|
| 1 | Item Description/ Heading |
| 2 | 1 set Water generator pump overhauling with 2 pc bearing and impellar shaft welding machining & key thread making etc. |
| 3 | 2 pis cross new supply and fittings |
| 4 | Mobil change with filter supply and fittings |
| 5 | Complete diesel pipe repairing |
| 6 | Self repairing |
| 7 | Changing of indicator switch assembly |
| 8 | Clutch overhauling with clutch change |
| 9 | Change of rear hub axle stake |
| 10 | 4 set Patti high and pin bush change |
| 11 | 4-wheel greasing with parts |
| 12 | 1 set water pump new supply |
| 13 | Steering kit changes |
| 14 | Changing of steering tie rod with pipe |
| 15 | Brake servo change |
| 16 | Body chassis change |
| 17 | Kin pin overhauling |
| 18 | Centre bearing with cross member change |
| 19 | Differential overhauling with required materials |
| 20 | Battery box new making (Prevailing market price) |
| 21 | Centre bearing overhauling with required materials |
| 22 | Engine oil changing |
| 23 | M.C. Changing |
| 24 | Clutch plate changing |
| 25 | Brake overhauling & liner changing |
| 26 | Fan belt changing |
| 27 | Doors and window glass rubber change (Prevailing market price) |
| 28 | W.C. replacement |
| 29 | 6 quantity of FIP calibration changing with nozzle |
| 30 | Second class welding with 10ft. channel supply and fitting. |
| 31 | 1 set radiator new supply and fitting with cashing and mounting |
| 32 | Dynamo overhauling with necessary materials |
| 33 | Tie rod changing in both sides |
| 34 | Steering box overhauling with required materials |
| 35 | Release bearing changing |
| 36 | Tel crown overhauling with materials |
| 37 | Electric wiring complete checking with necessary spare parts |
| 38 | Air compressor changing |
| 39 | Mobil change with new filter supply & fittings |
| 40 | 2 set new cross supply and fitting |
| 41 | 1 set Water generator pump overhauling with 2 pc bearing and impellar shaft welding machining & key thread making etc. |
| 42 | Steering kit change |
| 43 | 4-wheel greasing with parts |
| 44 | wheel brake repair with parts |
| 45 | Brake servo change |
| 46 | Diesel tank pipe change |
| 47 | Complete vehicle painting and denting |
| 48 | Complete repairing of lights |
| 49 | Pressure plate new fitting |
| 50 | 4 set patti pin bush change |
| 51 | Clutch plate new fitting |
| 52 | Flywheel machining and with alignment |
| 53 | Gear box opening and fitting after necessary |
| 54 | Full Vehicle servicing with all filter change |
| 55 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |