| 1 | Labour engaged for removing the earth from above the drainage slabs and then refilling after drainage maintenance |
| 2 | Labour engaged for remove the slab and then resetting after cleaning the drainageLabour for removing and resetting drainage slab(Drainage size of 150m(Avg length). |
| 3 | Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. |
| 4 | Labour engaged for cleaning to the drain filled with slurry and accumulated earth for dumping to the suitable place without any complaint from devotees and public. |
| 5 | Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In lime mortar |
| 6 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. |
| 7 | Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 9 | 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |
| 10 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 11 | Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 12 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelMild steel and Medium Tensile steel bars |
| 13 | Constructing brick masonry manhole in cement mortar 1:4 ( 1 cement : 4 coarse sand) with R.C.C. top with 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), foundation concrete 1:4:8 mix ( 1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size,) inside plastering 12 mm thick with cement mortar 1:3 ( 1 cement : 3 coarse sand) finished with floating coat of neat cement and making channels in cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size ) finished with a floating coat of neat cement complete as per standard design:Inside size 90x80 cm and 45 cm deep including C.I. cover with frame (light duty) 455x610 mm internal dimensions, total weight of cover and frame to be not less than 38 kg (weigh of cover 23 kg and weight of frame 15 kg):With common burnt clayF.P.S. (non modular) bricks of class designation 7.5 |
| 14 | Providing precast concrete ring for well.Concrete ring of 1.10 m outer dia, 0.10 m thickness and 0.35 m height.Cost and conveyance of all materials,labour charges for insitu casting etc complete as per direction of Engineer in charge |
| 15 | Labour engaged for conveying lifting and erecting precast concrete ring. |
| 16 | Providing RCC concrete cover for concrete ring of 1.10 m outer dia, 0.10 m thickness.Cost and conveyance of all materials,labour charges for insitu casting etc complete as per direction of Engineer in charge |
| 17 | 20 mm cement plaster of mix:1:4 (1 cement : 4 fine sand) Please Enable Macros to View BoQ information |