|
| 1 | Charges for conducting Geophysical Survey to locate for favourable point for drilling 6\\" dia borewell |
| 2 | Providing 6\\" dia borewell in hard rock area including all accessories etc., complete as per standard specifications. |
| 3 | Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches for laying of pipes for water supply in the following type of soils Hard stiff clay, stiff black cotton, hard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil as Directed by the Departmental officers |
| 4 | 63mm PVC pipe |
| 5 | Supplyof Materials |
| 6 | 63mm Pvc pipe |
| 7 | 20mm GI pipe |
| 8 | 50mm GI pipe |
| 9 | Waste Not Tap |
| 10 | 20mm G.I. Equal Elbow plain |
| 11 | 20mm G.I. Equal Tee plain |
| 12 | 20mm G.I. Coupling |
| 13 | 63mm Pvc coupling |
| 14 | 63mm Pvc Elbow |
| 15 | 63mm Pvc tee |
| 16 | 63mm Pvc bend |
| 17 | 63mm Pvc End cap |
| 18 | 63 mm x 20 mm PVC saddle piece |
| 19 | 63 mm x 50 mm PVC REDUCER COUPLER |
| 20 | 63mm HDPE pipe |
| 21 | Lowering of 63mmPVC Pipes and Specials in the trenches and laying to proper grade and alignment, Joining with GI Specials and as directed by the TWAD Officers. |
| 22 | Refilling the Excavated trenches after laying of 63mm PVC Pipe Complete as per standard Specification |
| 23 | Supply and delivery and fixing of 1000 Liter HDPE tank as per IS 12701 / 1996 including loading, unloading, transportation and labour charges for fixing of the GI pipes and specials for pipe connection works including cutting, threading and fixing charges etc., |
| 24 | Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches for laying of pipes for water supply in the following type of soils as directed by Departmental officers b Hard stiff clay, stiff black cotton, hard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil complete etc.., |
| 25 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. |
| 26 | Plain cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mmH.B.G.metal for foundation and flooring including dewatering if 'necessary and laid inlayer of not more than 15 cm thick complying with standard specification. |
| 27 | Brick work in cement mortar 1:5 (One cement and Five sand) using country bricks of size 8 ¾\\" x 4¼\\"x2¼ \\" including cost and conveyance of allmaterials to site and all other labour charges and incidential charges etc., complete complying with standards specifications. |
| 28 | Plastering with cement mortar (1:5) 12mm ,thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications (S.I.306) |
| 29 | Supplying and filling the basement with Good Earth filling in layers of not more than 15cm thick well rammed watered and compacted - etc., complete complying with standard specification. |
| 30 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification |
| 31 | PVC INSULATED AND SHEATHED 3 CORE FLAT TYPE COPPER CABLE CONFORMING TO IS 694/1990 AND AS AMENDED THEREAFTER 4 sqmm, |
| 32 | Supply and run of 2 x 1.5 sq.mm. (22 / 0.3) PVC insulated SC unsheathed copper conductor of 1100V grade in 25mm dia GI pipe (Class 'B') suitably bent at both ends with necessary angle iron upright and end supports for mains |
| 33 | Supply and fixing of 15 A arial fuse unit on suitable MS plate with hylem sheet on thetapping pole with necessary clamps. only. |
| 34 | Wiring with 2 x 1.5 sq.mm. (22 / 0.3) PVC insulated SC unsheathed copper conductor cable of 1100V grade in suitable heavy gauge MS conduit pipe on wall and ceiling with MS accessories with switch box with 5A FT switch inflush with wall and covered with hylum sheet of 3mm thick with painting of suitable colour with continuous earth wire connection of 14 SWG TC wire for light point / fan point (for electronic regulator) |
| 35 | Supply of THREE PHASE SUBMERSIBLE PUMPSET SUITABLE FOR 100MMDIA BOREWELL of lpm against 100meter head as per ISI foot valve arrangements with 30 mm G.I.Pipe 6m with 2 M.S. Union and all accessories etc.,complete as per standard specifications. |
| 36 | Supply and delivery of THREE PHASE Panal Board DOL Two level Guard and auto start complete as per standard specifications |
| 37 | Labour charges for erection of compressor motor in borewell up to 115 M dia including fixing of suction pipe up to a maximum depth of 110 M and elivery pipes and erection of DPIC Switch Complete and testing the pumps on trial run for ten days including siging of completion reports as required by the E.B. authorities as instructed by the departmental officers. Please Enable Macros to View BoQ information |