| 1 | Item No.1:- Excavation for foundation/ pipe trenches in earth, soils of all types, sand, gravel and softmurum, including removing the excavated material upto a distance of 50 meters and lift as below, stacking |
| 2 | Item No.2:- Excavation for foundation/ pipe trenches hard murum, and boulders WBM roads, including removing the excavated material upto a distance of 50 meters and lift as below, stacking and spreading as |
| 3 | Item No.5:- Providing and laying in situ cement concrete M-15 of trap/granite/quarzite/gneiss metal for foundation and bedding including bailing out water, from work, compaction, curing, etc. complete |
| 4 | Item No.6:-Providing and laying in situ cement concrete of trap/granite/quarzite/gneiss metal for RCC work in foundation like raft, grillage, strip foundation and footingof RCC column and steel stanchions including normal dewatering, form work, compaction, finishing and curing, etc. complete |
| 5 | Item No.7:- Providing and Casting in situ cement concrete of trap/granite/quarzite/gneiss metal of approved quality for RCC work as per detailed drawings and designs or as directed be engineer in charge including normal dewatering, centering, form work, compaction, finishing theformed surfacs with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface wherever necessary or roughening if special finish is to be provided and curing, etc. complete. |
| 6 | Item No.8:- Providing and fixing in position steel bar reinforcement of various diameters for RCC piles, caps, footings, foundations, slabs, beams, coloumn, canodie, staircases, newels, chajjas, lintels, pardies, coping, fins, arches, etc. as per detailed designs, drawing and schedulesincluding cutting, beding, hooking the bars binding with wires or tack welding and supporting as required, etc. complete (including cost of binding wire) |
| 7 | Item No.9:-Refilling the trenches with available excavated stuff with soft matertial first over pipe line and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc.complete |
| 8 | IItem No.10:- Providing and fixing 90 mm dia A.C./P.V.C. pipe weep hole at 1.5M c/c staggered including cost of all material and labour involved with all leads and lifts,etc com. Rate as per MJP D.S.R. 2021-22 I No.5, P.No 229 |
| 9 | Item No. 11:- Providing soak pit of size 120cm x 120cm x 120cm including excavating and filling with brick bats. |
| 10 | Item No.12:- Providing and fixing board displaying informaton such as name of the work tendar cost name of |
| 11 | Gst Charges 18% (On Work Portion) Please Enable Macros to View BoQ information |