| 1 | Excavation in foundation and trenches in earth work upto all depth in all kinds of soil such as pick work jumper work,blasting work.chiselling of soft /hard rock where blasting is prohibited in all leads and lifts and including trimming of sides levelling of bed to correct grade stacking the excavated soil in 15cm layers when required into plinth sides of foundation including consolidating each deposited layer by ramming and watering and then disposing oof all surplus excavated soil as directed in all leads and lifts and soring/strutting timbering and dewatering where ever required to the entire satisfaction of the Engineer-in-charge. |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement 3 coarse sand): 6 graded stone aggregate 40 mm nominal size) in all leads and lifts |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form for all heights Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.in all leads and lifts. |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for all heights Suspended floors, roofs, landings, balconies and access platform in all leads and lifts |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, huttering, finishing and reinforcement 1:1.5:3 (1 cement 1.5 coarse sand) 3 graded stone aggregate 20 mm in all leads and lifts. |
| 6 | Reinforced cement concrete work in beams suspended floors, roofs having slope up to 15º landings, balconies, shelves, chajjas, lintels bands, plain window sills, staircases and spir stair cases above plinth level up to floor five leve excluding the cost of entering, shuttering, finishi and reinforcement, with 1:1.5:3 (1 cement : coarse sand): 3 graded stone aggregate 20 mm nominal size) in all leads and lifts. |
| 7 | Steel reinforcement for R.C.C. work includ straightening, cutting, bending, placing in posi and binding all complete upto plinth level. steel and Medium Tensile steel bars in all leads and lifts. |
| 8 | Boulder filling dry hand packed tightly under floor in all leads and lifts as per entire satisfaction of Engineer-in-Charge. |
| 9 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 Itr/10 sqm over an under coat of primer applied @ 0.80 Itr/10 sqm of approved brand and manufacture complete in all respect. |
| 10 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works complete as per direction of the Engineer-in-charge in all leads and lifts. |
| 11 | Removal/Clearance of all kind of silt from sump well upto all depths in all kind of classification of soil such as pick work, jumper work, saturated soil including bailing and pumping out water with in all leads and lifts and as per the direction and entire satisfaction of the Engineer-in-Charge. Please Enable Macros to View BoQ information Terms and conditions |
| 12 | The work should be executed as per PWD/JSV specifications and to the entire satisfactions of the Engineer-in Charge. |
| 13 | The cement & steel shall be issued by the department from JSV Divisional Store Raghunath Ka Padhar Mandi cement @ 368/- per bag, Steel Rs.7615/-only per qtl. |
| 14 | The Contractor will be fully responsible for watch and ward of material at site of work. |
| 15 | Nothing shall be paid for rejected/sub-standard material at site of works. |
| 16 | Concrete work shall be done by using vibrator and concrete mixing plant. |
| 17 | Crushed aggregate will be used in concrete work. |
| 18 | Material should be used of approved quarry. |
| 19 | The work should be completed in the stipulated period. |
| 20 | The rates should be inclusive with GST and carriage |
| 21 | 1% labour cess will be deducted from the bill of the contractor. |
| 22 | GST as applicable will be borne by the contractor. |
| 23 | No deviation will be allowed without the prior permission of the Engineer-in-charge. |