| 1 | Providing and supplying in standard lengths Polyethelene Pipes, confirming to IS 4984 /14151 / 12786 / 13488 with nesessary jointing material like mechanical connector i. e. thread / insert joint / quick release coupler joint / |
| 2 | 5% of cost of pipes shall be considered for cost of PVC/HDPE specials for estimate purpose only. |
| 3 | aProviding double flange sluice valve confirming for IS- 14846 including worn gear arrangements as per test pressure, stainless steel spindle, caps, including inspection charges, transportation upto departmental store, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. complete |
| 4 | Providing & supplying ISI mark CI D/F reflux valve (Non- return valve) of following dia including all taxes (central and local ), railway freight, inspection charges unloading from railway wagon, loading into truck, transportation upto department stores/site, unloading, stacking etc. complete. reflux valves as per I.S.5312 part I (1984) |
| 5 | Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling, by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the |
| 6 | Lowering, Laying and Jointing H. D. P. E./ M. D. P. E. pipes in proper position including all specials by compression fitting/electrofusion and butt fusion jointing procedure as per relevent IS Code complete with all materials for jointing procedure like Electrofusion machine, Electric heater/butt fusion welding machine with hydraulic jack, top loading clamp etc. and all labours as directed by engineer in charge as per IS-7634 Part II |
| 7 | Lowering laying and jointing in position following C.I.D/F Reflux valves Butterfly valves and sluice valves including cost of all labour joining material, including nut bolts and giving satisfactory hydraulic testing etc. complete. (Rate |
| 8 | Lowering laying and jointing in position following C.I.D/F Reflux valves Butterfly valves and sluice valves including cost of all labour joining material, including not bolts and giving satisfactory hydraulic testing etc. complete. (Rate |
| 9 | Providing and fixing in position air valve shaft including providing and fixing GI Medium Class or 6 mm thick M.S. pipe shaft 2.70 M long over branch flange of air valve tee, providing PCC block of M-150 concrete 150 mm thick around the air valve tee including encasing of vertical shaft in PCC M-150 as shown in type design together with providing and making flanged joints wherever required and fixing of air valve over the shaft excluding cost of air valve and branch flanged air valve tee. etc. complete as per type design and as directed by Engineer-in-charge for following diameters of pipe lines (type design attached.) |
| 10 | Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, including excavation, B.B. masonry in C.M. 1:5 proportion 12 mm thick cement plaster in cm 1:4 proportion on both sides with providing and fixing C.I. manhole frame and cover in RCC 1:2:4 coping or cm thick slab etc. complete as directed by Engineer-in-charge. |
| 11 | Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete |
| 12 | Hydraulic testing of H. D. P. E./ M. D. P. E. pipe line to specified pressure including cost of all materials and labour and water for testing for specified length including cutting, placing end cap making arrangement for filling safe water using reciprocating type pumps which should be able to provide specified test pressure gauges and other necessary equipments, labour, operation charges, etc. required for testing. The rate under this item shall also include cost of retesting, if necessary and reinstating to original position. |
| 13 | Designing (aesthetically), and constructing RCC elevated service reservoirs of following capacity with RCC staging consisting of columns, internal and external bracings spaced vertically not more than 4.5 metres centre to centre for ESR having capacity upto 500 cum and not more than 6 m c/c for ESRs having capacity above 500 Cum including excavation in all types of strata, foundation concrete, cement plaster with water proofing compound to the inside face of the container including refilling disposing off the surplus stuff within a lead of 50 metres, all labour and material charges including lowering, laying, erecting, hoisting and jointing of pipe assembly of inlet, outlet, washout, overflow and bypass arrangements as per departmental design, providing and fixing accessories such as M.S. ladder, C.I. manhole frame and covers, water level indicators, lightening conductor, G.I. pipe railing around walk way and top slab, providing spiral stair case from ground level to roof level, M.S. grill gate of 2 M height with locking arrangement of approved design, B.B. masonry chambers for all valves, ventilating shafts, providing and applying three coats of cement paint to the structure including roof slab, epoxy painting to internal surface and anti- termite treatment for underground parts of the structure and giving satisfactory water tightness test as per I.S. code. The job to include painting the name of the scheme and other details on the reservoir as per the directions of Engineer-in-Charge. |
