|
| 1 | Construction of embankment with approved material obtained from borrow pits with all lifts upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1 and 300.2 with lead up to 1000m as per technical specification clause 301.5 |
| 2 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density as per MORD specification 401 |
| 3 | Providing, laying and spreading material on a prepared subgrade, adding cement @ 2% by weight to the spread material manually, mixing in place with Rotavator and compacting with the Road Roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base. |
| 4 | Providing, laying and spreading material on a prepared base, cement @ 4%by weight to the spread material manually, mix in place with Rotavator and compacting with the Road Roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base. |
| 5 | Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503 including cost of bitumen. MORD |
| 6 | Providing, laying and rolling of open-graded Premix Carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen (VG-10) to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in Hot Mix plant, laying and finishing with paver finisher and compaction with three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by Seal Coat 'Type-C' as per MORD Technical Specification Clause 508 including cost of bitumen. Case - II By Mechanical Means(HMP 30/40) (I) Bitumen VG-10 |
| 7 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 including cost of bitumen. Case - III : Type C By Mechanical Means(HMP 30/40) (I) Bitumen VG-10 |
| 8 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.. |
| 9 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 |
| 10 | Providing concrete (1:3:6) for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. (MORD Ch.11 Ref.800-1200) |
| 11 | Brick masonry work (1 cement : 4 coarse sand) cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 (MORD Ch.11 Ref.12-600-1200) |
| 12 | Pointing with Cement Mortar (1:3) on brickwork as per technical specification Clause MORD 613.3 |
| 13 | Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 |
| 14 | Laying Cement Concrete Pipe NP3 (burried conduits) on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapet (600 mm dia hume pipe culvert) |
| 15 | Laying Cement Concrete Pipe NP3 (burried conduits) on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapet (350 mm dia hume pipe gule culvert) |
| 16 | Providing and fixing of kilometer stone, hectometer stone, sign board and lettering & painting of culverts etc. as per direction of Engineer-in-Charge |
| 17 | Maintenance of bituminious surface road including including filling pot holes and patch repair etc, restoration of rain cuts and dressing of side slopes / shoulders, drains, culverts, guard rail and parapets, road signs, speed brakers, standing tree adjacent to road wherever required, kilimeter stone and hectometer stone, cutting of branches of trees, shrubs and trimming of grass and weeds etc, white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Anexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc lettere no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) (I) Maintainance of First Year (@0% of Total Work Amount of 1 to 15) |
| 18 | Maintenance of bituminious surface road including including filling pot holes and patch repair etc, restoration of rain cuts and dressing of side slopes / shoulders, drains, culverts, guard rail and parapets, road signs, speed brakers, standing tree adjacent to road wherever required, kilimeter stone and hectometer stone, cutting of branches of trees, shrubs and trimming of grass and weeds etc, white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Anexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc lettere no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) Maintenance cost for 2nd year @ 0.75% cost of work of Total work of amount 1 to 15 |
| 19 | Maintenance of bituminious surface road including including filling pot holes and patch repair etc, restoration of rain cuts and dressing of side slopes / shoulders, drains, culverts, guard rail and parapets, road signs, speed brakers, standing tree adjacent to road wherever required, kilimeter stone and hectometer stone, cutting of branches of trees, shrubs and trimming of grass and weeds etc, white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Anexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc lettere no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) Maintenance cost for 3rd year @ 1.50% cost of work of Total work of amount 1 to 15 |
| 20 | Maintenance of bituminious surface road including including filling pot holes and patch repair etc, restoration of rain cuts and dressing of side slopes / shoulders, drains, culverts, guard rail and parapets, road signs, speed brakers, standing tree adjacent to road wherever required, kilimeter stone and hectometer stone, cutting of branches of trees, shrubs and trimming of grass and weeds etc, white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Anexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc lettere no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) Maintenance cost for 4th year @ 2.25% cost of work of Total work of amount 1 to 15 |
| 21 | Maintenance of bituminious surface road including including filling pot holes and patch repair etc, restoration of rain cuts and dressing of side slopes / shoulders, drains, culverts, guard rail and parapets, road signs, speed brakers, standing tree adjacent to road wherever required, kilimeter stone and hectometer stone, cutting of branches of trees, shrubs and trimming of grass and weeds etc, white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Anexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc lettere no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) Maintenance cost for 5th year @ 3.00% cost of work of Total work of amount 1 to 15 Please Enable Macros to View BoQ information |