|
| 1 | Geo Phyesical Survey Cherge for Field Survey |
| 2 | Drilling and Errection of 150 mm dia bore well Sedimentary Rock Using Rotary Rig up to 0-60m Depth From G L |
| 3 | From 60m to 90mBellow G L |
| 4 | From 90m to 120mBellow G L |
| 5 | From 120m to 150m Bellow G L |
| 6 | From 150m to 180 m Bellow G L |
| 7 | From 180m to 210 m Bellow G L |
| 8 | From 210 m upto 240m Bellow G L |
| 9 | From 240 m upto 260m Bellow G L |
| 10 | Reaming Cherge Use Reverse Rottary rig150mm -300mm up to 0-60m Depth From G L |
| 11 | From 60m to 90mBellow G L |
| 12 | From 90m to 120mBellow G L |
| 13 | From 120m to 150m Bellow G L |
| 14 | From 150m to 180 m Bellow G L |
| 15 | From 180m to 210 m Bellow G L |
| 16 | From 210 m upto 240m Bellow G L |
| 17 | From 240 m upto 260m Bellow G L |
| 18 | Reaming 300 mm dia pilot bore to 400mm/ 450mm dia bore as directed by the TWAD Board Officer. Upto 60 m depth ending below ground level |
| 19 | From 60 m depth and upto 90 m depth ending below ground level |
| 20 | From 90 m upto 120 m depth ending below ground level |
| 21 | From 120 m upto 150 m depth ending below ground level |
| 22 | From 150 m upto 180 m depth ending below ground level |
| 23 | From 180 m upto 210 m depth ending below ground level |
| 24 | From 210 m upto 240m Bellow G L |
| 25 | From 240 m upto 260m Bellow G L |
| 26 | Electrical Logging Arrangement |
| 27 | Supply of 200mm OD CM P V C Pipe of 6ksc For Plain Medium D W Casing Pipe |
| 28 | Supply of 200mm OD CM P V C Pipe of 6ksc For Slotted Medium Casing Pipe |
| 29 | Supply of 200 mm OD P V C Pipe Bottam Dummy of 6ksc (End Cap) |
| 30 | Supply of 200 mm OD P V C Pipe Top Cover of 6ksc (Coupler) |
| 31 | Labour Charge for errection pipe P V C Pipe of 6ksc |
| 32 | Charge for Developing the Bore Well use 600cfm Air Compressor |
| 33 | Towards Cost of Water Sampling |
| 34 | Supply Delivery and Erection of the 15.0 HP Submersible Pump |
| 35 | Supply Delivery and ErectionPannel Board DOL Starter 15.00HP |
| 36 | 18mm Main Wireing Board |
| 37 | Earth pipe |
| 38 | 4Sq mm Flat Sub Cable |
| 39 | Wooden Board 2x4 |
| 40 | Labour Charge for errection Submersible Pump Set and Accessories |
| 41 | 50mm M S Clamp Set |
| 42 | Supply and Delivery 50mm HDPE Pipe |
| 43 | Supply and Delivery 50mm Non Return Valve |
| 44 | Supply and Delivery 50mm Elbow |
| 45 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |