| 1 | Labour, machinery, Consumables for the Fabrication for steel structures.with electricity supplied by Department at free of cost for Heavy section (14 kg/m and above) |
| 2 | Labour, machinery, Consumables for the Fabrication for steel structures.with electricity supplied by Department at free of cost. Light section (below 14 kg/m) |
| 3 | Labour for the Erection of the Fabricated Steel Structures with electricity supplied by Department at free of cost. Heavy section (14 kg/m and above) |
| 4 | Labour for the Erection of the Fabricated Steel Structures with electricity supplied by Department at free of cost. Heavy section (14 kg/m and above) (LC Period 30% Extra) |
| 5 | Labour for the Erection of the Fabricated Steel Structures with electricity supplied by Department at free of cost. Light section (below 14 kg/m) |
| 6 | Labour for the Erection of the Fabricated Steel Structures with electricity supplied by Department at free of cost. Light section (below 14 kg/m) (LC Period 30% Extra) |
| 7 | Labour, machinery, consumables for fabrication, erection of earthmat, earth connection, earth electrode, earthspike (including sharpening of earth spike and earth work excavation and refilling). As directed by the field engineer with electricity supplied by Department at free of cost. |
| 8 | Providing Earth bore 140/150 mm dia using power rig or 100/125 mm dia using hand bore set including the labour, lead, lift etc., sedimentary strata of clay & sand stone shale pebbles boulders etc., for earth Pits with supply and providing of Bentonite powder(Sodium Bentonite) 5Kg /Mtr depth of the bore mixed with low resistivity earths as directed by the field Engineer. (Earth to be supplied by the contractor)(LC Period 30% Extra) |
| 9 | Providing Earth bore 140/150 mm dia using power rig or 100/125 mm dia using hand bore set including the labour, lead, lift etc., sedimentary strata of clay & sand stone shale pebbles boulders etc., for earth Pits with supply and providing of Bentonite powder(Sodium Bentonite) 5Kg /Mtr depth of the bore mixed with low resistivity earths as directed by the field Engineer. (Earth to be supplied by the contractor) |
| 10 | Labour charges for providing /placing grouting bolt by template for 110KV breaker, C.T/PT structure, as directed by the field engineer. |
| 11 | Labour charges for hot dip galvanising of mild steel materials including transport, lead, lift, etc.,complete wherever required as directed by the field engineer. |
| 12 | Supply &Crimping of Lugs of Suitable sizes as required for PT/CT Jumbers, etc as directed by the field engineer. |
| 13 | Supply & Labour charges for two coats of enamel painting in any substation structures, steels, etc and wherever required including the cost of reputed make paints and other consumables as directed by the field engineer. |
| 14 | Labour charges for writing details in any finished surface/board including cost of enamel paints and other consumables as directed by the field engineer. |
| 15 | Labour for erection of 230 KV Breaker using crane arranged by the Contractor including the cost of gada cloth taflan tape and other consumables including support structure providing holes, gas filling wherever necessary as directed by the field engineer. |
| 16 | Labour for erection of 110 KV Breaker using crane arranged by the Contractor including the cost of gada cloth taflan tape and other consumables including support structure providing holes, gas filling wherever necessary as directed by the field engineer. |
| 17 | Labour for erection of 230 KV CT Measurement transformers, reactor units, using Crane arranged by the Contractor including providing holes wherever required as directed by the field engineer. |
| 18 | Labour for erection of Measurement transformers, reactor units, using Crane arranged by the Contractor including providing holes wherever required as directed by the field engineer. 110kV CT's and PT's |
| 19 | Labour for erection of 230 KV LAS station/Distribution type single unit including monitors & accessories. |
| 20 | Labour for erection of 110 KV LAS station/Distribution type single unit including monitors & accessories. |
| 21 | Labour for erection of 230 KV AB Switch without earth with proper allingments including accessories, Meggering and cost of consumables and lubricants and as directed by the field engineer. with electricity supplied by Department at free of cost. |
| 22 | Labour for erection of 230 KV AB Switch without earth with proper allingments including accessories, Meggering and cost of consumables and lubricants and as directed by the field engineer. with electricity supplied by Department at free of cost. (LC period 30% extra) |
