| Sl. No. | Item Description |
| 1 | 1.Construction of Cermony shed at Sripathanallur in Veppalai Panchayat at Katpadi Block |
| 2 | Earthwork excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete SS20B |
| 3 | Supply and filling with carted river sand including cost and conveyance etc complete |
| 4 | C.C 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all etc Complete |
| 5 | Brick work in CM1:5 using ground moulded country bricks including cost and conveyance of all materials etc complete |
| 6 | R.C.C 1:1.5:3mix using 20mm ISS HBG metal including cost and conveyance of all etc.. Complete |
| 7 | Supply and fabrication of mild steel and tor steel including cost and conveyance,labour charges etc,complete |
| 8 | Supply and erection of centering for RCC works etc complete |
| 9 | Supply and erection of centering for RCC works etc complete |
| 10 | Plastering with CM 1:5 12mm thick including cost and conveyance labour charges etc complete |
| 11 | Plastering with CM 1:3 10mm thick including cost and conveyance labour charges etc,complete |
| 12 | Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) |
| 13 | Weathering course Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete for etc complete.. |
| 14 | Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm for etc complete |
| 15 | Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 16 | Painting two coats with Distmber over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 17 | Towards Name board Charges |
| 18 | 2.Construction of Cermony shed at R G Mullai Nagar in Senur Panchayat at Katpadi Block |
| 19 | Earthwork excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete SS20B |
| 20 | Supply and filling with carted river sand including cost and conveyance etc complete |
| 21 | C.C 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all etc Complete |
| 22 | Brick work in CM1:5 using ground moulded country bricks including cost and conveyance of all materials etc complete |
| 23 | R.C.C 1:1.5:3mix using 20mm ISS HBG metal including cost and conveyance of all etc.. Complete |
| 24 | Supply and fabrication of mild steel and tor steel including cost and conveyance,labour charges etc,complete |
| 25 | Supply and erection of centering for RCC works etc complete |
| 26 | Supply and erection of centering for RCC works etc complete |
| 27 | Plastering with CM 1:5 12mm thick including cost and conveyance labour charges etc complete |
| 28 | Plastering with CM 1:3 10mm thick including cost and conveyance labour charges etc,complete |
| 29 | Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) |
| 30 | Weathering course Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete for etc complete.. |
| 31 | Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm for etc complete |
| 32 | Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 33 | Painting two coats with Distmber over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 34 | Towards Name board Charges |
| 35 | 3.Construction of Cermony shed at Sorakalpettai in Vandrathangal Panchayat at Katpadi Block |
| 36 | Earthwork excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete SS20B |
| 37 | Supply and filling with carted river sand including cost and conveyance etc complete |
| 38 | C.C 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all etc Complete |
| 39 | Brick work in CM1:5 using ground moulded country bricks including cost and conveyance of all materials etc complete |
| 40 | R.C.C 1:1.5:3mix using 20mm ISS HBG metal including cost and conveyance of all etc.. Complete |
| 41 | Supply and fabrication of mild steel and tor steel including cost and conveyance,labour charges etc,complete |
| 42 | Supply and erection of centering for RCC works etc complete |
| 43 | Supply and erection of centering for RCC works etc complete |
| 44 | Plastering with CM 1:5 12mm thick including cost and conveyance labour charges etc complete |
| 45 | Plastering with CM 1:3 10mm thick including cost and conveyance labour charges etc,complete |
| 46 | Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) |
| 47 | Weathering course Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete for etc complete.. |
| 48 | Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm for etc complete |
| 49 | Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 50 | Painting two coats with Distmber over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 51 | Towards Name board Charges |
| 52 | 4.Construction of Cermony shed at Oddanthangal in Kandipedu Panchayat at Katpadi Block |
| 53 | Earthwork excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete SS20B |
| 54 | Supply and filling with carted river sand including cost and conveyance etc complete |
| 55 | C.C 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all etc Complete |
| 56 | Brick work in CM1:5 using ground moulded country bricks including cost and conveyance of all materials etc complete |
| 57 | R.C.C 1:1.5:3mix using 20mm ISS HBG metal including cost and conveyance of all etc.. Complete |
