|
| 1 | BOQ FOR SHIFTING OF 11 KV LINE SUBHASHGARH TO PHERUPUR ON REQ. OF EXECUTIVE ENGINEER, PWD, HARIDWAR UNDER ELECTRICITY DISTRIBUTION DIVISION, LAKSAR, HARIDWAR IN DEPOSIT HEAD AGAINST E-TENDER NO- 165/EDC(H)/2025-26 Bidder's Name & Address S.N. Work Unit Qty. Rate Amount (In Rs.) A Decentrlized Material |
| 2 | Cable Holding Clamp with N&B |
| 3 | Holding Clamp for SP-55 with N/B |
| 4 | Bracing Clamp Top SP-55 with N/B |
| 5 | Bracing Clamp Bottom SP-55 with N/B |
| 6 | Holding Clamp for PCC Pole |
| 7 | LT Clamp with N&B ST Pole SP-55 |
| 8 | PP & Clamp with N&B ST Pole SP-55 |
| 9 | Stay Clamp for SP-55 with Nut & Bolt |
| 10 | PP & Clamp with N&B ST Pole SP-33 |
| 11 | Shackle Insulator |
| 12 | Bolt & Nuts off size |
| 13 | IPC with aluminium bail for earthing |
| 14 | 11 KV IPC for Covered to Covered Conductor |
| 15 | 11 KV IPC for Covered to Bare Conductor |
| 16 | 11 KV Mid Span Jointing Kit |
| 17 | 11 KV Sus. Ties/Cable Ties on Pin Insulator |
| 18 | 11 KV AL 59 ACS Cover Conductor |
| 19 | 11 KV Tension Clamp with Bail & IPC Total (A) 0.0 B LABOUR |
| 20 | Erection of Earthing Rod |
| 21 | Fabrication of steel |
| 22 | Excavation of Pit for Stay Set |
| 23 | Erection of 11 KV Stay Set |
| 24 | Grouting of Stay Set |
| 25 | Excavation of Pit for Pole |
| 26 | Erectuion of Single PCC Pole |
| 27 | Erection of Single SP-33 Pole |
| 28 | Erection of Single SP-55 Pole |
| 29 | Grouting of Pole |
| 30 | Muffing of Pole |
| 31 | Dismantling of PCC Single Pole |
| 32 | Dismantling of PCC Double Pole |
| 33 | Dismantling of 11 KV Line (Weasel) |
| 34 | Painting of SP-33 Pole |
| 35 | Painting of SP-55 Pole |
| 36 | Making of Section Pole |
| 37 | Cartage PCC Pole, 21-50 KM |
| 38 | Cartage SP-33 Pole, 21-50 KM |
| 39 | Cartage SP-55 Pole, 21-50 KM |
| 40 | Cartage of Petty Material, 21-50 Km |
| 41 | Headload Cartage PCC Pole (0-1 KM) |
| 42 | Headload Cartage SP-33 Pole (0-1 KM) |
| 43 | Headload Cartage SP-55 Pole (0-1 KM) |
| 44 | Headload Cartage of Material (0-1 KM) |
| 45 | Dismantling of Damaged HT Bracket |
| 46 | Laying of LT XLPE ABC 3x120+1x95+1x16 Sq |
| 47 | Straightening of Tilted STP Poles |
| 48 | Straightening of Tilted PCC Poles |
| 49 | Inst. Of Danger Board/Number Plate |
| 50 | Sagging/Resagging of ACSR HT Line |
| 51 | Sagging/Resagging of ACSR/ABC LT Line |
| 52 | Fixing of MS Clampe |
| 53 | Dismantling of Section Pole |
| 54 | Fixing of IPC with AL. Bail for Earthing |
| 55 | Jumpering of D/P TPMO, Fue Set and T/F |
| 56 | Fixing of Channel, Angle on Pole |
| 57 | Fixing of 11 KV 90KN Tension Clamp B&IPC |
| 58 | Fixing of 11 KV Suspension Ties |
| 59 | Fixing of 11 KV Mid Span Jointing Kit |
| 60 | Jumper Section Pole |
| 61 | Fixing of 11 KV IPC for Covered - Covered |
| 62 | Fixing of 11 KV IPC Covered to Bare Conductor |
| 63 | Fixing of 11 KV Pin Insulator |
| 64 | Supply & Fixing of Anti Climbing Device |
| 65 | Dismantling of 11 KV AAAC Conductor |
| 66 | Laying, Sagging of Covered Cond. for 11 KV |
| 67 | Fixing of PP Clamp |
| 68 | Looping and Chopping of Tree Branches Total (B) 0.0 Total (A+B) 0.0 Note :- GST will be paid extra as actuals. Company/Firm Name Name Designation Date |