| 23 | Labour for erection of 110 KV AB Switch without earth with proper allingments including accessories, Meggering and cost of consumables and lubricants and as directed by the field engineer. with electricity supplied by Department at free of cost. (LC period 30% extra) |
| 24 | Labour for the Erection of 230 KV Double Conductor Strung Bus/phase and all related hardwares, fittings, clamps including Meggering, hoisting of insulators, and consumables and as directed by the field engineer. (LC period 30% extra) |
| 25 | Labour for the Erection of 110 KV Double Conductor Strung Bus/phase and all related hardwares, fittings, clamps including Meggering, hoisting of insulators, and consumables and as directed by the field engineer. |
| 26 | Labour for the erection of 230 KV Insulator single pole stack for supports Uprights/Underhang including Meggering & other consumables and as directed by the field engineer. |
| 27 | Labour for the erection of 230 KV Insulator single pole stack for supports Uprights/Underhang including Meggering & other consumables and as directed by the field engineer. (LC period 30% extra) |
| 28 | Labour for the erection of 75 mm Busbar including suitable Modifications of End Clamps, providing holes wherever necessary as directed by the field engineer. |
| 29 | Labour for the erection of 75 mm Busbar including suitable Modifications of End Clamps, providing holes wherever necessary as directed by the field engineer. (LC period 30% extra) |
| 30 | Labour for the erection of 75 mm Busbar with Bend including suitable Modifications of End Clamps, providing holes wherever necessary as directed by the field engineer. |
| 31 | Labour for the Erection of Jumper/Droppers using Zebra/panther Double Conductors including Modification of End clamps, providing holes etc,. (LC period 30% extra) |
| 32 | Labour for the Erection of Control Panels includings consumables as directed by the field engineer. Simplex type/AC/DC/C&R Panel of Non-Grid type, Battery Chargers, Single feeder Control/Relay Panels of Grid type (P&C) |
| 33 | Labour for laying of cable in duct/trench/clamping on structures - neat laying in the ducts with identification Tags,Plastic token in all duct corners for easy identification of cables. including fabrication of clamps and fixing at uniform intervals as directed by the field engineer.Upto 8 Core |
| 34 | Labour for laying of cable in duct/trench/clamping on structures - neat laying in the ducts with identification Tags,Plastic token in all duct corners for easy identification of cables. including fabrication of clamps and fixing at uniform intervals as directed by the field engineer. Above 8 Core |
| 35 | Labour charges for laying of control/ yardlight cable by digging cable trench of size 0.3mX0.6m filling with for a depth of 0.2m, covering with one layer of country bricks and refilling with excavated earth and including cost of sand and bricks,etc. |
| 36 | Supply and glanding of ISI mark cable gland of suitable size of reputed make including removing of insulation of cables and providing suitable holes as required and as directed by the field engineer. 16/19mm |
| 37 | Supply and glanding of ISI mark cable gland of suitable size of reputed make including removing of insulation of cables and providing suitable holes as required and as directed by the field engineer. 22/25 mm |
| 38 | Supply and glanding of ISI mark cable gland of suitable size of reputed make including removing of insulation of cables and providing suitable holes as required and as directed by the field engineer. 28/32 mm |
| 39 | Supply and glanding of ISI mark cable gland of suitable size of reputed make including removing of insulation of cables and providing suitable holes as required and as directed by the field engineer. 35mm |
| 40 | Termination of cable core end dressed neatly including the cost of cable socket (lug) ferrules, sleeves, tags, ties, stropes, etc., as directed by the field engineer.(No.of core ends in unit of 1000). |
| 41 | Supply and Erection of 5m Grouting type lamp post of B class MS pipe (3 inch dia for 3mtrs &2.5inch dia for 2mtrs)including single/double fitting fixing arrangements,1 inch dia B class pipe arms,yard light box fixing flat and one coat of redoxide and Two coat of Aluminium paint. |
| 42 | Supply and Erection of yard light fuse unit mounting box of size 200x200x150mm (BxHxD) out of 18 SWG (1.22mm) G.I Sheet as per drawing , provided with 16/20A rewirable Porcelain Fuse carrier unit, 16 A Bakelite connenectors including its cost materials, consumables, VAT, frieght, etc and as directed by the fiels engineer on site requirements. (The box shall be vermin proof,shall be provided with sturdy hinges,with provision for cable entry and locking arangements). |
