| 1 | Outdoor Lighting Installation, Steel Tubular Pole, M.S. Pipe, G.I. Pipe, Pole CAP etc Supplying of Swaged Steel Tubular pole as per IS 2713, Pt. II, 1980 for following designation and of following dimensions.(Outside dia & thickness are given in Annexture -1)j) 410 SP - 33 ; 9.0 Mtr., 164.00 Kg. |
| 2 | SCHEDULE OF RATES FOR OH LINE INSTALLATION (LT DISTRIBUTION).Erection of Poles.Erection of Single Steel tubular pole of length as given below with/without sole plate & Cap etc. in CC foundation (Proportion and dimension indicated below), having 600x600x150 mm thick CC (4:2:1) base block below sole plate/pole with hard jhama metal including CC (6:3:1) muffing 0.30 mts. dia and 0.30 mts. above ground level including 3 mm thick neat cemented finish and GI earth bolt after making drilled holes etc. on pole & carriage of pole upto 1.6 Km from Store to work(site including filling up the excavated earth pit with shifted soil and ramming properlyUpto 9.0 mtr. Size 0.6x0.6x1.70 mts |
| 3 | Outdoor Lighting Installation, Steel Tubular Pole/ M.S Pipe/ G.I. Pipe, Pole CAP etc. Supplying & Fixing of m.s. Sole plate (450x450x6m) at the bottom of pole. |
| 4 | Painting of Steel Tubular Pole of lengths and no. of coats of paint, as given below with ready mixed paint/primer of(approved make, and brand incl. preparation of surface by sand paper/emery paper, cleaning etc. FOR receiving fresh coat of paint.Upto 9.0 mtr. long pole.(i)1st coat of aluminium paint over 1 coat of RO priming |
| 5 | Painting of Steel Tubular Pole of lengths and no. of coats of paint, as given below with ready mixed paint/primer of(approved make, and brand incl. preparation of surface by sand paper/emery paper, cleaning etc. FOR receiving fresh coat of paint.Upto 9.0 mtr. long pole.ii2nd coat of aluminium paint over 1st coat |
| 6 | SCHEDULE OF RATES FOR EARTHINGINSTALLATIONS.Earthing Installation ... with Pipe Electrode.Earthing with 50 mm dia GI pipe 3.64 mm thick x 3.04 Mts. long and 1 x 4 SWG GI (HOT Dip) wire (4 Mts. long), 13 mm dia x 80 mm long GI bolts, double nuts, double washers incl. S & F 15 mm dia GI pipe protection (1 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level driven to an average depth of 3.65 Mts. below the ground level as below:(a)By ISI Medium GI pipe. |
| 7 | Extra FOR treatment of soil by using salt & charcoal or coke FORplate electrode |
| 8 | SCHEDULE OF RATES FOR EARTHING INSTALLATIONS.SoilExcavation.Excavation of soil FOR installation of Earth Electrodeand filling & ramming.FOR Morrum Soil. |
| 9 | S/F fabricating, welding, G.I. junction and 2.1 M long double armprojected bracket made of 2\\" dia G.I. pipe (ISI medium) with 2 nos.thro... bolts & nuts of 175 mm(7\\") long 15.6 mm (5/8\\") dia junctionwith set screw etc. complete as per per direction ofEngineer-In-Charge. |
| 10 | S/F arm bracket of 50 mm bore tubular Pipe (M.S.) of 1. 5 m (5')length for fixing on 75/100 mm pole top including S/F 4 mm thickM.S. plate welded with bolts, nuts & clamps, etc. as required withfabrication work |
| 11 | Supplying Al.conductor PVC insulated and sheathed unarmoredcable (1.1KVgrade, Gloster/Havells/Polycab).10sqmm x 4core |
| 12 | Supply and drawing of 7/14 SWG galvanised stranded wire for drawing unarmored cable (supply of cable is not included in the scope) by catenary system of wiring with 3nos. reel insulator per mtr. and binding with binding wires etc,as reqd. for drawing |
| 13 | Erection of Galv. (HOT Dip) Cross arms/ `D... IronClamp7).Supplying & Erection of Galv. `D... iron complete withsuitable pole clamp 75mmx88mm porcelain shackle insulator & 15mm dia Galv. bolts & nuts. incl. painting |
| 14 | SCHEDULE OF RATES FOR OVERHEAD LINE INSTALLATION -REPAIR 5. Replacing Galv. (Hot Dip) MS earth clamp 380x25x3 mmsize complete with bolts and nuts etc. as required on pole (as perspecification) FOR fastening earth wire incl. painting |
| 15 | A N N E X U R E - I Basic Rate of Materials: (All Rates of materialsfrom K-1 to K-14 are excluding VAT) 145. Galv. Straining screw12\\"x5/8\\" dia |
| 16 | S/F of special head type M S loop box (3 mm thick) with connecting bar and other accessories fixed on the top the pole as required and as per direction of Engineer-In-Charge. For 3 phase connection. |
| 17 | Supplying and Drawing 1.1 KV single core stranded 'FR' PVCinsulated & unsheathed single core stranded copper wire(Brand(approved by EIC) of the following sizes in the prelaidpolythene pipe and by the prelaid GI fish wire and making necy.connection as required 3 x 22/0.3 (1.5 sqmm) |
| 18 | Fixing only Floodlight fittings on top of masonary structure by 3 Nos. 10 mm dia x 87 mm long rag bolts, nuts & double washers complete either 37 mm x 10 mm MS flat support/or by other means as required |
| 19 | Supply and Fixing of 2 mm Polyvinyl glow sign board made of 22SWG GI sheet box with 1...X1... aluminum channel for fixing the vinyl board after necessary cutting the letter as required & s\f LED tube light fittings along with all accessories |
| 20 | SUPPLY AND DELIVERY OF 200 WATT LED FLOOD LIGHTFITTINGS OF ANY SUPERIOR MAKE AS PER KMC LAST STOREPURCHASE RATE WITH 5(FIVE) YEARS WARRANTY FROMORIGINAL EQUIPMENT MANUFACTURER |
| 21 | Sub Total |
| 22 | GST 18% |
| 23 | CESS 1% Please Enable Macros to View BoQ information |