| 1 | Construction of 10000 Litre capacity of OHT and Extension of Pipe Line (300m) at Muthammalpuram village in Periyathalai Panchayat |
| 2 | Earth work excavation and depositing on bank with an intial lead of 10m and lift of 2m in hard stiff clay, etc for foundation |
| 3 | For first depth of 2m |
| 4 | For second depth of 1m |
| 5 | Sand filling for foundation with clear river sand watering, ramming and consolidation etc., complete. |
| 6 | Cement concrete 1:4:8 using 40mm HBG for leveling course |
| 7 | Reinforced cement concrete M30 grade using 10mm and 20mm Hard Broken Stone. The rates excluding the cost of supplying, fabricating and placing in opposition of MS / RTS Grills for reinforcement and centering, strutting & shuttering, but including cost of mixing, placing the concrete in position, vibrating, consolidating, finishing and curing the concrete etc., complete and as directed by the Engineer-in-charge. (The rates inclusive of testing the reservoir for the water tightness of the structure) |
| 8 | 1.50m to 4.5m Below GL |
| 9 | 0m to 1.5m Below GL |
| 10 | 0m to 4.5m above GL(for column, & Brace) |
| 11 | 4.51m to 7.32m above GL |
| 12 | 7.32m to 10.98m above GL |
| 13 | Centering for soffits of reinforced cement concrete slabs or plain surface including strutting upto 3m ht., using MS sheet of size 90cm x 60cm and BG. 10 gauge stiffened with welded MS angles of size 25mm x 2mm x 3mm laid over silver oak (country wood) joints of 10cm x 6.5cm spaced at about 90cm c/c and supported by Casurina props of 10cm to 13cm dia. at 75cm c/c complying with standard specification and as directed. |
| 14 | Plain Surface |
| 15 | Below GL |
| 16 | GL to 3.30m ht |
| 17 | 5.31m to 6.30m for Floor beam & slab |
| 18 | Centering for curved surface |
| 19 | Below GL |
| 20 | 0m-3.3m (Floor slab sides) |
| 21 | 5.31m to 6.30m |
| 22 | Centering for square column |
| 23 | Below GL |
| 24 | 0m-3.3m (Floor slab sides) |
| 25 | 3.31m to 4.30m |
| 26 | 4.31m to 5.30m |
| 27 | 5.31m to6.30m |
| 28 | Emulsion painting two coat with approved quality colour including cost and conveyance of all materials and all labour charges etc |
| 29 | Supplying, fabrication and placing in position of HSD steel rod for reinforcement including the cost of steel and binding wire etc., complete |
| 30 | Supply, delivery at site and fixing in position of MS ladder from GL to Roof top including bottom anchorage |
| 31 | Providing and fixing RCC inner access ladder in RCC 1:1.5:3 including cost of reinforcement, and centering charges, curing etc. |
| 32 | Providing PVC ventilating arrangements mos-juito proof nylon net. |
| 33 | Providing manhole power cover slab size 0.60 x 0.60 in RCC 1:1.5:3 with suitable rainforcement and 50 X 50 X6mm MS angle fixed along edges and directed by TWAD Boad Officers, |
| 34 | Provision for pipe connection arrangement for inlet, outlet scour and overflow etc., including cost of pipe, special, valve, labour charges for lifting, aligning, cutting, threading, fixing and painting of GI pipes with two coats of approved quality enamel paint etc., complete. |
| 35 | 65mm dia GI pipe for inlet connection |
| 36 | 65mm dia GI Tee |
| 37 | 65mm dia GI 90Bend |
| 38 | 65mm dia GI Coupler |
| 39 | 65mm dia GI Union |
| 40 | 65mm dia GI Elbow |
| 41 | 65mm dia GM Gate Valve |
| 42 | 50mm dia GM Gate Valve |
| 43 | Provision for pipe line arrangements |
| 44 | Supply and delivery of 75 mm pvc 4 ksc pipes for pumping main system |
| 45 | Earthwork excavation and depositing on bank with initial lead of 10m and lift of 2m in narrow trenches for laying of pipesin Hard stiff clay,stiff black cotton,hard red earth,shales,murram ,gravel,earth mixed with small sized boulders etc... |
| 46 | Laying of 75 mm pvc 4 ksc pipes to proper line and level including jointing but excluding cost of pipes |
| 47 | Refilling the excavated earth after laying and joining of pipes including all labour charges etc..complete |
| 48 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |