|
| 1 | Dismantling reinforced cement concrete or reinforced brick work including stacking of materials as directed by the Engineer-in- charge within a distance of 60 metre (200 feet). PWD SOR 2022 17.3 |
| 2 | Dimantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the Engineer-in- charge within a distance of 60 meter (200 feet). |
| 3 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre leadas per direction of Engineer-in-Charge. |
| 4 | Supply of local sand filied in empty cement bag (minimun 1 cuft sand shall be filled in bag) at site etc all complete as per the direction of engineer in charge.Conted Earth |
| 5 | Dewatering Pump 5 HP |
| 6 | Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. |
| 7 | R.C.C work with cement ,approved coarse sand & 2cm gauge approved stone grit in proportions of 1:1.5:3 in lintels of doors &windows excluding supply of reinforcement and its bending ,but including its fixing and binding wire including necessary cantering and shuttering etc .and supply of all materials,labour,tools& plants etc. required for proper completion of the work including cost of binding wire. the rate excludes making of drip course which shall be paid extra etc all complete as per direction of engineer in charge.(AS PER PWD SOR 2020/283 a .) |
| 8 | Steel reinforcement for R.C.C work including straightening ,cutting ,bending,placing in position and binding all complete upto plinth level mild steel and medium tensile steel bars DSR 2023 ITEM N.5.22.1 |
| 9 | S/S of 22.4 to 53mm gauge stone ballast with stacking for measurment etc. all complete as per the direction of Engineer in charge (AS PER PWD SOR 2020 RMR) |
| 10 | Supply of screening material with stacking for measurment 11 etc all complete as per the direction of engineer in-charge AS PER PWD SOR 2020 RMR |
| 11 | Consolidation of stone aggregates of 45-63 mm/22.4-53mm size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2/3 as per Technical Specification Clause 405. AS PER PWD SOR 2022 20.2.1 |
| 12 | Supply & laying 80 mm thick Precase cement concrete i-shape interlocking paver block (Grey color) with top layer of having plan dimension 200X(160+120mm) of O.P cement smoothing gloss finish, skid resistant manufacturered from rubber moulds through vibro-compression mechanism. the compressive strength of concrete paver block shall not be less than 30 mpa (M-30) and weight 5kg .per no. confirming to 15:15658-2006 including cost of material, labour,t&p etc. required for proper completion of the work as directed by Engineer -in-charge |
| 13 | Cement Concrete with 2 cm. gauge stone grit instead of 4 cm. gauge stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. Required for proper completion of the work. |
| 14 | Desposal of refused material lead up to 8 km distance including loading un loading etc etc all completed as per the direction of engineer - in - charge. |
| 15 | Deduct of old Tiles |
| 16 | Deduct of old Bricks |
| 17 | Deduct of old B/Bats |
| 18 | GST Please Enable Macros to View BoQ information |