| 14 | Providing D.I.pipes (push on joints pressure pipes of D.I. of following class and diameters confirming to the I.S. specification inclusive cost of jointing materials (Rubber gasket of EPDM Quality) excluding GST levied by GOI & GOM in all respect includingThird party inspection charges of TPI Agency approved by MJP includingTransitinsurance, Railway Freight,Unloading from railway wagon, Loading into Truck, Transportation to departmental store, unloading,stacking etc.completed as directed by Engineer incharges (IS8329/2000 for pipes and IS 158/1969 and IS12820/1989 or latest edition / revision with amendments for Rubber Gaskets. |
| 15 | Providing and supplying double flange sluice valves confirming for IS 2906/14846 including warn gear arrangement as per test pressure stainless steel spindle caps excluding GST levied by Gol and GoM in all respect , transportation etc complete. |
| 16 | Providing and supplying in standard lengths Polyethelene Pipes, confirming to IS 4984 / 14151 / 12786 / 13488 with nesessary jointing material like mechanical connector i.e. thread / insert joint / quick release coupler joint / compression fitting joint or flanged joint excluding coupler/specials, including transportation and freight charges, inspection charges, loading / unloading charges, conveyance to the departmental stores & stacking the same in closed shade duly protecting from sunrays & rains, excluding GST levied by GI & GOM in all respect etc. complete. |
| 17 | 63 mm Dia HDPE Pipe 6 Kg/sqcm |
| 18 | 75 mm Dia HDPE Pipe 6 Kg/sqcm |
| 19 | 90 mm Dia HDPE Pipe 6 Kg/sqcm |
| 20 | 90 mm Dia HDPE Pipe 6 Kg/sqcm |
| 21 | 5% of cost of pipes shall be considered for cost of PVC/HDPE specials for estimate purpose only. |
| 22 | Providing double flange sluice valve confirming for IS- 14846 including worn gear arrangements as per test pressure, stainless steel spindle, caps, including inspection charges, transportation upto departmental store, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. complete |
| 23 | Sluice valves 100 mm Dia |
| 24 | Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-1/259) |
| 25 | Excavation for foundation / pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (BdA-3/259) |
| 26 | Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking as directed by Engineer-incharge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-4/259) |
| 27 | Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling, by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc.complete by all means.complete Lift 0 to 1.5 M |
| 28 | Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction, etc. complete. (Bd-A-10/263) |
| 29 | Lowering, Laying and Jointing H. D. P. E./M.D. P. E. pipes in proper position including all specials by compression fitting/electrofusion and butt fusion jointing procedure as per relevent IS Code complete with all materials for jointing procedure like Electrofusion machine, Electric heater/butt fusion welding machine with hydraulic jack, top loading clamp etc. and all labours as directed by engineer in charge as per IS-7634 Part II |
| 30 | 63 mm Dia HDPE Pipe 6 Kg/sqcm |
| 31 | 75 mm Dia HDPE Pipe 6 Kg/sqcm |
| 32 | 90 mm Dia HDPE Pipe 6 Kg/sqcm |
| 33 | 90 mm Dia HDPE Pipe 6 Kg/sqcm |
| 34 | Lowering, laying and jointing in position following C.I.D/F Reflex valves, Butterfly valves and Sluice valves including cost of all labour jointing material, including nut bolts and giving satisfactory hydraulic testing etc. complete. (Rate for all class of valves.) |
| 35 | Sluice valves 100 mm Dia |
| 36 | Providing and laying in situ Cement Concrete of trap/ granite / quartzite /gneiss metal for RCC work in foundation like raft, grillage, strip foundation and footing of RCC columns and steel stanchions including normal |
| 37 | Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, excluding excavation, B.B. masonry in CM 1:5 proportion precast RCC frame and cover, etc. complete as directed by |
| 38 | Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete |
| 39 | Providing and making HDPE/PVC pipe consumer service connection on distribution main by drilling holes with suitable means, including all labour. HDPE/PVC pipe of required length with or without road crossing |
| 40 | Hydraulic testing of H. D. P. E./ M. D. P. E. pipe line to specified pressure including cost of all materials and labour and water for testing for specified length including cutting, placing end cap making arrangement for filling safe |
| 41 | 75 MM DIA HDPE PIPE 6 KG/SQCM |
| 42 | 90 MM DIA HDPE PIPE 6 KG/SQCM |
| 43 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20 m x 0.90 m size made out 18 gauge (1.25 mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border /messages /symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x35 x3 mm frame with properly cross braced M.S.angles of size 35 mm x 35 mm x 3 mm duly painted including Two M.S.angle iron posts of size 65 mmx 65 mmx 6 mm, 3.65 m long painted withal ternate black and white bands of 25 cm width including all fixtures etc. and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete.Spec. Number As directed by Engineer in Charge MORTH 801 |
| 44 | Commissioning, running and maintaining the scheme to quantities, rated capacity, including manning necessary personnel such as operator, valveman, etc. as per requirements of the scheme and who should also administer chemical dose for a period of 1 month for individual scheme and for regional scheme, together with training of personnel spared by MJP / Local Body and handing over the scheme to Local Body after completion of the above period as directed by Engineer-in-charge. |
| 45 | Add 18% GST Please Enable Macros to View BoQ information |