| 1 | Dismantling existing RCC in Drain includung all the labour charges for dismantling by manual/by using deploying machineries and clearing debris from work site etc complete |
| 2 | Dismantling existing PCC in Drain includung all the labour charges for dismantling by manual/by using deploying machineries and clearing debris from work site etc complete |
| 3 | Sand and silt under water (SS-20B)Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in slush and silt under water up to 0.75m depth requring the aid of basket and vessels (SS 20B)as per Rates of works C.Earth work |
| 4 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum |
| 5 | Supplying and filling in foundation and basement with Crushed Stone Dust including all the cost and conveyance of materials to work site and including all labour charges for filling in layers not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. |
| 6 | Plain Cement Concrete 1:5:10 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification |
| 7 | Centering charges for Reinfiorced cement concrete works including all the hire and labour chrages form works and including removal of all the labour charges for removal of form works etc complete asper standard specification |
| 8 | Suppling and fabricating and placing in position MS (or) R.T.S bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. |
| 9 | Plain Cement Concrete 1:2:4 (One part of Cement, Two part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials from an approved quarry to site and including for the mixing, laying and labour charges etc., complete as per standard specification |
| 10 | Providing and laying in position Standardised concrete Mix M25 Grade in accordance with is 456-2000 USING 20 MM and down graded hard broken granite stone jelly fo rall RCC items of works with minimum cement content of 350kg/cum and maximum water cement |
| 11 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. Please Enable Macros to View BoQ information |