| 1 | 11/0.4 KV 630 KVA S/Stn |
| 2 | 11/0.4kV DISTRIBUTION TRANSFORMER 630kva |
| 3 | S/T POLE 9MTR.W/L200KG Provided by HPSEBL |
| 4 | RCC MUFF |
| 5 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line |
| 6 | MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LA's |
| 7 | X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] forsupporting DO fuse unit & GO switch |
| 8 | Transformer Bed, Belting & Knee Bracing |
| 9 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer bed |
| 10 | X-Arm [Channel Iron (100x50x6 mm), Length : (460 mm) x 2 Nos forsupporting Main Channel of Transformer] |
| 11 | MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos |
| 12 | MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos |
| 13 | MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed KneeBracing |
| 14 | Transformer LT Distribution Box and GO Switch fixing Assembly |
| 15 | MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos |
| 16 | MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos |
| 17 | GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length 460mm |
| 18 | GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type |
| 19 | D.O Fuse Unit |
| 20 | Surge Arrester, 9 kV Station Class (Porcelain Type) |
| 21 | Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90KN)including Dead End Clamps etc. |
| 22 | Stay set complete |
| 23 | Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) |
| 24 | Pipe Earthing Set |
| 25 | LT Panel Box for 630kva DTR (ACB 1000 Amp 3p 50KA-1 no), MCCB 400 Amp 50 KA,3nos) Provided by HPSEBL |
| 26 | CT-PT combined unit for 11 KV CT |
| 27 | VCB Trolly |
| 28 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for CT-PT bed |
| 29 | X-Arm [Channel Iron (100x50x6 mm), Length : (460 mm) x 2 Nos forsupporting Main Channel of Transformer] |
| 30 | MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed KneeBracing |
| 31 | Half Clamp (M.S. Flat 50X6 mm) |
| 32 | Full Clamps (M.S. Flat 50X6 mm) |
| 33 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16mm Φ or more (with flat and spring washers)] |
| 34 | Aluminium Thimble Provided by HPSEBL |
| 35 | Copper Thimble Provided by HPSEBL |
| 36 | Danger Plate Provided by HPSEBL |
| 37 | Barbed Wire |
| 38 | LT Cable (3.5 Core) 500 mm² |
| 39 | Energy Meter (3-Phase, 4-Wire) DLMS compliant 1000/5 A CT Type for 630KVA Transformer |
| 40 | Aluminium Paint. |
| 41 | chain link fencing along with Transformer bed & allied civil work |
| 42 | IT infrastructure for digitization of connections for billing purpose |
| 43 | Transportation Charges complete in all respect |
| 44 | Errection Charges complete in all respect |
| 45 | HT LINE |
| 46 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for double pole structure |
| 47 | 11 kV Pin Insulator with Pin Helically formed fitting |
| 48 | Disc insulator set (Cleaves and Tong) Helically formed fitting |
| 49 | Coil Earthing for PCC / Steel Pole |
| 50 | Danger Plate(250X200X1.6 mm) |
| 51 | Earth Wire 8 SWG GI Wire for PCC/ Steel Pole |
| 52 | M.S. Nuts and Bolts (Off Sizes) |
| 53 | Barbed Wire |
| 54 | Aluminium Paint |
| 55 | Full Clamp |
| 56 | Conductor ( AAAC 7/3.15mm2) (including Cutting & Sagging ) |
| 57 | Half Clamp |
| 58 | G.O switch complete |
| 59 | C.I. X-Arm 75x40x6mm 2400mm for GO Switch & DO Fuse |
| 60 | ADD TPT. CHARGES @5% |
| 61 | ERECTION CHARGES AAAC 7/3.15 complete in all respect |
| 62 | ERECTION CHARGES EARTHING complete in all respect |
| 63 | ERECTION CHARGES G.I WIRE complete in all respect |
| 64 | LT Line |
| 65 | LT XLPE CABLE 3.5 core 120 MMSQ |
| 66 | LT Cable jointing KIT |
| 67 | RCC Humne Pipe 150mm X 2m |
| 68 | Collar for RCC Humne Pipe 150mm |
| 69 | G.I Pipe Earthing 40 X 2.5/3m B class |
| 70 | Cleat HDPE for cable support |
| 71 | LT Distribution box |
| 72 | Pipe HDPE |
| 73 | Transportation Charges complete in all respect |
| 74 | Erection Charges complete in all respect |
| 75 | Civil work underground cable |
| 76 | Dismentelled charges conductor complete in all respect Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart.Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site. Please Enable Macros to View BoQ information |