| 1 | Clearing Scrub jungles with uprooting, disposed from the site as per the direction of site engineer including cost of all labour, lead, lift, etc., complete. |
| 2 | Dismantling of Brick Masontry in Cement Mortar, Clearing away and carefully stacking materials usefull for re use for any thickness of walls including cost of T&Ps, Labour, lead, lift etc., complete. |
| 3 | Dismantling of RCC, Clearing away malba including cost of T&Ps, Labour, lead, lift etc., complete. |
| 4 | Dismantling of PCC, Clearing away malba including cost of T&Ps, Labour, lead, lift etc., complete. |
| 5 | Dismantling of floor finish & dadooing wall with tiles/slabs, etc., clearing away malba including cost of T&Ps, Labour, lead, lift etc., complete. |
| 6 | Dismantling of pressed tiles & weathering course, clearing away malba including cost of T&Ps, Labour, lead, lift etc., complete. |
| 7 | Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders. |
| 8 | Supplying and filling with M.Sand for foundation, Basement,etc., including cost of material, labour, lead, lift, consolidation, etc., complete. |
| 9 | PCC 1:3:6 using 20mm HBG metal for foundation, basement including cost of all materials, labour, lead, lift, etc. complete. |
| 10 | RCC 1:1.5:3 using 12-20mm HBGS with formwork including cost of all materials, centering, curing, all labour charges, lead, lift, etc., complete. But excluding cost of steel reinforcement. |
| 11 | RCC 1:1.5:3 using 12-20mm HBGS with formwork including cost of all materials, centering, curing, all labour charges, lead, lift, etc., complete. But excluding cost of steel reinforcement. (For RCC Precast Slab) |
| 12 | Providing & placing of steel reinforcement for All RCC works including cost of steel rod, binding wire, other materials, labour, T&P, lead, lift, etc., complete. |
| 13 | Labour Chrages for transportation of RCC precast slab from casting yard to curing tank, further to cable duct location, laying to proper alignment,etc., including cost all labour, T&P, lead, lift, etc., complete. |
| 14 | Brick work in CM 1:5 using II class champer burnt bricks for super & substructure, partition wall, including cost of all materials, labour charges, lead, lift, etc., complete. |
| 15 | Supply, fabrication, fixing of GI angles of 50x50x6mm horizontally @ 50cm c/c to the required length for supporting the cable in the cable duct in correct position including labour, cutting, etc., complete. |
| 16 | Refilling with excavated earth other than sand in foundation, basement and sides of masonry, consolidation as per std.specn.with water including all labour, T&P, lead , lift, etc., complete. |
| 17 | Supplying and filling of gravel complying with standard specification for filling in foundation & basement, well rammed, watered and consolidated etc. complete |
| 18 | Plastering with CM 1:5, 12mm thick in sub/super structure including cost of all materials, labour, lead, lift, etc., complete. |
| 19 | Providing weathering course with PCC 1:2:4 using 6-10 mm HBGS jelly of a average thickness of 7.5 cm with water proofing compound @2.5% cement weight andand over minimum shrinkage reinforcement, finishing the top with C.M 1:5, 12mm thick, including cost of all materials, pointing, labour, curing, finishing with proper slope, lead, lift, etc., complete. |
| 20 | Providing PVC down fall pipe using 110mm dia 4 Kg/sqcm PVC pipe and pvc clamp line supreme, etc, including fixing PVC washer type door bend & shoe, in correct position and connecting from the roof slab including cost of all materials, labour, transport, lead, lift, etc., complete. |
| 21 | White washing two coats with white cement, including cost of all materials, labour, scrapping/ preparation of surface with sand paper, scaffolding, etc., complete. |
| 22 | Painting with two coats of interior emulsion of approved quality and colour over a priming coat for interior wall surfaces including cost of all materials, labour, lead, lift, T&P, etc. complete. |
| 23 | Flooring with Vitrified tiles 600x600mm of approved Quality, design & colour (Johnson or equivalent make) laid in cement mortar 1:3 -20mm thick including pointing with same coloured cement using 0.4kg/Sqm, finishing the joints, including cost of all materials, labour, lead, lift, etc., complete. |
| 24 | Flooring with Acid Proof Ceramic Floor Tiles 6mm thick of approved Quality, design & colour laid in cement mortar 1:3 -20mm thick including pointing with same coloured cement using 0.4kg/Sqm, finishing the joints, including cost of all materials, labour, lead, lift, etc., complete. |
| 25 | Providing granolithic floor finish with PCC 1:2:4 using 6-10 mm HBGS jelly of 20mm thick, including cost of all materials, labour, curing, finishing with proper slope, lead, lift, etc., complete. |
| 26 | Dismantling & clean removal of loose cement plaster from walls, ceilling, clearing away malba including cost of T&Ps, Labour, lead, lift, removal of rust in exposed steel, etc., complete. |
| 27 | Plastering with CM 1:3, 12mm thick with anti rust epoxy primer treatment, sbr latex bonding agent for ceilling, including cost of all materials, labour, lead, lift, etc., complete. |
| 28 | Plastering with CM 1:5, 12mm thick with sbr latex bonding agent, including cost of all materials, labour, lead, lift, etc., complete. |
| 29 | Removal of existing aluminium door shutter with removal of hinges, pivots, fastenings and realigning sagged door including tightening/ replacing rubber breading, clip, hinges and re-fixing in proper alignment complete. |
| 30 | Supply and fixing cuddapah slab of size 38/40mm thick at lintel level to support masonry work in super structure including cost of material. Labour, lead, lift, etc, complete |
| 31 | Supplying and fixing in position of UPVC Long Body Tap 15/12 mm dia to water supply line, etc., complete. |
| 32 | Supplying and fixing in position of tubular steel sections of various profile to support overhead water tank, ladder, etc., including cutting, hoisting, cost of all materials, labour, T&P, lead, lift, etc., complete. |
| 33 | Painting new iron works such as windows with grills, balustrades, doors etc., with two coats of synthetic enamel paint of approved colour over one coat of red oxide primer including cost of all materials, labour, scaffolding, completing scrapping & removing of old paint, lead, lift etc., complete |
| 34 | Dismantling,carefully stacking the existing chequered plate, various MS or GI steel sections from cable duct to the nearby area for re use as directed by engineer incharge, including cost of all machineries, labour,lead,lift, etc., complete |
| 35 | Reinstalling the dismantled various MS or GI steel sections on the cable duct to support pannel as directed by engineer incharge, including cost of all machineries, labour,lead,lift,T&P, welding, etc., complete |
| 36 | Reinstalling the dismantled chequered plates on the cable duct to support pannel as directed by engineer incharge, including cost of all machineries, labour,lead,lift,T&P, welding, etc., complete |
| 37 | SGST & CGST (If applicable quote the value or enter '0') |
| 38 | IGST (If applicable quote the value or enter '0') Please Enable Macros to View BoQ information |