|
| 1 | Dismentalling of head assembly and re-jointing complete in all respect |
| 2 | Extracting of riser pipe including dismentalling complete of following dia with in all. Leads and lifts |
| 3 | 32 mm dia |
| 4 | 65 mm dia |
| 5 | Lowering of riser pipe including fitting complete following dia with in all leads and lifts |
| 6 | 32 mm dia |
| 7 | 65 mm dia |
| 8 | Extracting of connecting rods 12mm dia complete in all respect. |
| 9 | Lowering of connecting rod 12mm dia complete in all respect. |
| 10 | Cutting/threading of riser pipe of following dia complete in all respect |
| 11 | 32 mm dia |
| 12 | 65 mm dia |
| 13 | Cutting/threading of connecting rods 12mm dia complete in all respect . |
| 14 | Transportation of material one site to another site of work complete in all respect as per direction of Engineer-in-Charge |
| 15 | Providing and fixing connecting rods 12mm x3mm dia electrogalvanised complete in respect |
| 16 | Providing and fixing seemless sockets of following dia complete in all respect |
| 17 | 32 mm dia |
| 18 | 65 mm dia |
| 19 | Providing and fixing of lower valve complete India Mark- M-III & M-II complete in all respect |
| 20 | Providing and fixing cylinder assembly India Mark III & II complete in all respect. |
| 21 | Providing and fixing chain with coupling complete in all respect. |
| 22 | Providing and fixing SS Handle Axle complete in all respect. |
| 23 | Providing and fixing of Hexagonal bolt 10x40 complete in all respect . |
| 24 | Providing and fixing ball bearing 6204 complete in all respect. |
| 25 | Providing and fixing Handpump rubber cup washer complete in all respect. |
| 26 | Providing and fixing body with liner complete in all respect. |
| 27 | Providing and fixing GMS tube light class of following diameter including tube fitting , testing of joints complete in all respect as per direction of Engineer-in-Charge. |
| 28 | 32 mm dia |
| 29 | 65 mm dia |
| 30 | Opening and Re- assembled after flushing/Re-development of 10\\" borewell and yield testing with air compressor through V-notch and disinfection etc complete at Dhanotuwala tube well duration 10 hours complete in all respect as per relevant IS code for developing potable water under all leads and lifts as per direction of Engineer-in-Charge. |
| 31 | Flushing/Re-development of bore well/ Handpump and yield testing with air compressor through V-notch and disinfection etc. complete in all respect as per relevant IS code for developing potable water complete assembly complete in all respect |
| 32 | Transportation of Truck mounted rig/ air compressor with assembly complete in all respect as per direction of Engineer-in-Charge. Please Enable Macros to View BoQ information |