| 58 | Supply and fabrication of mild steel and tor steel including cost and conveyance,labour charges etc,complete |
| 59 | Supply and erection of centering for RCC works etc complete |
| 60 | Supply and erection of centering for RCC works etc complete |
| 61 | Plastering with CM 1:5 12mm thick including cost and conveyance labour charges etc complete |
| 62 | Plastering with CM 1:3 10mm thick including cost and conveyance labour charges etc,complete |
| 63 | Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) |
| 64 | Weathering course Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete for etc complete.. |
| 65 | Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm for etc complete |
| 66 | Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 67 | Painting two coats with Distmber over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 68 | Towards Name board Charges |
| 69 | 5.Construction of Cermony shed at Chakkarakuttai in Karigiri Panchayat at Katpadi Block |
| 70 | Earthwork excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete SS20B |
| 71 | Supply and filling with carted river sand including cost and conveyance etc complete |
| 72 | C.C 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all etc Complete |
| 73 | Brick work in CM1:5 using ground moulded country bricks including cost and conveyance of all materials etc complete |
| 74 | R.C.C 1:1.5:3mix using 20mm ISS HBG metal including cost and conveyance of all etc.. Complete |
| 75 | Supply and fabrication of mild steel and tor steel including cost and conveyance,labour charges etc,complete |
| 76 | Supply and erection of centering for RCC works etc complete |
| 77 | Supply and erection of centering for RCC works etc complete |
| 78 | Plastering with CM 1:5 12mm thick including cost and conveyance labour charges etc complete |
| 79 | Plastering with CM 1:3 10mm thick including cost and conveyance labour charges etc,complete |
| 80 | Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) |
| 81 | Weathering course Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete for etc complete.. |
| 82 | Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm for etc complete |
| 83 | Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 84 | Painting two coats with Distmber over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 85 | Towards Name board Charges |
| 86 | 6.Construction of Cermony shed at Vadukankuttai in Jaffrapet Panchayat at Katpadi Block |
| 87 | Earthwork excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete SS20B |
| 88 | Supply and filling with carted river sand including cost and conveyance etc complete |
| 89 | C.C 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all etc Complete |
| 90 | Brick work in CM1:5 using ground moulded country bricks including cost and conveyance of all materials etc complete |
| 91 | R.C.C 1:1.5:3mix using 20mm ISS HBG metal including cost and conveyance of all etc.. Complete |
| 92 | Supply and fabrication of mild steel and tor steel including cost and conveyance,labour charges etc,complete |
| 93 | Supply and erection of centering for RCC works etc complete |
| 94 | Supply and erection of centering for RCC works etc complete |
| 95 | Plastering with CM 1:5 12mm thick including cost and conveyance labour charges etc complete |
| 96 | Plastering with CM 1:3 10mm thick including cost and conveyance labour charges etc,complete |
| 97 | Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) |
| 98 | Weathering course Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete for etc complete.. |
| 99 | Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm for etc complete |
| 100 | Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 101 | Painting two coats with Distmber over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 102 | Towards Name board Charges |
| 103 | 7.Construction of Cermony shed at SN Pudur in Sembrayanellore Panchayat at Katpadi Block |
| 104 | Earthwork excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete SS20B |
| 105 | Supply and filling with carted river sand including cost and conveyance etc complete |
| 106 | C.C 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all etc Complete |
| 107 | Brick work in CM1:5 using ground moulded country bricks including cost and conveyance of all materials etc complete |
| 108 | R.C.C 1:1.5:3mix using 20mm ISS HBG metal including cost and conveyance of all etc.. Complete |
| 109 | Supply and fabrication of mild steel and tor steel including cost and conveyance,labour charges etc,complete |
| 110 | Supply and erection of centering for RCC works etc complete |
| 111 | Supply and erection of centering for RCC works etc complete |
| 112 | Plastering with CM 1:5 12mm thick including cost and conveyance labour charges etc complete |
| 113 | Plastering with CM 1:3 10mm thick including cost and conveyance labour charges etc,complete |
| 114 | Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) |
| 115 | Weathering course Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete for etc complete.. |
| 116 | Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm for etc complete |
