthing of single support on ST pole of 11 mt. long with cement, stone ballast & coarse sand in ration of 1:3:6 complete in all respect. |
| 26 | Laying and Sagging of ACSR Dog/RABBIT/WEASEL conductor in both side spans of new erected pole in H.T/L.T line. |
| 27 | For attending 33 KV/ 11 KV Break down providing & replacement of damged Disc/Insulators and jointing of conductor and replacement of Jumpers etc. |
| 28 | Fixing of Disc Insulator as per Site requirement. |
| 29 | Fixing of Pin Insulator as per site requiement |
| 30 | Cutting/chopping tree branches in the way of 33 KV/11 KV /L.T lines. PER KM. |
| 31 | The following material is required to supplied by the contractor and Fixing of its material on Poles as required. |
| 32 | Stay Clamps |
| 33 | stay Insulator |
| 34 | F-Brackets |
| 35 | X-Arm Holding Clamps |
| 36 | F Clamp |
| 37 | Earth Clamp |
| 38 | Bolt and Nuts off Size |
| 39 | ACSR Weasel/Rabbit/Racoon/Dog conductor of HT/LT lines in different sectors & cartage of material from J.E's Store/Any Store of PVVNL Discom with loading & unloading at both ends. |
| 40 | H.T line |
| 41 | L.T line |
| 42 | Re-laying lifting, stringing & proper sagging of new conductor in place of old and damaged removed conductor on H.T/L.T line with binding, jumpering etc.including cartage, loading & unloading from Central store, Bijnor/J.E Store to site of work. |
| 43 | ACSR Dog Conductor(H.T line) |
| 44 | ACSR Weasel conductor (L.T line) |
| 45 | Re-sagging of conductor of loose H.T/L.T line which includes opening of jumpers, binding & re jumpering etc. complete in all respect. |
| 46 | 11 KV(3wire) line at various places |
| 47 | LT line (4/5 wire) at various places |
| 48 | Providing and fixing of Bamboo Phanti with the binding wire in L.T lines at different places. |
| 49 | Carriage of AB cable 95/120 Sqmm from Store Cente, Chandausi to work site including safe loading and unloading at both ends. |
| 50 | Laying, lifting & Stringing of AB cable size 95/120 sqmm in place of dismentlalled damaged ABC and fixing of all types clamps & connection complete in all respect. |
| 51 | Carriage of Distribution box(Single Phase/Three Phase) from Store Center Chandausi to work site including safe loading and unloading at both ends. |
| 52 | Installation of single/Three Phase Distribution box on pole with providing suitable L.T clamps and making LT lead connection complete in all respect. |
| 53 | Carriage of scrap material from J.E's store to Central Store Center, SAMBHAL including safe loading and unloading at both ends. |
| 54 | Overhauling & maintenance of ug xlpe cable /cable box for 70/120/185/300mm2 ht xlpe cable(including 33kv/11kv) |
| 55 | Utilisation of fault loactor for fault detection |
| 56 | Excavating the pinpointed fault area |
| 57 | Performing a cable joint on the damaged section through cable jointing kit |
| 58 | Fixing the damaged cable box for 70/120/185/300mm2 ht xlpe cable(including 33kv/11kv) Please Enable Macros to View BoQ information |