| 1 | Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 meter transporting to sites spreading grading to require slope and compaction to meet requirement of table 300.1 & 300.2 with a lead up to 1000 meter as per MORD technical specification clause 301.5 MORD sepecification 301.5(i) S.No. 3.4(Carted soil) |
| 2 | Construction of Granular sub base by providing well graded material, spreading in uniform layer with motor grader on prepared surface mixing by mix in place method with with rotavator at OMC and compacting with smooth wheel roller to achive the desired density complete as per clause 401. |
| 3 | Interlocking concret block pavementProviding and laying of interlocking concret block Pavements having thicknees 80 mm as per drawings and technical specification clause 1504 |
| 4 | Construction of K.C. Drain Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge:(All kinds of soil)As per DSR-2.1.1 |
| 5 | Supplying and filling in plinth with sand under floors, including watering,ramming, consolidating and dressing complete.As per DSR-2.27 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).As per DSR-4.1.8 |
| 7 | Brick work with common burnt clay F.P.S. (non modular ) bricks of class designation 7.5 in foundation and plinth Cement morter 1:4 .As DSR NO.- 6.1.1 |
| 8 | CEMENT PLASTER (IN FINE SAND)12 mm cement plaster of mix :in 1:4 (1 cement: 4 fine sand).AS per DSR No.- 13.1.1 |
| 9 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) :.As per DSR-5.2.2 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars.As per DSR-5.22.1 |
| 11 | Centering and shuttering including strutting, propping etc. and removal of form work for :Foundations, footings, bases for columns.As per DSR-4.3.1 |
| 12 | Supply & fixing of inauguration marble stone fixed in 1:4 brick work, Plastering, Letter writing, carriage upto side of work with all labours, materials etc. complete. Please Enable Macros to View BoQ information |