| 1 | Dismentling of I.L.T FO LAYING SEWER LINE |
| 2 | Dismentling of c.c road Including all required material T&P etc |
| 3 | Dismantling of Old defunct sewer line |
| 4 | Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the Engineer-in-charge within a distance of 60 meter (200 feet). SI NO. 692 |
| 5 | Excavation in foundation in ordinary soil (loam,clay or sand) including lift up to 1.50 m and lead upto 30 m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the side of foundation trenches or into the plinth and removel and disposal of surplus earth as directed by engineer-in charge upto a distance of 30 m from the foundation trenches .lncluding Labour T&P etc.( pwd sor ch-04, item no 251) As per direction by engineer in-charge |
| 6 | Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.SOR SI NO. 273 |
| 7 | SUPPY AND LAYING OF RCC HUME PIPE NP-3 IN ALL COMPLETE |
| 8 | M-150 Class brick work 1:4 including all required material T&P etc.( pwd sor ch-06 item no 305)As per direction by engineer in-charge |
| 9 | 12mm Thick Plaster work mix ratio 1:3 including all required material T&P etc. ( pwd sor ch-13 item no 584) |
| 10 | Cement Concrete with 4cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour,Tools & plantsetc. required for proper completion of the work (a)Same as above item no.279 but with 2cm. gauge stone grit instead of 4 cm. gauge. SOR SI NO.279A( for sewer ling jointing) |
| 11 | Supply and Fixing of sewer manhole cover heavy duty. |
| 12 | Provision for repair of water supply house connections damaged during laying of sewers including bailing out of water and supply of all materials, labour, T&P etc. complete. |
| 13 | Barricating with approved wooden ballies vertical 10cm. Dia and 2m long fixed in ground 45 cm Deep and 2m apart including 2 rows of horizontal ballies not less than 8cm Dia 45 cm apart centre to centre tied by narial rope including cartage of all material and also including hire charges of ballies complete as direction of Engineer In charge. For two DAYS SOR NO. -3,CH NO-20,NEW ITEM-1 |
| 14 | Making temporary bunds for diviersion of drain and for making suitable working space and dismentalling of the same after completion of works with palacement of earthen / sandy bages at every suitable spacing |
| 15 | Bailing out of water from drain & other spot of trenches with engeaging the diesal pump sets with required suction and delivery pipe with proper maintenance staff and mechanic for complete work |
| 16 | Making of sewer connection from new laid sewer line with to existig sewer line .including all required material T&P and labour,and dewatering etc. |
| 17 | Making sewer house connection including all required Material T&P etc with reinstantment of all road for dismentling for sewer house connection. |
| 18 | Making bandha for sewer line by sand filling beg and dewatering of mad mixed water from manhole. |
| 19 | relaying of I.L.T ( LAMOUR CHARGES ONLY) |
| 20 | p.c.c work for Mix ratio 1:6:12 Including all required material |
| 21 | c.c work for Mix ratio 1:2:4 Including all required material |
| 22 | Disposal of malba after completation of work |
| 23 | Add 18% GST Please Enable Macros to View BoQ information |