| 117 | Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 118 | Painting two coats with Distmber over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 119 | Towards Name board Charges |
| 120 | 8.Construction of Infiltration River Well and Errection of New Motor,Panleboard,Cable Wire accessories & Pumpingmain at Kottanatham in Melpadi Panchayat of Katpadi Block |
| 121 | Earthwork Open Well Excavation Complying eith relevant Clauses of TNDSS well Sinking and with Lead upto 10Mtrs in Sand,Silt or other Loose soil,Wet Sand or Silt not Under Water,Light Black Cotton Soil,Sandy loam and ordinary Soil, First deoth 2 Mtrs Including all Cost and Covenyance for etc Complete |
| 122 | Reinforced Cement Concrete 1:1 1/2:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges, centering and shuttering but icluding curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls, sides and bottom of the slabs, beams, etc., shall be finished smooth with cement mortar 1:3, 12mm thick and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. |
| 123 | Sinking of Infiltration well of 3.50m Internal dia and 4.50m external dia below water level including all incidental charges in light (or) sandy soil for etc complete |
| 124 | First depth of 2.0m |
| 125 | Second depth of 2.0m |
| 126 | Third depth of 2.0m |
| 127 | Fourth depth of 2.0m |
| 128 | Fifith depth of 2.0m |
| 129 | Porous Concrete in CC 1:4 mix to using 20mm Metal including cost and conveyance of all materials to site and all labour charges etc complete |
| 130 | Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers Lintels, Staircase waist slabs, Landing slabs, Landing beam, Portico beam etc.) |
| 131 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications. |
| 132 | Supplying and Fabricating and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete complying with standard specification. |
| 133 | Plastering with cement mortar 1:4 mix to 20 mm thick for R.C.C. Items including cost and conveyance of all materials to site and all labour charges etc complete |
| 134 | Plastering with cement mortar 1:5 mix to 12 mm thick for R.C.C. Items including cost and conveyance of all materials to site and all labour charges etc complete |
| 135 | Supply delivery and Fixing in Position 50mm thick Manhole Cover of Size 0.60mx0.60m with necessary reniforced and MS Angle of size 50mmx50mmx6mm thick fixed alround the edges of the Slab complte TWAD Schedule of Rate Sl No-192 |
| 136 | Supply delivery and Fixing of CI Brackets Steps in Postion at 30cm Center to center in staggered mannaer and as directed by the TWAD Board officers. TWAD Schedule of Rate Sl No-184 |
| 137 | Providing Ventilating arragement by fixing in Position 160mm OD PVC 6ksc Pipe with PVC Cowl and as Directed by the TWAD Board Officers TWAD Schedule of Rate Sl No-14c |
| 138 | Providing Confirmatory bores to ascertain sand depth and Locating well site before Commencing the work fo etc complete |
| 139 | Providning for Cutting edge using 22KG MS Sheets including the cost of Fabrication welding and Plaching in Position in the in the zCrub including supply of the MS Sheet for etc completeTWAD Schedule of Rate38,Sl No-44 |
| 140 | Colour washing the Outside of well Plasterd Surface and Sides of Roof Slab for etc complete |
| 141 | Plugging the Bottom of the Well With Coarse Sand of Approved sizes and Grade as directed by the TWAD Board officers for etc complete |
| 142 | Plugging the Bottom of the Well With Coarse Sand of Approved sizes and Grade as directed by the TWAD Board officers for etc complete |
| 143 | Construction of Pumproom |
| 144 | Earthwork excavation and depositing on bank with initial lift of 2.00m in hard stiff clay, Stiff Black cotton soil, hard red earth, shales, Murram etc., as per SS 20 B |
| 145 | CC 1:4:8 using 40mm HBS jelly for foundation |
| 146 | Earthfilling in basement with excavated earth including ramming & consolidation etc., complete |
| 147 | Sand filling with river sand including watering etc., complete |
| 148 | Brickwork in CM 1:6 using best country bricks of size 8 3/4\\" x4 1/4\\" x2\\" |
| 149 | For foundation and basement and steps |
| 150 | For super structure |
| 151 | RCC 1:1:5:3 using 20mm HBS including curing etc., complete |
| 152 | Centering charges for lintel and roof slab including strutting |
| 153 | Plastering the brick work with CM 1:5 - 12mm thick including curing etc., complete |
| 154 | Ceiling plastering in CM 1:3, 10mm thick including curing etc., complete |
| 155 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm for etc Complete |
| 156 | Supply and fixing of MS door of sizes 1.00 x 2.00m(Single leaf) in MS angle 50mmx 50mm x6mm, and MS flat 35mmx 35mm x6mm with MS sheet of 18 gauge including ventilating arrangements using 20mm square MS rods with locking arrangement using 20mm square MS |
| 157 | Supply fabrication and fixing in position of RTS rods including cost of steel and binding wire etc., complete |
| 158 | Supply anf fixing of RCC post box type jolly of size 0.60mx0.45m |
| 159 | Painting two coats using ready mixed Plastic Emulsion paint inlcuding priming coat for etc Complete |