| 43 | Fabrication, supply and fixing of AC junction box of size 535x310x127mm of 18 SWG M.S Sheet including HRC Fuse unit-18nos should be fitted with base, consumables, VAT, fright, etc., asTRANSCO standard and directed by the field engineer on site requirements.(The box shall be vermin proof shall have sturdy hinges, & locking arrangements) |
| 44 | fabrication,supply&fixing of Earthpit detail board including the cost of 20SWG CR Sheet,10mm RTS Rod ,T &P etc.,complete. |
| 45 | Supply and Labour charges for fixing of 20 SWG CR Sheet(size of board 8' x 4') in Equipment Details board/Fire Stand roof including the cost of CR Sheet ,Red oxide Paint etc.,complete. |
| 46 | Supply and laying,fixing in position of 10 kg/sqcm pressure 25mm dia PVC pipe (Make Appolo,Usha,Chemplast etc) including L bend,Tee,PVC Tape for Earth pit watering as directed by the field engineer on site requirements.. |
| 47 | Suppiy and Fixing of 1 inch GM gate valve (ISI/best quality) including cost of all materials and labour etc.,Complet. |
| 48 | Labour for erection of C.T/P.T junction box.(box supplied by department) |
| 49 | Supply and Erection of 1x72W or 2x36W, 240V LED street light Aluminum case fitting ISI- Make as per direction of site engineer.(inclusive of all taxes). |
| 50 | Supply & fixing of LC/Key board out of 75x 25 mm Alu. frame embedded with 12 mm pre-laminated wood particle board using screw on rear side, 2 Nos plain glass sliding shutter of 5 mm thick fixed with metal roller on Alu.channel with locking arrangements, glass piece handle shutters, wall clamp as directed by the field Engineer including cost of all materials & all consumables. |
| 51 | Supply and fixing of godrej 6 lever navtol lock with triplicate keys for A.B.Switches and for any other purpose including the cost of ring and key token as directed by the field engineer. |
| 52 | Supply and fixing of Key chain,ring and identification key token for A.B.Switches as directed by the field engineer. |
| 53 | Supply and erection of Vinyl Sticker cutting/Printing on Vinyl Sticker/Foam board to be used for main equipment, slogan, name board & any other purpose of required sizes as directed by the field engineer. |
| 54 | Labour for Dismantling of steel structures including all consumables Heavy section (above 14 kg/m) (LC period 30% extra) |
| 55 | Labour for Dismantling of steel structures including all consumables Heavy section (below 14 kg/m) (LC period 30% extra) |
| 56 | Labour for Dismantling of 230 KV Measurement transformers, reactor units, using Crane arranged by the Contractor including all consumables. (LC period 30% extra) |
| 57 | Labour for Dismantling of Jumper/Droppers using Moose/Zebra/panther Conductors including consumables. (LC period 30% extra) |
| 58 | Labour for Dismantling of Busbar including consumables. 75 mm (1 length)(LC period 30% extra) |
| 59 | Labour for Dismantling of 230KV Insulator single pole stack for supports/Underhang including consumables.(LC period 30% extra) |
| 60 | Supply and fabrication and erection of eye bolts with 20/22 mm rod confirming to IS with proper threading and 2 nos MS Nuts as directed by the field Engineer. |
| 61 | Supply and fabrication and erection of Grout bolts with 20/22 mm rod confirming to IS with proper threading and 2 nos MS Nuts as directed by the field Engineer. |
| 62 | Supply and provision of 12/25x3mm flexible braided copper / copper flats as required and as directed by the field engineer. |
| 63 | Labour for the loading/unloading/shifting of Department materials at stores or site by the Contractor WITHOUT using Board's crane for one operation. 230 KV Switches |
| 64 | Labour for the loading/unloading/shifting of Department materials at stores or site by the Contractor WITHOUT using Board's crane for one operation. 110 KV Switches |
| 65 | Labour for the loading/unloading/shifting of Department materials at stores or site by the Contractor WITHOUT using Board's crane for one operation. Cables / Conductors including cutting & Rewindingetc., |
| 66 | Labour for the loading/unloading/shifting of Department materials at stores or site by the Contractor WITHOUT using Board's crane for one operation. Busbars |
| 67 | Labour for the loading/unloading/shifting of Department materials at stores or site by the Contractor WITHOUT using Board's crane for one operation. 230 KV Breaker |
| 68 | Labour for the loading/unloading/shifting of Department materials at stores or site by the Contractor WITHOUT using Board's crane for one operation. 110 KV Breaker |
| 69 | Labour for the loading/unloading/shifting of Department materials at stores or site by the Contractor WITHOUT using Board's crane for one operation. 230/110 KV CT/PT/LAS etc., |
