| 1 | Earth work excavation of foudnation in hard soil within initial lead and lift includng dressing and levelling the bed etc. complete as per direction of the Engineer in charge. |
| 2 | Filling in foundation & plinth with sand, including watering and ramming etc. with cost, conveyance royalty etc. complete as per direction of the Engineer in charge. |
| 3 | Cement concrete in CM (1:3:6) using 40mm size HGB metal etc. with cost, conveyance royalty etc. complete as per direction of the Engineer in charge. |
| 4 | Brick work with Fly Ash bricks having crushing strength not less than 75 kg/cm2 in cement mortar (1:6) in foundation and plinth etc. with cost, conveyance royalty etc. complete as per direction of the Engineer in charge. |
| 5 | Brick work with Fly Ash bricks having crushing strength not less than 75 kg/cm2 in cement mortar (1:4) in foundation and plinth etc. with cost, conveyance royalty etc. complete as per direction of the Engineer in charge. |
| 6 | RCC work of M-20 grade with 20mm and down grade black hard granite (crusher broken) stone chips including hoisitng and laying (Vide A/R 2006, P-50, item No.04) etc . with cost, conveyance royalty etc. complete as per direction of the Engineer in charge. |
| 7 | Column Base |
| 8 | Grade beam |
| 9 | Column, roof Beam |
| 10 | Lintel |
| 11 | Chajja |
| 12 | Roof Slab, landing |
| 13 | Supplying fitting and placing uncoated HYSD bar reinfordement complete as per drawing and technical specification vdie A/R |
| 14 | Brick work with Fly Ash bricks having crushing strength not less than 75 kg/cm2 in cement mortar (1:6) in Superstructure etc. with cost, conveyance royalty etc. complete as per direction of the Engineer in charge. |
| 15 | 20mm thick C.P. in cm (1:4) for grading plaster with all cost carriage, royality etc, complete with cost, conveyance royalty etc. complete as per direction of the Engineer in charge. |
| 16 | 12mm thick C.P. (1:4) over brick work with all cost carriage, royality etc, complete (Vide A/R 2006 P 106 item no. 16) with cost, conveyance royalty etc. complete as per direction of the Engineer in charge. |
| 17 | 6mm thick C.P. (1:4) over concrete work with all cost carriage, royality etc, complete (Vide A/R 2006 P 109 item no. 26) with cost, conveyance royalty etc. complete as per direction of the Engineer in charge. |
| 18 | 12mm thick C.P. (1:6) over brick work with all cost carriage, royality etc, complete (Vide A/R 2006 P 106 item no. 16) with cost, conveyance royalty etc. complete as per direction of the Engineer in charge. |
| 19 | 16mm thick C.P. in cm (1:6) over brick work with all cost carriage, royality etc, complete as per direction of the Engineer in charge. |
| 20 | Supplying fittinhg & fixing of industrial vetrified tiles (30x30 )cm in floors of approved make laid on 20mm thick cement mortar (1:4) etc. complete. |
| 21 | Fixing industrial vetrrified tiles in dadois skirting and rise of steps on 12mm thick bed etc. complete. |
| 22 | Filling in foundation & plinth with sand, including watering and ramming etc. with cost, conveyanace royalty etc. complete as per direction of the Engineer in charge. |
| 23 | Providing fitting fixing of aluminium door for lavatory ( asper A/R - 2006 page- 242 Sl. No.10) etc. complete as per direction of the Engineer in charge. |
| 24 | Supplying of doors and windows made out of MS sheet /G.I. Sheet of 16 to 18 gauge etc. complete as per direction of the Engineer in charge. |
| 25 | Labour for fitting and fixing of M.S. Doors windows and Girls in position etc. complete. as per direction of the Engineer in charge. |
| 26 | Painting two coats with synthetic anamel paint of approved quality, brand and shade over a coat of primer of apprved qualityh etc. complete., as per direction of the Engineer in charge. |
| 27 | Providing weather coat (two coat) to outer wall surface over one coat of priming etc. complete as per direction of the Engineer in charge. |
| 28 | Painting two coats with Distemper over one coat of priming etc. complete as per direction of the Engineer in charge. |
| 29 | Cost towards Transparancy Board and photographs etc., complete. as per direction of the Engineer in charge. Please Enable Macros to View BoQ information |