| 1 | Earth work in excavation of foundation trenches in all sorts of soil, including removing spreading or stacking the spoils within a lead of 7.5 m. as directed and including trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing or pumping out water as required complete. |
| 2 | Filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. |
| 3 | Single Brick Flat soling of Picked Jhamma Bricks including ramming and dressing bed to proper level and filling joints with local sand including cost of sand. |
| 4 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuutering and reinforcement, if any, in ground floor |
| 5 | Hire and Labour charges for shuttering of concrete Roof Slabs, Beams, Lintels etc. including provision of stout vertical props where necessary upto height of less than 3.6 m. and concrete thickness of less than 15cm. Fitting, fixing and striking out after completion of work, Without prop |
| 6 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. |
| 7 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor. |
| 8 | Brickwork in cement mortar (prop. 6:1) including cost of scaffolding and other incidental works etc. complete, in superstructure ground floor. |
| 9 | Plaster (i) With 1:6 cement mortar (c) 15 mm thick plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/ staging where necessary (Groundfloor). [Excludingcost of chipping over concrete surface] |
| 10 | Display Board writing & photo (3 phase). |
| 11 | Add CGST @ 9.00% of Total Cost |
| 12 | Add SGST @ 9.00% of Total Cost |
| 13 | Labour welfare cess @ 1.00% |
| 14 | Add Contigency Please Enable Macros to View BoQ information |