| 160 | White washing two coast for ceilling area |
| 161 | Weathering course with brick jelly lime concrete using 20mm brick jelly with etc., complete |
| 162 | Finshed with one course of pressed tiles of size 23x23x2cm with cement etc., complete |
| 163 | Provision of lack and key for pump room and OHT ladder |
| 164 | 50mm GI Pipe Bclass |
| 165 | 50mm GI Coupling |
| 166 | 50mm GI Gate Valve |
| 167 | 50mm Non Retrun Valve |
| 168 | 50mm GI Elbow |
| 169 | Three Phase Submersible Openwell Motor 600LPMx40Mtr Head 7.5HP |
| 170 | 7.5HP Panel Board |
| 171 | 25Sqm 3.50Core Cable Wire |
| 172 | Cost and Supply of 90mm PVC Pipe 6Ksc (Finolex) as per ISI for etc Complete |
| 173 | Earthwork Excavation and depositing of all soil for etc Complete ( x 0.60m x 1.05m) |
| 174 | Laying and Jointing of Pvc Pipes and specials in to trench including for etc complete TWAD SOR (11b-i) |
| 175 | Refilling the trench with excavated earth Complying for etc Complete ( x 0.60m x 1.05m) |
| 176 | Providing Namebaord and Photographic Charges for etc Complete |
| 177 | 9.Construction of drama Stage at Somanathapuram in Melpadi Panchayat @ Katpadi Block |
| 178 | Earthwork excavation and dwposition on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Board officers.Hard stiff clay, block cotton, hard red earth, shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B |
| 179 | Supply of Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications |
| 180 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete |
| 181 | Brick work in cement mortar 1:5 mix using country bricks 83/4\\"x43/8\\"x23/4\\" and conveyance of all materials to site and all labour charges etc complete |
| 182 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beam for etc Complete |
| 183 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beam for etc Complete |
| 184 | Supplying, fabricating and placing in position of HSD steel rods for reinforcement including the cost of steel and binding wire etc., complete and as directed by Board officers. |
| 185 | Reinforced cement concrete 1:1.5:3mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete |
| 186 | Supply of Well gravel and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications |
| 187 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete |
| 188 | Cost and Supply of Steel Door for all Cost etc Complete |
| 189 | Cost and Supply of Steel Window for all Cost etc Complete |
| 190 | Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete |
| 191 | Plastering with cement mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete |
| 192 | Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two sand and Four aggregate) using for etc Complete |
| 193 | Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete |
| 194 | Painting two coats with approved Plastic Emulsion over one coat of Priming coat of Cement Paint over cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. |
| 195 | Painting two coats over New iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete |
| 196 | Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor cable of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 3 mm thick Hylum sheet cover with TW box And 5 A FT switch with continuous earth connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for PVC concealed Light point / fan point (For electronic Regulator) SD 24 |
| 197 | Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 150 mm X 100 mm X 113 mm TW switch box with 3 mm thick Hylum sheet cover for 5 A 3 pin non interlocking CS plug with continuous earth wire connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for concealed PVC plug point SD 36 |
| 198 | Supply and fixing of 1200 mm ( 48\\") AC ceiling fan complete with stepped electronic 300 W regulator with 300 mm down rod on the existing clamp. SD 106 |
| 199 | Supply and fixing of single box type 4' 40 W flu fitting complete with copper choke and condensor with TW round blocks on wall or ceiling with flu tube with PVC unsheathed Copper leads fron terminals to the fitting with top light fittings |
| 200 | Supply and fixing of 16 Amps DPIC Switch of 500 V with fuse and neutral (Side Handle) on suitable TW box PWD Earthing SD 136 |
| 201 | Supply and fixing of Meter Board Three Phase SD No. 127 |
| 202 | Supply and run of 2 X 1.5 sq.mm (22 / 0.30) PVC insulated SC unsheathed copper Conductor of 1100 V grade in 25 mm dia GI pipe ( Class ' B ' ) suitably bent at both ends with necessary angle iron upright and end supports for mains. SD 67 |
| 203 | Providing for EB Deposit Charges |
| 204 | Providing Rainwater Harvesting Structure |
| 205 | Providing Nameboard & Photographic Charges |
| 206 | 10.Construction of Cermony shed at Periyamittut in Vinnampalli Panchayat at Katpadi Block |
| 207 | Earthwork excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete SS20B |
| 208 | Supply and filling with carted river sand including cost and conveyance etc complete |
| 209 | C.C 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all etc Complete |
| 210 | Brick work in CM1:5 using ground moulded country bricks including cost and conveyance of all materials etc complete |
| 211 | R.C.C 1:1.5:3mix using 20mm ISS HBG metal including cost and conveyance of all etc.. Complete |
| 212 | Supply and fabrication of mild steel and tor steel including cost and conveyance,labour charges etc,complete |
| 213 | Supply and erection of centering for RCC works etc complete |
| 214 | Supply and erection of centering for RCC works etc complete |
| 215 | Plastering with CM 1:5 12mm thick including cost and conveyance labour charges etc complete |
| 216 | Plastering with CM 1:3 10mm thick including cost and conveyance labour charges etc,complete |
| 217 | Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) |
| 218 | Weathering course Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete for etc complete.. |
| 219 | Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm for etc complete |
| 220 | Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 221 | Painting two coats with Distmber over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 222 | Towards Name board Charges |
| 223 | 11.Construction of Cermony shed at Karnambut in Karnambut Panchayat at Katpadi Block |
| 224 | Earthwork excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete SS20B |
| 225 | Supply and filling with carted river sand including cost and conveyance etc complete |
| 226 | C.C 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all etc Complete |
| 227 | Brick work in CM1:5 using ground moulded country bricks including cost and conveyance of all materials etc complete |
| 228 | R.C.C 1:1.5:3mix using 20mm ISS HBG metal including cost and conveyance of all etc.. Complete |
| 229 | Supply and fabrication of mild steel and tor steel including cost and conveyance,labour charges etc,complete |
| 230 | Supply and erection of centering for RCC works etc complete |
| 231 | Supply and erection of centering for RCC works etc complete |
| 232 | Plastering with CM 1:5 12mm thick including cost and conveyance labour charges etc complete |
| 233 | Plastering with CM 1:3 10mm thick including cost and conveyance labour charges etc,complete |
| 234 | Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) |
| 235 | Weathering course Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete for etc complete.. |
| 236 | Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm for etc complete |
| 237 | Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 238 | Painting two coats with Distmber over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 239 | Towards Name board Charges |
| 240 | 12.Construction of Cermony shed at Muthiyalpalli in Ponnai Panchayat at Katpadi Block |
| 241 | Earthwork excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete SS20B |
| 242 | Supply and filling with carted river sand including cost and conveyance etc complete |
| 243 | C.C 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all etc Complete |
| 244 | Brick work in CM1:5 using ground moulded country bricks including cost and conveyance of all materials etc complete |
| 245 | R.C.C 1:1.5:3mix using 20mm ISS HBG metal including cost and conveyance of all etc.. Complete |
| 246 | Supply and fabrication of mild steel and tor steel including cost and conveyance,labour charges etc,complete |
| 247 | Supply and erection of centering for RCC works etc complete |
| 248 | Supply and erection of centering for RCC works etc complete |
| 249 | Plastering with CM 1:5 12mm thick including cost and conveyance labour charges etc complete |
| 250 | Plastering with CM 1:3 10mm thick including cost and conveyance labour charges etc,complete |
| 251 | Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) |
| 252 | Weathering course Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete for etc complete.. |
| 253 | Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm for etc complete |
| 254 | Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 255 | Painting two coats with Distmber over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 256 | Towards Name board Charges |
| 257 | 13.Construction of Cermony shed at Srinivasapuram in Paramasathu Panchayat at Katpadi Block |
| 258 | Earthwork excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete SS20B |
| 259 | Supply and filling with carted river sand including cost and conveyance etc complete |
| 260 | C.C 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all etc Complete |
| 261 | Brick work in CM1:5 using ground moulded country bricks including cost and conveyance of all materials etc complete |
| 262 | R.C.C 1:1.5:3mix using 20mm ISS HBG metal including cost and conveyance of all etc.. Complete |
| 263 | Supply and fabrication of mild steel and tor steel including cost and conveyance,labour charges etc,complete |
| 264 | Supply and erection of centering for RCC works etc complete |
| 265 | Supply and erection of centering for RCC works etc complete |
| 266 | Plastering with CM 1:5 12mm thick including cost and conveyance labour charges etc complete |
| 267 | Plastering with CM 1:3 10mm thick including cost and conveyance labour charges etc,complete |
