| 1 | Dismantling reinforced cement concrete or reinforced brick work including stacking of materials as directed by the Engineer-in- charge within a distance of 60 metre (200 feet). PWD SOR 2022 17.3 |
| 2 | E/W in Excavation in foundation in ordinary soil etc allcomplete as the direction of engineer in charge. |
| 3 | Desposal of refused material/malwa distance up to 8 km etc all complete as the direction of engineer in charge. |
| 4 | S/L P:C:C (1:6:12) with 40 mm gauge brick ballast ,fine sand of 1.25 f.m and cement in foundation and under floor including all materials,labour,tools, & plant etc all completed as per the direction of engineer - in - charge |
| 5 | R.C.C work with cement ,approved coarse sand & 2cm gauge approved stone grit in proportions of 1:1.5:3 in lintels of doors &windows excluding supply of reinforcement and its bending ,but including its fixing and binding wire including necessary cantering and shuttering etc .and supply of all materials,labour,tools& plants etc. required for proper completion of the work including cost of binding wire. the rate excludes making of drip course which shall be paid extra etc all complete as per direction of engineer in charge.(AS PER PWD SOR 2020/283 a .) |
| 6 | S/F M:S (tor steel or plain) in plain work such as R:C:C or R:B work including bending for proper shape as necessary including bending for proper complition of the work and including supply of all steel & wasteage, bend, hooks, and authorised overlappinf shall be measured etc all complete as |
| 7 | Providing and applying tack coat with bitumen VG - 10 grade using bitumen pressure distributor at the rate of .30 kg per sqm on the prepared granular surface treated with primer & cleaned with hydraulic broom as per technical specification clause 503. |
| 8 | Providing and laying bituminous concrete with HMP crushed aggregates from approved quarry of specified grading, premixed with bituminous binder (VG-30) @ 5.4 per cent by weight of total mix and filler,transporting the hot mix to work site,laying with a hydrostatic paver finisher to the required grade, level alignment,rolling with smooth wheeled. vibratory and tandem rollers to achieve the desired compaction (Ref. to Mort&HSpecification no. 507 ) Adjustment for bitumen shall be done as per job mix formula and e-in-c latter No 2651 Dt 27-07-12 for proper completion of work as per direction of engineer-in-cgarge including all labour,T&P,taxes , labour cess etc. complete. |
| 9 | S/L Hot applied Thermo Plastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area thick ness of 2.5 mm is exclusive of surface applied glass beads as per IRC 35. the finished surface to be level uniform and free from streak and holes. rates all including of all taxes royality vat etc all t & p /machine material and lobour required for proper complition of work. |
| 10 | Providing wall putty on new surface with approved quality material of Berger/ J.K./Birla or similar make 2 coats.AS PER PWD SOR 2022 662 NEW ITEM . |
| 11 | Finishing wall with weather coat by premium acrylic exterior paint applie of approved make and quality on wall with two or more coat to give an even shade including a priming coat with cement primer of approved brand and manufacturer exterior primer applied @ 2.20kg/10 sqm after thoroughly brushing the surface free from mortar dropping and other foreign matters and sand papered smooth including supply of all materials, labour, Tools & plants etc. required for proper completion of the work..AS PER PWD SOR 2022 662 NEW ITEM . |
| 12 | M.S. or iron work of small sizes and section such as holding down bolts, hold fast, tie rods grating etc. wrought to required from including supply of steel bolts, nuts wastage etc. and their fixing required for proper completion of the work.PWD SOR 2022 10.21 . |
| 13 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. DSR 2021 |
| 14 | S/L of stone ballast 22.4 to 53 mm size with stacking for measurment etc all complete as per the direction of engineer in-charge . AS PER PWD SOR 2020 RMR |
| 15 | Supply of screening material with stacking for measurment etc all complete as per the direction of engineer in-charge .AS PER PWD SOR 2020 RMR |
| 16 | Consolidation of stone aggregates of 45-63 mm/22.4-53mm size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2/3 as per Technical Specification Clause 405. AS PER PWD SOR 2022 20.2.1 |
| 17 | Laying of interlocking tiles of 60 to 80 mm thick including levelling and dressing of surface up to required laval andslopes filling joint with local sand including cost of labour etc all complete as per specification or direction by engineer in charge. (AS PER PWD SOR 2022 PAGE N. 53 SI N. 20.13 |
| 18 | Supply & laying 80 mm thick Precase cement concrete ishape interlocking paver block (Grey color) with top layer of minimum 8 mm thickness having plandimension 200X(160+120mm) of O.P cement smoothing gloss finish, skid resistant manufacturered from rubber moulds |
| 19 | Flexible Median Marker As Per IRC 79:2019: Flexible Median Marker (FMM) should be used for improving median visibility during dark hours. , Use of Median Marker provides safety against collision happening with medians during night time , or severe weather. Flexible Median Markers shall be provided with fluorescent yellow colour retro-reflective sheeting Type XI as per IRC:67. Flexible Median Marker shall be of tough, high impact resistant, injection molded, thermoplastic body with property of flexibility to provide high durability 'and U shape structure having rebound / bounce back property. the sheeting shall be of Type XI conforming to IRC:67 and it should be on both .the faces whereby providing maximum reflectivity at l,anger distances with adequate durability. The logo of the manufacturershall be embossed on either side of the body during the injection molding process. FMM shall be fixed by a combination bf epoxy adhesive and grouting/ drilling on concrete medians or properly constructed solid medians. Height: The marker height shall be aminimum of 180 mm. width 120 mm & Body Thickness: 6.5 mm. theshanks shall not be less than 20 mm and depth shall not be less than 30 rnm Reflective Area: Shall not be less than 90 cm square . Proof ofthe same Report shall be uploaded which quoting tender. The body of FMM shall bounce back to its original position of after 750 number ofhits using pendulum of 1.8 kg conforming 40 ASTM D256 adhesion between the body and outer casing body of FMM shall with stand 50 kgf Tensile loads conforming to ASTM D638 method. The rate shall include all materials, labour, T&P, transportation, installation and incidentals all complete as per direction of the Engineer-in-Charge. |
| 20 | SIGN BOARD etc all completed as per the direction of engineer - in - charge. |
| 21 | GST Please Enable Macros to View BoQ information |