| 1 | Earth work in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out. Construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50mtr dressing of sides and bottom and back filling in trenches with excavated suitable material and as per the direction of Engineer-in-Charge. Including carriage of materials within all leads and lifts and other incidental. including hauling of materials in all leads, lifts and other incidental, as per the entire satisfaction and directions of Engineer-in-Charge . The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government but execulding GST. |
| 2 | Providing and laying mechanically mixed and vibrated plain cement concrete nominal mix 1 : 4: 8( one cement : four sand : eight graded crushed /broken stone aggregate 40mm ( forty millimeter) nominal size in open foundation . in or under water including pumping or bailing out water, dewatering, removal of slush as required at site, which may arise at the time of laying under water complete as per drawings and M.O.R.D. technical specifications Clause 802, 803, 1202, and 1203including Caariage of materials in all leads, lifts and other incidental, as per the entire satisfaction and directions of Engineer-in-Charge . The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government but execulding GST. |
| 3 | Providing and laying cement concrete 1:3:6 (1 cement:3 sand:6 graded stone aggregate 40mm nominal size) excluding cost of centring and shuttering in: Foundations and plinth mixed and vibrated mechanically and curing complete excluding the cost of form work in foundation and plinth in all depths including carriage of materials within all leads and lifts and other incidental charges. including Caariage of materials in all leads, lifts and other incidental, as per the entire satisfaction and directions of Engineer-in-Charge . The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government but execulding GST. |
| 4 | Providing and laying mechanically mixed and vibrated cement concrete for plain / reinforced concete in sub structure for all type of structure complete of plain cement concrete grade M-15 (M-fifteen ) nominal mix ( 1:2½:5 : ( one cement; two and half sand: five graded /crushed stone aggregate 20mm ( twenty millimeters ) nominal size in or under water and curing complete including pumping, or bailing out water , dewatering, removal of slush, as required at site which may arise at the time of laying under water complete for all heights / depths including cost of form work as per drawings and M.O.R.D. technical specifications clause 802, 804, 805, 806 , 807 1202 including Caariage of materials in all leads, lifts and other incidental, as per the entire satisfaction and directions of Engineer-in-Charge . The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government but execulding GST. |
| 5 | Laying concrete cradle bedding with M.15 Grade Cement concrete as per clause 1105(I) drawing and as per technical specification clause 802, 803, 1202, 1203including Caariage of materials in all leads, lifts and other incidental, as per the entire satisfaction and directions of Engineer-in-Charge . The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government but execulding GST. |
| 6 | Providing and laying reinforced cement concrete pipe NP2 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection work, back filling, concrete and masonary work in head walls and parapets clause 1108. 900mm dia.including Caariage of materials in all leads, lifts and other incidental, as per the entire satisfaction and directions of Engineer-in-Charge . The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government but execulding GST. |
| 7 | Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301including Caariage of materials in all leads, lifts and other incidental, as per the entire satisfaction and directions of Engineer-in-Charge . The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government but execulding GST. |
| 8 | Providing weep hole in brick masonary/stone masonry/plain/reinforced concrete abutment wing walls return wall with 100mm dia AC Pipe extending through the full with the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and MORTH technical specification clause 614, 709, 1204.3.7including Caariage of materials in all leads, lifts and other incidental, as per the entire satisfaction and directions of Engineer-in-Charge . The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government but execulding GST. |
| 9 | Back filling with boulder behind abutment wing and return wall complete as per drawings and technical Specifications clause 1204.3.8 including Caariage of materials in all leads, lifts and other incidental, as per the entire satisfaction and directions of Engineer-in-Charge . The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government but execulding GST. |
| 10 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5including Caariage of materials in all leads, lifts and other incidental, as per the entire satisfaction and directions of Engineer-in-Charge . The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government but execulding GST. Please Enable Macros to View BoQ information |