| 70 | Labour for the loading/unloading/shifting of Department materials at stores or site by the Contractor WITHOUT using Board's crane for one operation. 230 KV Insulators. |
| 71 | Labour for the loading/unloading/shifting of Department materials at stores or site by the Contractor WITHOUT using Board's crane for one operation. 110 KV Insulators. |
| 72 | Labour for the loading/unloading/shifting of Department materials at stores or site by the Contractor WITHOUT using Board's crane for one operation. Control Panels |
| 73 | Labour for the loading/unloading/shifting of Department materials at stores or site by the Contractor WITHOUT using Board's crane for one operation. Disc Insulators |
| 74 | Supply of Aluminium Power Fitting 6 Bolted Tension Fitting with SS Bolts and Nuts, frieght ,including modification if any etc., confirming to IS as per the drawing and specification. |
| 75 | Supply of Aluminium Power Clamp T Clamp for 75 mm Bus to Doble Zebra with SS Bolts and Nuts, frieght ,including modification if any etc., confirming to IS as per the drawing and specification. |
| 76 | Supply of Aluminium Power Clamp T Clamp for Double Zebra to Double Zebra with SS Bolts and Nuts, frieght ,including modification if any etc., confirming to IS as per the drawing and specification. |
| 77 | Supply of Aluminium Power Clamp Switch End Clamp for Double Zebra with SS Bolts and Nuts, frieght ,including modification if any etc., confirming to IS as per the drawing and specification. |
| 78 | Supply of Aluminium Power Clamp Free End Clamp for 75 mm Bus with SS Bolts and Nuts, frieght ,including modification if any etc., confirming to IS as per the drawing and specification. |
| 79 | Supply of Aluminium Power Clamp Seating Block with SS Bolts and Nuts, frieght ,including modification if any etc., confirming to IS as per the drawing and specification. |
| 80 | Supply of Aluminium Power Clamp 75mm Corona Bell with SS Bolts and Nuts, frieght ,including modification if any etc., confirming to IS as per the drawing and specification. |
| 81 | Supply of Aluminium Power Clamp PG Clamp with SS Bolts and Nuts, frieght ,including modification if any etc., confirming to IS as per the drawing and specification. |
| 82 | Supply and provision of M8,M10,M12 and M16 (full /Half thread)G.I.bolt and nuts of various sizes including plate/spring washers as required and as directed by the field engineer. |
| 83 | Labour for erection of 230 KV CT Measurement transformers, reactor units, using Crane arranged by the Contractor including providing holes wherever required as directed by the field engineer. (LC Period 30 % extra) |
| 84 | Typing & printing of Commisioning reports, Booklets.,etc. |
| 85 | Charges for Spiral Binding. |
| 86 | Xerox copy of commisioning reports, booklets, drawings etc. |
| 87 | Supply of steel items complete R.S. Joist 200 X 100 mm as per TNEB specification including cost of materials, loading, transporting, unloading and delivery at site. |
| 88 | Supply of steel items complete MS Channel 125 X 65 mm as per TNEB specification including cost of materials, loading, transporting, unloading and delivery at site. |
| 89 | Supply of steel items complete MS Channel 100 X 50 mm as per TNEB specification including cost of materials, loading, transporting, unloading and delivery at site. |
| 90 | Supply of steel items complete MS Angle 65 X 65 X 6 mm as per TNEB specification including cost of materials, loading, transporting, unloading and delivery at site. |
| 91 | Supply of steel items complete MS Angle 50 X 50 X 6 mm as per TNEB specification including cost of materials, loading, transporting, unloading and delivery at site. |
| 92 | Supply of steel items complete MS Flat 75 X 12 mm as per TNEB specification including cost of materials, loading, transporting, unloading and delivery at site. |
| 93 | Supply of steel items complete MS Flat 65 X 10 mm as per TNEB specification including cost of materials, loading, transporting, unloading and delivery at site. |
| 94 | Supply of steel items complete MS Flat 50 X 8 mm as per TNEB specification including cost of materials, loading, transporting, unloading and delivery at site. |
| 95 | Supply of steel items complete MS Rod 40 mm as per TNEB specification including cost of materials, loading, transporting, unloading and delivery at site. |
| 96 | Supply of steel items complete MS Chequered Plate 6mm as per TNEB specification including cost of materials, loading, transporting, unloading and delivery at site. |
| 97 | SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only |
| 98 | CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only |
| 99 | Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as \\"0\\" only Please Enable Macros to View BoQ information |