|
| 1 | 1. CONSTRUCTION OF PUBLIC DISTRIBUTION SYSTEM AT KRISHNAPURAM HABITATION IN MUNNAVALKOTTAI PANCHAYAT |
| 2 | Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete |
| 3 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. |
| 4 | Cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete |
| 5 | Filling the basement with U S Gravel including cost and conveyance of |
| 6 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete. A) Below Basement |
| 7 | . B) Above Basement |
| 8 | Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete I) Below Basement |
| 9 | II) LINTELS, RCC SLABS, BEAMS, TEE or ELL BEAMS, |
| 10 | Supplying and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting,bending, tying and forming grills for all works |
| 11 | RCC M20 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. I) upto Basement |
| 12 | .II) superstructure Ground level |
| 13 | Supplying and fabrication of the following steel doors , window,Ventilators and counter including cost and conveyance and all charges etc complete. |
| 14 | Rolling shutterof size 2.1x2.4m (RS) 2171/sqm |
| 15 | Rolling shutterof size 1.8x2.4m (RS1) |
| 16 | Steel .Door 1.00x2.10 D1 2659.26/sqm |
| 17 | Steel .Door 0.90x2.10 D2 |
| 18 | Steel window of size 1.00x1.3m 3492.59 |
| 19 | Steel ventilators of size 0.90x0.60m |
| 20 | Water Closet |
| 21 | Fixing of the following steel doors , window,Ventilators and counter including cost and conveyance and all charges etc complete. |
| 22 | Window |
| 23 | Finishing the top of the roof with one course of Machine Pressed Tiles of size 23x23x2 cm of approved quality laid in CEMENT MORTAR 1:3(One cement and three sand) 12 mm thick mixed with water proofing compound conforming to ISS by 2% weight of cement used and the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar,red oxide, etc., complete complying with standard specification |
| 24 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and th.en sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc.,complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty should be got approved by the Executive Engineer before use on work. (Based on SoR 2024-25) |
| 25 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete. |
| 26 | Providing Granolithic floor finish with CC 1:2:4 using 10-12mm hbg jelly 25mm Thick Including cost and Conveyance of all materilas Charges etc complete |
| 27 | Ceramic tiles flooring laying with new ceramic tiles of size 300x300x6 mm laid in C M 1:3 inculding cost of white cement and labour charges etc |
| 28 | Dadooing with glazed tiles of size 150x150x6mm including cost and conveyance of all materials to site and all labour charges etc complete |
| 29 | CC 1:2:4 mix using 20mm ISS HBG metal including all charges complete |
| 30 | Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete |
| 31 | Exterior Emulsion two coats with best approved Plastic Emulsion including cost and conveyance of all materials to site and all labour charges etc complete |
| 32 | Painting two coats over new iron works using ready mixed enamel paint including cost and all labour charges etc complete. |
| 33 | Wiring with 2x1.5(22/0.3) sqmm PVC unsheathed SC Copper conductor of 1100 V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories and with T.W. switch box with 5amps F.T. switch in flush with wall covered with hylum sheet of 3mm thick with painting of suitable colour with continuous earth wireconnection of 14 SWG wire for cocealed Light point/fan point (5 points per coil) [ SD No. 24 ] |
| 34 | Wiring with 2x1.5(22/0.3) sqmm PVC unsheathed SC Copper conductor of 1100 V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories and with 150×100×113mmTW switch box for 5A - 3 pin- non inter locking CS plug Including pin top with painting of suitable colour with continuous earth wire connection of 14 SWG TC wire for concealed PVC Plug Point [SD NO 37 ] |
| 35 | Supplying and fixing of water tight Bulk head fitting with guard (Philips/bajaj/crompton/Klite) suitable for incandescent lamp and 60W bulb . [ SI 85 ] |
| 36 | Supply and fixing of Metre Board on suitable T.W.box with earth connection only.[SD no.125] |
| 37 | Supplying and fixing of Tube Light SD 88 |
| 38 | Supplying and fixing of CFL bulb |
| 39 | Supplying and fixing of Ceiling FAN |
| 40 | Service wire SD 64 |
| 41 | Service Pipe SD 69 |
| 42 | Towards the charges for EB deposit |
| 43 | Providing and fixing of PVC rain water down fall pipe 110mm dia with necessary T W Clamps, Plug, Shoes, bend, Screws, nails etc., complete |
| 44 | Provision for Sanitary arrangements(Soak pits)-2nos |
| 45 | Provision for Rainwater Harwesting structure |
| 46 | Provision for PVC TANK |
| 47 | Provision for Water supply arrangements |
| 48 | Provision for Galvalume Sheet Shed Front Side (Sub Estimate) |
| 49 | Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete |
| 50 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. |
| 51 | Cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete |
| 52 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete. A) Below Basement |
| 53 | Plain Cement concrete 1:2:4 using 20mm HBG jelly including cost and conveyance of all materials to site and all labour charges |
| 54 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum |
| 55 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 56 | Fabrication of Supply of Steel grill gate using structural steel in all aspects as directed |
| 57 | Supplying and fixing colour galvalume sheet roof of 0.47mm thickand steel tubular box section of 100x50x3mm of 1meter interval including priming coat fixing in position with all necessary accessories complete complying with standard specification and as directed by the departmental officers. |
| 58 | Provision for 1/2 HP Motor |
| 59 | Painting and lettering of Name board |
| 60 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |