| 1 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mmnominal size) |
| 2 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). |
| 3 | providing Tor steel reinforcement of following dia rods as per approved design and drawing exclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. TMT Fe 500 (only valid for SAIL & TATA STEEL) |
| 4 | (i) 8mm dia rods. |
| 5 | (ii) 10mm dia rods. |
| 6 | (iii) 12mm dia rods. |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for |
| 8 | (ii) Lintels, beams, plinth beams, girders, bressumers and cantilevers |
| 9 | (iii) Columns, Pillars, Piers, Abutments, Posts and Struts |
| 10 | Providing designation 75 B brick work in C.M. (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including, providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth curing, taxes and royalty all complete as per building specification and direction of E/I. |
| 11 | Providing 12mm cement plaster (1:6) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. |
| 12 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade :New work (Two or more coats applied @ 1.43 ltr/ 10 sqm overand including priming coat of exterior primer applied @ .90 litre. |
| 13 | Providing primer one coat of red lead paint of approved make over new steel surface including preparing the surface after cleaning, removing dust, dirt, scales smokes and grease and cleaning the surface thoroughly including cost of scaffolding and taxes all complete as per building specification and direction of E/I. (Mode of measurement Area shall be multiplied by the co-efficient as indicated in building specificatio). |
| 14 | Providing two coats of synthetic enamel paint of approved shade and make over steel surface including cleaning the surface thoroughly scaffolding and taxes all complete as per building specification & Direction of E/I. |
| 15 | Supplying,fitting and fixing M.S. 40X40X4mm IS2062 grade A M.S. angle, hoisting in steps, welded with 6mm dia and 75mm long M.S. rods, anchorage fixed in concrete steps at the time of casting, including taxes all complete as per direction of E/I. |
| 16 | Labour for cutting of M.S. angle iron post to required length, one end splitted as fishtailed in a length of 150mm complete as per building specification and direction of E/I. |
| 17 | Drilling 6mm dia hole M.S. angle iron for fixing of staples etc. as per building specification and direction of E/I. |
| 18 | Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 105 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron 'Y' shaped placed 2.4m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately) |
| 19 | Carriage of materials by diesel Truck including loading at source, unloading at works site and stacking properly, labour, P.O.L., etc. all complete as per direction of E/I. |
| 20 | Sand lead - 20 km |
| 21 | Stone chips lead -20 km |
| 22 | Bricks lead 8km(1k+7p) |
| 23 | Add 18 % GST (in Basic Rate must fill 12) |
| 24 | Add 1% Labour Cess (in Basic Rate must fill 1) Please Enable Macros to View BoQ information |