| 1 | work description |
| 2 | Dismantling of broken drum shell & side chick with boss by welding and grousing and gas cutting and hydaulic pressure |
| 3 | Cost of making of new Drum Shell by rough materials (M.S. Plate- EN-8) (size: 1078mm width X 1450mm long X 14mm thick) |
| 4 | Cost of bending of plate for making of new Drum shell. |
| 5 | Cost of machining of new Drum shell for proper shape & size. |
| 6 | Cost of new Chick plate machining and Drum Boss finally welding & machining. |
| 7 | Drum shaft rebuilding by welding & machining of bearing journal of both ends |
| 8 | ESAB Duriod-250 (4mm) electrodes |
| 9 | Gas (DA & Oxygen) |
| 10 | Welding charges |
| 11 | Making stripner / Rib |
| 12 | Fitting of Drum shaft/Chick, balancing |
| 13 | Dismantling of broken drum shell & both side chick with boss by welding & grousing & gas cutting and hydraulic pressure |
| 14 | Cost of making of new Drum Shell by rough materials (M.S. Plate- EN-8) (size: 1078mm width X 1450mm long X 14mm thick) |
| 15 | Cost of bending of plate for making of new Drum shell. |
| 16 | Cost of machining of new Drum shell for proper shape & size. |
| 17 | Cost of making of new Chick plate of Raw materials (MS Plate- EN-8) (size: 350mm X 350mm X 16mm thick) |
| 18 | Cost of new Chick plate machining and Drum Boss finally welding & machining. |
| 19 | Cost of Raw materials (EN-24) Steel round for making of new shaft (size: 110mm dia X 1840mm long). |
| 20 | Machining charges |
| 21 | New Key-way cutting |
| 22 | ESAB Duriod-250 (4mm) electrodes |
| 23 | Gas (DA & Oxygen) |
| 24 | Welding charges |
| 25 | Making stripner / Rib |
| 26 | Cost of fitting of Drum shaft & Drum Chick with Boss on Shell hydraulic pressure and final welding & machining and checking static Balancing. |
| 27 | Dismantling of broken drum shell & both side chick with boss by welding & grousing & gas cutting and hydraulic pressure |
| 28 | Cost of making of new Drum Shell by rough materials (M.S. Plate- EN-8) (size: 758mm width X 1450mm long X 12mm thick) |
| 29 | Cost of bending of plate for making of new Drum shell. |
| 30 | Machining of new Drum shell |
| 31 | ESAB Duriod-250 (4mm) electrodes |
| 32 | Gas (DA & Oxygen) |
| 33 | Welding charges |
| 34 | Making stripner / Rib |
| 35 | welded shaft maching as per size |
| 36 | Fitting, welding & static Balancing |
| 37 | Transporting Charges to and fro |
| 38 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |