| 1 | Painting and Overhauling the Sluice shutters |
| 2 | OD21975/2023-2024:Cleaning all the debris deposited, if any from shutters and its grooves includingcost of all material, labour charges,tools if any etc. complete. |
| 3 | OD53310/2025-2026:Painting all the exposed surfaces of the gate and embedded parts with two coats of epoxy coal tar black paint confirming to IS14948 with a minimum film thickness of 150+/-5 microns per each coat over two coats of priming coat applied with high build surface tolerant coating having low VOC primer with a film thickness of 70+/-5 microns , so that the total film thickness of all coats including priming coat at any rate is not less than 350 microns after cleaning the surface using hand and power tool cleaning including cost of all materials, labour charges , cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site |
| 4 | 85.103:Supply of MS checquered plates including cost of conveyance charges |
| 5 | 85.124:Fabrication and supply of Hoisting bride unit in structural steel confirming to IS2062 Gr including ladder, covers for hoisting unit etc as per approved specifications, drawings and directions of departmental officer at site including cost of labour, machinery, incidental and handling charges for fixing handrails and allied works etc complete but excluding material already supplied and weight of pipes for hand rails etc |
| 6 | 85.136:Erection of the hoisting bridge unit including handrails , ladder and platform etc. in correct alignment and anchoring it ; setting and aligning the covers of the hoisting unit etc complete including cost of all labour, machinery, incidental and conveyance , lead and lift charges etc complete but excluding cost of materials already supplied |
| 7 | 85.115:Cost of painting with 2 coats of enamel paint over 1 coat of zinchromate primer as per IS1477:1994 after hand and power tool cleaning including cost of all materials, labour charges, cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site |
| 8 | OD21280/2023-2024:Overhauling the spillway shutters such as worm reducer,gears,pinions,plummerblocks,chain & sprockets,bearings etc of hoist mechanism and wire ropes, applying cardium compound,pivots of electromagnetic brackes,trunion bushes etc.twice in year including the cost of all materials,labour charges(including dismantling & refitting of hoist unit covers etc.) coveyance charges etc.complete as directed by thedeptl.official at site. |
| 9 | OD25856/2024-2025:Trial run the shutter including cost of all labour ,materials etc complete |
| 10 | Replacing the damaged rubber seal in Emergency shutter |
| 11 | OD19195/2025-2026:Removing the damaged rubber seal from the Emergency shutter including cost of all labour ,machinery etc |
| 12 | OD19200/2025-2026:Supplying and fixing in correct position with specified initial interface P type rubber seal confirming to IS11855 to the gates including cost of SS bolts and nuts and all labour and machinery and incidental and conveyance charges complete as per approved specifications and drawings |
| 13 | OD19557/2025-2026:Supplying and fixing in correct position with Angular bulb nose rubber seal for corners to the gates including cost of SS bolts and nuts and all labour and machinery and incidental and conveyance charges complete including scaffolding and special appliances as per approved specifications and drawings |
| 14 | OD19592/2025-2026:Supply of MS plates confirming to IS 2062GrB including cost of conveyance charges |
| 15 | OD19594/2025-2026:Fabrication and supply of Structural Steel wheel gate and accessories as per approved specifications, drawings and directions of deptl officer at site including cost of labour , machinery , incidental and handling charge etc complete but exculding cost of materials already supplied Please Enable Macros to View BoQ information |