| 1 | Providing ISI mark G.I. pipe of following class and dia. excluding GST levied by GOI & GOM in all respect, inspection charges, transportation to stores, etc.completeasperIS-1239/2004. Note : One coupler shall be provided with each full length of pipe cost of which is included in ratesbelow. MEDIUM 100mm.(12.40kg./m) |
| 2 | Lowering,specials laying and jointing of following class and diameter including conveyance from stores to site of works, all labour, etc. complete either underground or in vertical position,as directed by Engineer-in-charge. MEDIUM 100mm.(12.40kg./m) |
| 3 | Providing and fixing 100 mm dia GI flange of approved quality including cost of rubber packing, nuts and bolts etc all complete as per instruction of Engineer in charge. |
| 4 | Providing and fixing C.I. double acting air valve of approved quality with bolts, nuts, rubber insertions etc. complete (The tail pieces, tapers etc if required will be paid separately) : 100 mm dia |
| 5 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia |
| 6 | Supply and distribution of water by mobile tanker minimum 5 KL capacity at Sasti Village under sasti sub area by using water tanker including payment of Driver, khalasi, diesel, mobile oil , hiring charges of tanker complete as per the instructions of engg in charge. |
| 7 | Supplying, erecting, testing and commissioning of fully automatic star/delta starter suitable for 12.5 HP to 15 HP for three phase squirrel cage motor totally enclosed with overload and no volt relay complete erected on provided angle iron frame. |
| 8 | Supplying, erecting, testing and commissioning of minimum three & above star rated submersible pumpset of 7.5 kW/10 HP with 415 V, three phase, 50 Hz A.C. supply suitable for 150 mm dia. borewell with110 to 510 lpm discharge at 154 to 35 m head & discharge & delivery pipe of size-80 mm dia. with a necessary H type clamps as per specification no. WP-SMP |
| 9 | Providing and fixing C.I. sluice valves (with cap) complete with bolts, nuts, rubber insertions etc. (the tail pieces if required will be paid separately) :100 mm diameter Class II |
| 10 | Providingandsupplying instandard lengths Polyethelene Pipes, confirming to IS4984/14151 / 12786 / 13488 with nesessary jointing material like mechanical connector i.e.thread/ insert joint/ quick release coupler joint / compression fitting joint or flanged joint excluding coupler/specials, including transportation and freight charges, inspectioncharges, loading / unloading charges, conveyancetothedepartmental stores & stacking the same in closedshadeduly protecting from sunrays &rains, excluding GST levied byGI & GO Minallrespect etc.complete. Note:-H.D.P.E.Pipesshallbeasper latest IS Specifications AlsoHDPE pipesupto 110mm Diashall bein coil form PE-100,8Kg/Sq.cm: 125mm |
| 11 | Lowering,/Laying/andJointing H.D.P.E./ M. D. P. E. pipes in proper position including all specials by compression fitting/electrofusion and butt fusion jointing procedure as per relevent IS Code complete with all materials for jointing procedure like Electrofusion machine, Electric heater/butt fusion welding machine with hydraulic jack, top loading clamp etc. and all labours as directed by engineer in charge as per IS-7634 Part II For all classes.1 125mm dia.pipe. |
| 12 | Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by \\"V\\" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge |
| 13 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |