| 1 | Earth work cxcavation in founauon in ordinary soil including filling lift upto 1.5 meter and lead upto 30m including filling watering and ramming of excavated earth into the trenches etc all complete. S.I.No. 251 |
| 2 | P/L P.C.C. cement,F.sand & B. ballas Including supply of materials Labour and T&P etc requried for proper completeion of the work and curing complete also including cost of formwork in foudation and floor all complete.S.I NO 273 |
| 3 | R.C.C. work in 1:2:4 cement C.sand & stone grit in ran foundation all complete. For slab s.l N0287 |
| 4 | R.C.C. work in 1:1:5:3 cement C. Sand & stone grit in lighter beam all complete.s.l N0285(b) |
| 5 | R.C.C. work in 1:1:5:3 cement C Sand & stonc grit in coloumn all complete. S.I N0289 |
| 6 | First Class 150 brick work in I:4 Cement & C.sand monar all complete. S.I.NO 305 b |
| 7 | First Class 150 brick work in I:4 cement & C.sand mortar all complete. S.I.NO 305 b super .St |
| 8 | 20mm thick plaster in 1:3 cement & C.Sand mortar all complete. S.I.NO 597 |
| 9 | Providing & Laying of C.C. workin 1:2:4 cementc.sand & stone grit 2mm nominal size supply of materials Labour and T&P etc requried for proper completeion of the work and curing complete also including cost of formwork in foudation and floor all comp. S.LNo 279b |
| 10 | 12mm thick plaster in 1:3 Cement & C.Sand Mortar all complete. 583 |
| 11 | Provinding and applying white cement based putty of avrage thikness 1mm of approved brand and manufacture over the palstered wall surface toprepare the surface even and smooth complete S.I No D.S.R13.8 |
| 12 | Finishing wallwith premium acrylic smooth sxterior paint with silicone additives of required shade new work (Two or more coats applied all complete D.S.R.13.47.1 |
| 13 | R.C.C. 1:1:5:3 cement C.sand & STONE GRIT IN SLAB ALL COMPLETE s.i No 284(a) |
| 14 | M.S. Iron in plain work such as reinforced concrete or reinfored brick work worought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wasteges and over laping and hook all complete S.I. No 504 |
| 15 | S/F long body bib cock including all complete |
| 16 | S/F CPVC pipe 15mm dia including all complete D.S.R 18.9.1 |
| 17 | S/F CPVC pipe 20mm dia including all complete D.S.R 18.8.2 |
| 18 | S/F of PVC tank including all complete |
| 19 | PVC waste pipe 40mm dia for WHB all complete. |
| 20 | Fixing size P or S trab for water closet all |
| 21 | 25mm thick C.Cfloor inl :2:4 cement c.and & stone grit all complete.I.N0 |
| 22 | SIL ofvetrified Tiles all com lete.d.s.rl 1.49.1 |
| 23 | upp an ceramic glazed wall tiles make all colours all complete,DSR 8.31 |
| 24 | P/F White Glazed earten ware pan 580X440mm dia (Orissa pan) with 10 lita low level flushing cistern including flush etc |
| 25 | SIF Hand Wash basin size 630x650etc D.S.R 17.7.7 all complete |
| 26 | M. Siron in fabrication work all complete S.I.NO 503 &Frame & door & vantilation |
| 27 | Squatting type Urianal seats for standard size450mmx350mm all complete |
| 28 | Flate back or angularfront liper urinal basin of white glazed earthen ware465x355x265mm aquar etc all complete |
| 29 | S/F Summersebelpump all cpmplete |
| 30 | painting two coat all complete |
| 31 | Earth work cutting & filling itwluding 3.00km all complete |
| 32 | S/L of G.S.B all complete |
| 33 | Rubber moulded reflective Zig -Zag 80mm providing and laying of Interlocking concrete block pavement having thickness 80mm as |
| 34 | Handpump all complete |
| 35 | Electrician fiting & water plumring all complete |
| 36 | S/F Sign board at site all comp[lete Please Enable Macros to View BoQ information |