| 1 | Dismentling of c.c road Including all required material T&P etc |
| 2 | Excavation in foundation in ordinary soil (loam,clay or sand) including lift up to 1.50 m and lead upto 30 m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the side of foundation trenches or into the plinth and removel and disposal of surplus earth as directed by engineer-in charge upto a distance of 30 m from the foundation trenches .lncluding Labour T&P etc.( pwd sor ch-04, item no 251) As per direction by engineer in-charge |
| 3 | Supply of 200 mm Ø NP-3 ISI Mark spigotted and socket non pressure pipe as per IS:458 conforming to IS:6382 ( As per up jal nigam sor) |
| 4 | Laying and jointing of RCC Np3 pipe including rubber ring and Alignment ,gradient up to depth in trench ( up jal nigam sor) |
| 5 | Concrete with 4cm gauge ,brick blast,fine sand, of 1.25 FM and cement in proportion of 1:6:12 including supply of material ,labour,tool and plant etc. ( pwd sor ch-05 item no 273) As per direction by engineer in-charge |
| 6 | M-150 Class brick work 1:4 including all required material T&P etc.( pwd sor ch-06 item no 305)As per direction by engineer in-charge |
| 7 | 12mm Thick Plaster work mix ratio 1:3 including all required material T&P etc. ( pwd sor ch-13 item no 584) |
| 8 | Supply and Fixing of sewer manhole cover heavy duty. |
| 9 | Barricating of site with wooden ballies and bans etc.(as per pwd sor CH-20 Item no 10.3 new item no-1 )As per direction by engineer in-charge |
| 10 | Making sewer connection from new laid sewer line with to existing sewer line. Including all material , labour , |
| 11 | Making bandha in sewer line by sand filed bag and dewatering of mad mixed water (L.S) |
| 12 | Making sewer connnection of house 100/135 Ø hold including all required material,excavation, T&P and including dismentling of cc road and repair c.c road after completation of work. As per direction by engineer in-charge |
| 13 | PCC work mix ratio 1:6:12 including all required material T&P etc. for reparing road ( pwd sor ch-05 item no 273) |
| 14 | PCC work mix ratio 1:6:12 including all required material T&P etc. for reparing road ( pwd sor ch-05 item no 279) As per direction by engineer in-charge |
| 15 | C.C work for jointing sewer pipe 1:1.5:3 including all required material T&P etc.(35/2.5=14 no)( pwd sor ch-05 item no284)As per direction by engineer in-charge |
| 16 | Cleaning of site After completation of work .including transportation charge with diesel and driver and all required labour T&P etc. ( pwd sor ch-03 item no 231 a)As per direction by engineer in-charge |
| 17 | Shifting of consumer water connection at the time of laying of sewer line. As per direction by engineer in-charge. |
| 18 | Add 18% GST Please Enable Macros to View BoQ information |