Tender For Deposit Work For Jhatpat Portal Nivesh Mitra Ptw Pwd New Connection And Line Shifting Etc Under Edd Saifai
Tender Overview
Project Description
Tender For Deposit Work For Jhatpat Portal Nivesh Mitra Ptw Pwd New Connection And Line Shifting Etc Under Edd Saifai- 1 Safe Carriage Of Following Materials From Store Center Kunera Etawah To Site Of Work Through The Kacha And Pakka Road Including Its Loading And Unloading At The Respective Ends And Erection, Installation, Shifting Commissioning Of Single Pole/Double Pole Of Lt/Ht Overhead Lines And Transformers Completing With Same Following Materials. Cost Of Labour, Cartage, T&P Etc. Which Is Required For Completion Of Work As Per Respo Norms Is Included In The Work. 2 11 Mtr. Long St Pole 3 8.5 Mtr. Long Pcc Pole 4 Acsr Weasel Conductor 5 Lt Abc (1X25+1X16 Sqmm) 6 Lt Abc (3X50+1X35+1X16 Sqmm) 7 Lt Abc (3X120+1X95+1X16 Sqmm) 8 Abc Cable (3X95+1X35+1X16 Sqmm) 9 Alluminium Armourd Cable 3.5X50 Sqmm 10 Alluminium Armourd Cable 3.5X120 Sqmm 11 100 Kva Transformer 11/0.4 Kv 12 63 Kva Transformer 11/0.4 Kv 13 25 Kva Transformer 11/0.4 Kv 14 16 Kva Transformer 11/0.4 (I/P) 15 Ct/Pt Pole Mounted Unit 16 11 Kv Pinphar Proof Metering Unit 17 Stay Set Complete 18 Earthing Complete 19 11 Kv Pin Insulator With Pin 20 11 Kv Disc Insulator With Fitting 21 11 Kv Dp Clamp For Pcc Pole 22 F-Bracket 23 Stay Wire 6 Sqg/10 24 Lt Clamp 25 Clamp With Nut Bolt 26 Stay Insulator 27 Stay Clamp 28 Gi Wire 8 & 10 Swg. 29 11 Kv V-Type X Arm 30 11 Kv Fuse Set 31 Single Phase Distribution Clamp 32 Three Phase Distribution Box 33 Ms Bracing Angle 34 Top Channel 35 Nut & Bolt 36 Dropper Channel 37 Ms T/F Base Angle 38 T-Off Channel 39 Guarding Angle 40 11 Kv Holding Clamp 41 Suspension Clamp 42 Pg Clamps 43 Dead End Clamp 44 Eye-Hook 45 Concreting Of Pole 46 Concreting Of Stay
BOQ
| Sl. No. | Item Description |
| 1 | Safe carriage of following materials from store center kunera etawah to site of work through the kacha and pakka road including its loading and unloading at the respective ends and Erection, installation, shifting commissioning of single pole/double pole of LT/HT overhead lines and transformers completing with same following materials. Cost of labour, cartage, T&P etc. which is required for completion of work as per RESPO Norms is included in the work. |
| 2 | 11 Mtr. Long ST Pole |
| 3 | 8.5 Mtr. Long PCC Pole |
| 4 | ACSR Weasel Conductor |
| 5 | LT ABC (1x25+1x16 Sqmm) |
| 6 | LT ABC (3x50+1x35+1x16 Sqmm) |
| 7 | LT ABC (3x120+1x95+1x16 Sqmm) |
| 8 | ABC Cable (3x95+1x35+1x16 Sqmm) |
| 9 | Alluminium armourd Cable 3.5x50 Sqmm |
| 10 | Alluminium armourd Cable 3.5x120 Sqmm |
| 11 | 100 KVA Transformer 11/0.4 kv |
| 12 | 63 KVA Transformer 11/0.4 kv |
| 13 | 25 KVA Transformer 11/0.4 kv |
| 14 | 16 KVA Transformer 11/0.4 (I/P) |
| 15 | CT/PT Pole Mounted Unit |
| 16 | 11 KV Pinphar Proof Metering unit |
| 17 | Stay Set Complete |
| 18 | Earthing Complete |
| 19 | 11 KV Pin Insulator with Pin |
| 20 | 11 KV Disc Insulator with Fitting |
| 21 | 11 KV DP Clamp for PCC Pole |
| 22 | F-Bracket |
| 23 | Stay Wire 6 Sqg/10 |
| 24 | LT Clamp |
| 25 | Clamp with Nut Bolt |
| 26 | Stay Insulator |
| 27 | Stay Clamp |
| 28 | Gi wire 8 & 10 Swg. |
| 29 | 11 KV V-Type X Arm |
| 30 | 11 KV Fuse Set |
| 31 | Single Phase Distribution Clamp |
| 32 | Three Phase Distribution Box |
| 33 | MS Bracing Angle |
| 34 | Top Channel |
| 35 | Nut & Bolt |
| 36 | Dropper Channel |
| 37 | MS T/F Base Angle |
| 38 | T-Off Channel |
| 39 | Guarding Angle |
| 40 | 11 KV Holding Clamp |
| 41 | Suspension Clamp |
| 42 | PG Clamps |
| 43 | Dead End Clamp |
| 44 | Eye-Hook |
| 45 | Concreting Of Pole |
| 46 | Concreting Of Stay |
| 47 | Chemical Pipe Earthing Body & Neutral Of Transformer and connections with supply as per Norms. |
| 48 | Shifting Charge 100 KVA Transformer |
| 49 | Shifting Charge 63 KVA Transformer |
| 50 | Shifting Charge 25 KVA Transformer |
| 51 | Shifting Charge 10 &16 KVA Transformer |
| 52 | Carriage of Scrap Material from Pit Site to J.E Store Kunera Etawah through the Kacha and Pakka road including the work of its loading and unloading at the respective ends. The cost of arrangement of labour, T&P, carrier etc. which is required for proper completion of work is included the work. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender