| 1 | Supply, Fabrication of D.P. Structure with RS joint with size of 250X125 and MS Channel, Angles including staightering of RSJ pole and MS channel painting of one cost primer Redoxide paint and two cpats of Aluminium paint |
| 2 | Earthwork excavation in hard stiff clay, black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil inlcuding all cost of lead lift etc complete. |
| 3 | PCC1:2:4 using 20mm metal for foundation tower concrete without form work including cost of all materials, lead, lift, etc complete . |
| 4 | PCC 1:2:4 using 20mm metal for muffing coping concrete with form work including cost of all materials, labour, lead, lift, etc complete . |
| 5 | Supply & Providing earthing as per approved specification and as directed by the site engineer including necessary excavation for fixing 3m long 25mm dia GI \\"B\\" class pipe and refilling with excavated earth and connect the earthstrip with the leg of the stub including all cost of materials, lead, lift etc complete. |
| 6 | Fabrication and erection of D.P. Structure with RS joint with size of 250X125 and MS Channel, Angles including staightering of RSJ pole and MS channel and and cutting the required length drilling holes and D,P bolts and nuts as per the Std design and dwawing etc., including loading, unloading and transport and painting of one cost primer Redoxide paint and two cpats of Aluminium paints as per the direction of the Engineer incharge of the work including cost of all T&P transport, labour, lead lift etc., complete. |
| 7 | Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials,labour,lead,lift etc complete |
| 8 | Labour charges for hoisting of 5 units of 90 KN single suspension Disc insulators with necessary hardware fittings for panther and U bolt including all cost of labour,lead, lift, T & P etc complete.. |
| 9 | Releasing and lowering of existing 3 nos Racoon conductor and restringing the conductor with required sag into the newly erected tower including all labour lead, lift T & P etc complete |
| 10 | Releasing and lowering of existing 1 no Earth wire and restringing the conductor with required sag into the newly erected tower including all labour lead, lift T & P etc complete. |
| 11 | Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead ,lift etc complete. |
| 12 | Providing temporary guys wherever necessary including excavation, burying out of anchor for staywire, tightening, dismantling the same after completion of works including cost of all materials,lead,lift,labour etc complete.. |
| 13 | Providing trussels for major and minor road crossing including cost of all materials, labour, lead lift etc. Complete. |
| 14 | Labour charges for Dismantling the existing of 4 units of single Tension Disc insulators & devoluted to departmental store including all cost of labour,lead, lift, T & P etc complete. |
| 15 | Labour charges for Dismantling the existing of 5 units of single Tension Disc insulators & devoluted to departmental store including all cost of labour,lead, lift, T & P etc complete. |
| 16 | Releasing and lowering of existing3 nos Racoon conductor and devoluted to departmental store including all labour lead, lift T & P etc complete |
| 17 | Releasing and lowering of existing 1 no Earth wire and devoluted to store including all labour lead, lift T & P etc complete. |
| 18 | Dismantling of MS tower parts at site and including transport and devoluted to and devlouted to Trichy GCC stores including all labour lead, lift T & P etc complete |
| 19 | Applicable GST 18% Please Enable Macros to View BoQ information |