|
| 1 | Supply of Decentralized material as per UPCL Norms. |
| 2 | Top channel clamp for SP-33 with nut and bolt. |
| 3 | Holding clamp for Garuding. |
| 4 | Top Channel Clamp for SP-55. |
| 5 | Bracing clamp top SP-55 with nut and bolt. |
| 6 | X Arm Clamp for ST Pole SP-55 with nut and bolt. |
| 7 | X Arm holding clamps for SP-33 with N&B. |
| 8 | X arm clamp for SP-23 without nut and bolt. |
| 9 | Earth wire clamp for SP-55 with nut and bolt. |
| 10 | Stay clamp for SP-23 with nut and bolt. |
| 11 | Stay clamp for SP-55 with nut and bolt. |
| 12 | Stay clamp for SP-33 with nut and bolt. |
| 13 | Earth wire clamp for SP-23 with nut and bolt. |
| 14 | Clamp for danger board. |
| 15 | Bracing clamp for St SP-33 top with nut and bolt. |
| 16 | Earth wire clamp for SP-33 with nut and bolt. |
| 17 | Bottom bracing clamp for SP-33 nut and bolt. |
| 18 | HT stay insulator. |
| 19 | Bracing clamp bottom with nut and bolt. SP-55. |
| 20 | Bracing clamp top for SP-23 with nut and bolt. |
| 21 | Bracing clamp bottom for SP-23 with nut and bolt. |
| 22 | Danage board. |
| 23 | 11 KV fuse set. |
| 24 | Bolt and nuts off size. |
| 25 | Top Channel Holding clamp for SP-23 Pole. |
| 26 | Following work as per UPCL norms & site requirement. |
| 27 | Chemical Earthing. |
| 28 | Erection of Earthing Rod. |
| 29 | Fabrication of steel. |
| 30 | Excavation of pit for stay set. |
| 31 | Erection of 11 KV stay set. |
| 32 | Grouting of stay set. |
| 33 | Excavatin of pit for pole. |
| 34 | Erection of Single SP-23 pole. |
| 35 | Erection of Single SP-33 Pole. |
| 36 | Erection of single SP-55 Pole. |
| 37 | Erection of SP-23 dbouble pole. |
| 38 | Erection of SP-33 dbouble pole. |
| 39 | Erection of SP-55 dbouble pole. |
| 40 | Grouting of pole. |
| 41 | Muffing of pole. |
| 42 | Fixing of Fuse set. |
| 43 | Erection of bracket in 11 KV line. |
| 44 | Laying of Rabbit conductor in HT line. |
| 45 | Gurading of LT/11 KV line. |
| 46 | Lopping and chopping of tree branchases. |
| 47 | Making of section pole. |
| 48 | Cartage of SP-21/23 pole, 21-50 Km. |
| 49 | Cartage of SP-33 Pole, 21-50 Km. |
| 50 | Cartage of SP-55 pole, 21-50 Km. |
| 51 | Cartage of petty material, 21-50 Km. |
| 52 | Headload Cartage of SP-21/23 pole, 0-1 Km. |
| 53 | Headload cartage of SP-33 poe, 0-1 Km. |
| 54 | Headload Cartae of SP-55 Pole, 0-1 Km. |
| 55 | Headload cartage of material, 0-1 Km. |
| 56 | Installation of danger board/ Number plate. |
| 57 | Fixing of 11 KV in insulator. |
| 58 | Supply and fixing of Anti clambing device. |
| 59 | Fabrication, mounting fixing brecing set on double pole. |
| 60 | Erection of stay clamp. |
| 61 | Fixing accessories on double pole. SP-55. |
| 62 | Fixiing of accessories on dboubel pole SP-33. |
| 63 | Painting of single pole (SP-23), |
| 64 | Painting of single pole (SP-33), |
| 65 | Painting of single pole (SP-55), Please Enable Macros to View BoQ information |