| 1 | E/W in cutting bed of canal including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge. |
| 2 | Excavating sand stone by pickaxes including lift up to 1.50m and lead up to 30m with all labour, T&P etc. |
| 3 | E/W in restoration & strengthening of bank's in all type of soil mixed with chharry, karail, black cotton soil or moorum mixed soil including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge. |
| 4 | Dismantling of old stone masonry with cement mortar and its disposal within 60m including all labour ,T&P etc. as per direction of Engineer-in-charge. |
| 5 | Dismantling of cement base concrete including stacking of dismantled materials within 60m as per direction of Engineer –in-charge. |
| 6 | Excavation of foundation and its back filling with all type of soil including labour, T&P etc. for proper completion of work as per direction of Engineer –in-Charge. |
| 7 | Providing and Laying LDPE Film 200 Micron below in C.C. invluding cost of all material, labour and T&P etc. for proper completion of work. |
| 8 | Laying C.C. M-10 (1:3:6) one part of cement three part of coarse sand F.M.>2.00 & six part of stone ballast (size 20 mm to 40 mm) including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. |
| 9 | C.R.S masonary in 1:3CM (one part of cement, three Part of coarse sand F.M. >2.00) including cost of labour, materials, T&P etc. For Proper completion of work as per direction of Engineer of in - charge. |
| 10 | Supplying and laying Dala Stone Grit 10-20mm. for inverted filter including all type of materials, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. |
| 11 | Supplying and laying Shankargarh Stone Balast 20-40mm.for inverted filter including all type of materials, labour ,T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. |
| 12 | Supplying and laying coarse sand FM>2 for inverted filter including all type of materials, labour ,T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. |
| 13 | Centering and shuttering of R.C.C. work including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. |
| 14 | Centering and shuttering of precast C.C. work with all labour, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. |
| 15 | Supplying & fixing 20mm thick joint filler board including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. |
| 16 | S/L 3mm thick multi-plast poly Plus Tar paper including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. |
| 17 | Reinforcement of RCC work including cost of steel, cutting, bending, placing in position & binding with 16 gauge binding wire including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. |
| 18 | Laying R.C.C. M-20 (1:1.5:3) With cement, crushed grit size 10 mm to 20mm well graded including cost oflabour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. |
| 19 | Laying C.C. M-20 (1:1.5:3) With cement, crushed grit size 10 mm to 20mm well graded including cost oflabour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. |
| 20 | Cement pointing 1:2 C.M. including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. |
| 21 | Providing and laying C.C.(1:2:4)with coarse sand cement and 10mm to 20mm crushed stone grite including cost of material, labour, T&Petc. proper completion of work as per direction of Engineer in charge. |
| 22 | Dry stone boulder Pitching 200mm thick filling joint with sand including cost of labour, material, T&P etc. for proper completion of work as per direction of in- charge. |
| 23 | Colour washing of two coat of parapet including cost of all materials,labour and T&P etc. |
| 24 | Fixing wheel guard stone inclding cost of all of all materials, labours and T&P etc. |
| 25 | Providing and Fixing of Steel Gate including cost of all materials labourT&P etc. |
| 26 | Providing and Fixing of boundary pillar along the canal every 200m interval including cost of all materia, labour and T&P etc. as per direction of Engineer in charge. |
| 27 | Laying precast C.C. block (450x450x225mm.) in D/S Canal Section including cost of materials, labour ,T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. |
| 28 | S/F 75mm.dia PVC Pipe in weep hole in retaining wall and crest including cost of materials, labour ,T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. Please Enable Macros to View BoQ information |