| 1 | Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per MoRD Technical Specification Clause 303.5. |
| 2 | Brick solingii) Flat Brick solingProviding and laying flat brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. |
| 3 | Brick edging laid length wiseProviding and laying brick edging laid lengthwise on prepared subgrade according to lines, grades and crosssection shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. |
| 4 | Supplying and stacking mixed class brick bats (50% first class & 50% un-class) including carriage loading & unloading at the site of work complete as per direction of the Engineer-in-charge |
| 5 | Hill Side Drain ClearanceRemoval of earth from the choked hill side drain and disposing it on the valley side manually as per MoRT&H technical specification Clause 3000. |
| 6 | Surface DrainsConstruction of unlined surface drains of average crosssectional area 0.40 sqm in ordinary soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3 m and lead of 50 m (average lead 25 m) as per MoRD Technical Specification Clause 307.(i) Surface Drains in Ordinary Soil(A) Manual Means |
| 7 | Single bamboo palasiding/walling of whole 2nd class bamboo (Jati or Bethua) 65 to 75 mm dia and closely packed & driven @ 150 mm c/c including fitting fixing with half bamboo kamis horizontally in three rows with cane or tying with wire complete and struts 1.5 m apart longitudinally and providing bitumen drum sheet walling fixed with nails as per drawing and MoRD technical specification Clause 1302.5.Driven at least 900 mm below ground and 1200 mm above ground on average |
| 8 | Maintenance of Earthen shoulder (Stripping of excess soil)Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawing and MoRD technical specification Clause 1903. |
| 9 | Providing and placing gunny/ polythene (of minimum wall thickness of 500 micron) bags filled with sand (of minmum qty of 0.034 cum) and properly manually stitched to avoidany leakage of sand as per specification. |
| 10 | Construction of Embankment with Material Obtained from Borrow PitsConstruction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per MoRD Technical Specification Clause 301.5. |
| 11 | Construction of toe walls for protection of slopes as per Drawing and MoRD technical specifications Clause 1302.5(including centering, shuttering staging etc. but excluding reinforcement)Cement concrete grade M 10 (using jhama brick aggregate) in case of concrete block pitching(i) Nominal mix 1:3:6 |
| 12 | Providing and applying tack coat with bitumenemulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom asper MoRD Technical Specification Clause 503. |
| 13 | Repair to pot holes/ patch repair on all types of bituminous pavement by using All Weather Instant Patch Repair Cold Readymix Compound (INSSTAPATTCH/ SHELMAC - PR/SHALIPATCH or equivalent products accredited by IRC) within specified shelf life including cleaning the existing portion of theroad to be repaired by appropriate method, disposal of all failed material, compacting, etc. complete as per relevant technicalspecification and as per direction of the Engineer-in-charge.(irrespective of recorded premeasured area/ volume of pot holes repaired, to be measured for payment in multiple packs of 25/ 50kg net HDPE bags with inside LDPE liner actually supplied/ delivered & utilised) Please Enable Macros to View BoQ information |