| 1 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 mExcavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections and transporting to the embankment location with all lifts and lead upto 1000 m as per MoRD Technical Specification Clause 302.3. |
| 2 | Land Slide Clearance in soilClearance of land slides in soil and ordinary rock by a bulldozer D 80 A-12, 180 HP and disposal of the same on the valley side as per MoRT&H technical specification Clause 3000. |
| 3 | Surface DrainsConstruction of unlined surface drains of average cross- sectional area 0.40 sqm in ordinary soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3 m and lead of 50 m (average lead 25 m) as per MoRD Technical Specification Clause 307.(i) Surface Drains in Ordinary Soil(A) Manual Means |
| 4 | Brick solingii) Flat Brick solingProviding and laying flat brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. |
| 5 | Brick solingBrick in edge solingProviding and laying brick on edge soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with sand, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. |
| 6 | Maintenance of Earthen shoulder (stripping of excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawing and MoRDtechnical specification Clause 1903. |
| 7 | Providing and placing gunny/ polythene (of minimum wall thickness of 500 micron) bags filled with sand (of minimum qty of 0.034 cum) and properly manually stitched to avoid any leakage of sand as per specification. |
| 8 | Single bamboo palasiding/walling of whole 2nd class bamboo (Jati or Bethua) 65 to 75 mm dia and closely packed & driven @ 150 mm c/c including fitting fixing with half bamboo kamis horizontally in three rows with cane or tying with wire complete and struts 1.5 m apart longitudinally and providing bitumen drum sheet walling fixed with nails as per drawing and MoRD technical specification Clause 1302.5.A) Driven at least 900 mm below ground and 1200 mm above ground on average. |
| 9 | Patch repairing/ Maintenance of bituminous surface road using Jhama brick aggregate & Viscosity Graded bitumen (VG-30)Repairing pot-holes and making up small depressions with ramming or power rolling after removal/ disposal of disintegrated materials within a lead of 50 m, cutting pot holes to regular shapes with vertical edges and levelling the bottom, cleaning the same with compressed air or any other appropriate method including screening, cleaning of aggregates; and filling up with with jhama chips using bitumen of VG-30 @ 54 kg per m3 of loose volume of jhama brick chips, after applying tack coat of bitumen on sides and bottom @ 0.75 kg/ sqm and finishing the top of repaired surface levelled with adjoining area in proper grade and camber including spreading of sand @ 0.006 cum/ sqm of prepared road surface as per direction of the Engineer-in- Charge and all as per MoRD technical specification Clauses 1900, 502, 503 and 504. |
| 10 | Water Bound Macadam Sub-Base / Base using Jhama Brick Aggragate2) WBM Grading - 3Providing, laying, spreading and compacting jhama brick aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing rolling with three wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading- 3 as per MoRD Technical Specification Clause 405.A) By Manual Means |
| 11 | Tack coat using hot straight run bitumen of grade VG-30 on W.B.M.Providing and applying tack coat using hot straight run bitumen of grade VG-30, including heating the bitumen, spraying the bitumen, cleaning and preparing the existing road surface as per specifications: On W.B.M. @ 0.75 kg/ sqm. |
| 12 | Tack coat using hot straight run bitumen of grade VG-30 on bituminous surface.Providing and applying tack coat using hot straight run bitumen of grade VG-30, including heating the bitumen, spraying the bitumen, cleaning and preparing the existing road surface as per specifications: : On bituminous surface @ 0.50 Kg/Sqm. |
| 13 | 20 mm thick Open-Graded Premix Carpet using Bituminous (Viscosity grade/ modified bitumen) BinderProviding, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using Viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base , including mixing in a suitable plant, laying and rolling with a three wheel 80 - 100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 508.Case - II : By Manual means(ii)Bitumen VG-30 |
| 14 | Seal CoatProviding and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 510.Case - IV : Type D (premix with fine sand)i) Bitumen VG-30 Please Enable Macros to View BoQ information |