| 268 | Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) |
| 269 | Weathering course Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete for etc complete.. |
| 270 | Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm for etc complete |
| 271 | Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 272 | Painting two coats with Distmber over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 273 | Towards Name board Charges |
| 274 | 14.Construction of Cermony shed at Konderipalli in Serkadu Panchayat at Katpadi Block |
| 275 | Earthwork excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete SS20B |
| 276 | Supply and filling with carted river sand including cost and conveyance etc complete |
| 277 | C.C 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all etc Complete |
| 278 | Brick work in CM1:5 using ground moulded country bricks including cost and conveyance of all materials etc complete |
| 279 | R.C.C 1:1.5:3mix using 20mm ISS HBG metal including cost and conveyance of all etc.. Complete |
| 280 | Supply and fabrication of mild steel and tor steel including cost and conveyance,labour charges etc,complete |
| 281 | Supply and erection of centering for RCC works etc complete |
| 282 | Supply and erection of centering for RCC works etc complete |
| 283 | Plastering with CM 1:5 12mm thick including cost and conveyance labour charges etc complete |
| 284 | Plastering with CM 1:3 10mm thick including cost and conveyance labour charges etc,complete |
| 285 | Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) |
| 286 | Weathering course Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete for etc complete.. |
| 287 | Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm for etc complete |
| 288 | Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 289 | Painting two coats with Distmber over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 290 | Towards Name board Charges |
| 291 | 15.Construction of Cermony shed at Thathireddypalli in Mahimandalam Panchayat at Katpadi Block |
| 292 | Earthwork excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete SS20B |
| 293 | Supply and filling with carted river sand including cost and conveyance etc complete |
| 294 | C.C 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all etc Complete |
| 295 | Brick work in CM1:5 using ground moulded country bricks including cost and conveyance of all materials etc complete |
| 296 | R.C.C 1:1.5:3mix using 20mm ISS HBG metal including cost and conveyance of all etc.. Complete |
| 297 | Supply and fabrication of mild steel and tor steel including cost and conveyance,labour charges etc,complete |
| 298 | Supply and erection of centering for RCC works etc complete |
| 299 | Supply and erection of centering for RCC works etc complete |
| 300 | Plastering with CM 1:5 12mm thick including cost and conveyance labour charges etc complete |
| 301 | Plastering with CM 1:3 10mm thick including cost and conveyance labour charges etc,complete |
| 302 | Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) |
| 303 | Weathering course Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete for etc complete.. |
| 304 | Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm for etc complete |
| 305 | Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 306 | Painting two coats with Distmber over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 307 | Towards Name board Charges |
| 308 | 16.Construction of Cermony shed at Ellayanellore in Ellayanellore Panchayat at Katpadi Block |
| 309 | Earthwork excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete SS20B |
| 310 | Supply and filling with carted river sand including cost and conveyance etc complete |
| 311 | C.C 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all etc Complete |
| 312 | Brick work in CM1:5 using ground moulded country bricks including cost and conveyance of all materials etc complete |
| 313 | R.C.C 1:1.5:3mix using 20mm ISS HBG metal including cost and conveyance of all etc.. Complete |
| 314 | Supply and fabrication of mild steel and tor steel including cost and conveyance,labour charges etc,complete |
| 315 | Supply and erection of centering for RCC works etc complete |
| 316 | Supply and erection of centering for RCC works etc complete |
| 317 | Plastering with CM 1:5 12mm thick including cost and conveyance labour charges etc complete |
| 318 | Plastering with CM 1:3 10mm thick including cost and conveyance labour charges etc,complete |
| 319 | Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) |
| 320 | Weathering course Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete for etc complete.. |
| 321 | Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm for etc complete |
| 322 | Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 323 | Painting two coats with Distmber over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 324 | Towards Name board Charges |
| 325 | 17.Construction of Cermony shed at Thalayampattu in TKPuram Panchayat at Katpadi Block |
