| 1 | E/W in cutting bed of canal including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge. |
| 2 | E/W in restoration & strengthening of bank's for making canal section in all type of soil mixed with chharry, karail, black coton soil or moorum mixed soil including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge. |
| 3 | Dismantling of old C.R.S masonary including stakingof boulder ,all labour T&Pas per direc.of Er-in-charge |
| 4 | Dismatling of C.C. of old and damaged base concrete including all cost proper disposal labour and T&P etc as per direction of Er-in-charge |
| 5 | Earth work Excavation in foundation in all type of soils including back filling of excavated earth ,all lead and lift and T&P etc. |
| 6 | Laying .C.C.(1:3:6) in foundation including cost of material, labour, T&P etc. |
| 7 | C.R.Stone masonry in 1:3 cement Coarse sand of F.M. more then 2.0 mortar and stone boulder of size 200 X 200 X 150 mm size including cost of all material labor and T&P etc . |
| 8 | Centering & shuttering for concrete work including cost of all material, labour and T&P etc. required for proper completion of work. |
| 9 | Providing and Laying LDPE Film 200 Micron below in C.C. including cost of all material, labour and T&P etc. for proper completion of work. |
| 10 | Steel Reinforcement in bed block and slab including, cutting, bending, binding and placing in proper position including cost of steel binding wire labour and T&P etc. |
| 11 | Laying R C C 1:1.5:3 including cost of all materials, labour T&P etc. |
| 12 | Deep struck cement pointing in 1:2 cement, sand mortar on stone masonry including cost of all materials labourT&P etc. |
| 13 | Laying C.C.1:1.5:3 including cost of material, labour, T&P etc. |
| 14 | Dry Stone pitching the approach including cost of all material, labour and T&P etc. |
| 15 | Colour washing of two coat of parapet including cost of all materials,labour and T&P etc. |
| 16 | Fixing wheel guard stone inclding cost of all of all materials, labours and T&P etc. |
| 17 | E/W in embankment for restoration of canal section in all type of soil mixed including all lead ,lift dressing , etc. Please Enable Macros to View BoQ information |