| 1 | Demolishing reinforced cement concrete Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in -charge. |
| 2 | Demolishing Brick work in cement mortar manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. |
| 3 | Excavation or cleaning wet sludge/silt etc all complete as per the direction of engineer in charge. |
| 4 | Earth Work in Excavation ordinary soil including lift up to 1.50 m and lead upto 30.00 m including filling watering and ramming of excavated earth etc all complete as per the direction of engineer in charge. |
| 5 | Disposal of refused material lead up to 8 km distance including loading un loading etc etc all completed as per the direction of engineer - in - charge. |
| 6 | Providing & supply gunny bags i/c cost of sand and stitching of bags and laying in position. |
| 7 | Dewatering/Diversion of water by diesal engine pump including opretor, fuel, required length of flexible pipe for proper disposal of water etc all completed as per the direction of engineer - in - charge. |
| 8 | S/L Concrete (1:6:12) with 40 mm gauge brick ballast ,fine sand of 1.25 f.m and cement in foundation and under floor including all materials,labour,tools, & plant etc all completed as per the direction of engineer - in - charge. |
| 9 | R.C.C work with cement ,approved coarse sand & 2cm gauge approved stone grit in proportions of 1:1.5:3 in lintels of doors &windows excluding supply of reinforcement and its bending ,but including its fixing and binding wire including necessary cantering and shuttering etc .and supply of all materials,labour,tools& plants etc. required for proper completion of the work including cost of binding wire. the rate excludes making of drip course which shall be paid extra etc all complete as per direction of engineer in charge. |
| 10 | S/F M:S (tor steel or plain) in plain work such as R:C:C or R:B work including bending for proper shape as necessary including bending for proper complition of the work and including supply of all steel & wasteage, bend, hooks, and authorised overlappinf shall be measured etc all complete as per direction of engineer in charge. |
| 11 | S/S of 22.4-53mm gauge stone ballast with stacking for measurement etc all complete as per direction of engineer in charge |
| 12 | Consoliadtion of stone ballast. |
| 13 | Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator,filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge. 80 mm thick C.C. paver block of M-30 grade with approved color design and pattern |
| 14 | Deduction of old bricks bats. |
| 15 | S/F of M S sign Board. |
| 16 | GST Please Enable Macros to View BoQ information |