| 326 | Earthwork excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete SS20B |
| 327 | Supply and filling with carted river sand including cost and conveyance etc complete |
| 328 | C.C 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all etc Complete |
| 329 | Brick work in CM1:5 using ground moulded country bricks including cost and conveyance of all materials etc complete |
| 330 | R.C.C 1:1.5:3mix using 20mm ISS HBG metal including cost and conveyance of all etc.. Complete |
| 331 | Supply and fabrication of mild steel and tor steel including cost and conveyance,labour charges etc,complete |
| 332 | Supply and erection of centering for RCC works etc complete |
| 333 | Supply and erection of centering for RCC works etc complete |
| 334 | Plastering with CM 1:5 12mm thick including cost and conveyance labour charges etc complete |
| 335 | Plastering with CM 1:3 10mm thick including cost and conveyance labour charges etc,complete |
| 336 | Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) |
| 337 | Weathering course Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete for etc complete.. |
| 338 | Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm for etc complete |
| 339 | Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 340 | Painting two coats with Distmber over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 341 | Towards Name board Charges |
| 342 | 18.Construction of Cermony shed at SNPalayam in Ponnai Panchayat at Katpadi Block |
| 343 | Earthwork excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete SS20B |
| 344 | Supply and filling with carted river sand including cost and conveyance etc complete |
| 345 | C.C 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all etc Complete |
| 346 | Brick work in CM1:5 using ground moulded country bricks including cost and conveyance of all materials etc complete |
| 347 | R.C.C 1:1.5:3mix using 20mm ISS HBG metal including cost and conveyance of all etc.. Complete |
| 348 | Supply and fabrication of mild steel and tor steel including cost and conveyance,labour charges etc,complete |
| 349 | Supply and erection of centering for RCC works etc complete |
| 350 | Supply and erection of centering for RCC works etc complete |
| 351 | Plastering with CM 1:5 12mm thick including cost and conveyance labour charges etc complete |
| 352 | Plastering with CM 1:3 10mm thick including cost and conveyance labour charges etc,complete |
| 353 | Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) |
| 354 | Weathering course Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete for etc complete.. |
| 355 | Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm for etc complete |
| 356 | Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 357 | Painting two coats with Distmber over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 358 | Towards Name board Charges |
| 359 | 19.Construction of drainage at Senur VIP Nagar in Senur Panchayat at Katpadi Block |
| 360 | Earthwork excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete SS20B |
| 361 | Cement concrete 1:4:8 mix using 40mm ISS metal including all cost and conveyance of all materials to site and all labour charges etc complete. |
| 362 | Supply and erection of centering for RCC works etc complete |
| 363 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete |
| 364 | Plastering with CM 1:4,20mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete |
| 365 | Towards Name board and Photo Graphic Charges |
| 366 | 20.Construction of Cermony shed at Kokkeri in Gollapalli Panchayat at Katpadi Block |
| 367 | Earthwork excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete SS20B |
| 368 | Supply and filling with carted river sand including cost and conveyance etc complete |
| 369 | C.C 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all etc Complete |
| 370 | Brick work in CM1:5 using ground moulded country bricks including cost and conveyance of all materials etc complete |
| 371 | R.C.C 1:1.5:3mix using 20mm ISS HBG metal including cost and conveyance of all etc.. Complete |
| 372 | Supply and fabrication of mild steel and tor steel including cost and conveyance,labour charges etc,complete |
| 373 | Supply and erection of centering for RCC works etc complete |
| 374 | Supply and erection of centering for RCC works etc complete |
| 375 | Plastering with CM 1:5 12mm thick including cost and conveyance labour charges etc complete |
| 376 | Plastering with CM 1:3 10mm thick including cost and conveyance labour charges etc,complete |
| 377 | Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) |
| 378 | Weathering course Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete for etc complete.. |
| 379 | Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm for etc complete |
| 380 | Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 381 | Painting two coats with Distmber over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 382 | Providing Nameboard & Photographic Charges |
| 383 | GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
| 5 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail