| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Mr. B.Ghosal, DGM (NCM) (L&W) GRSE Name of Work: :- NG CMS for NGC (03 built by GRSE, 02 ships built by GRSE's Partner shipyard and 03 by GSL) E-Tender No. NCM/BG/ST/NG CMS/NGC/ET-3417 Date-10.09.2026 Name of the Bidder/ Bidding Firm / Company : PRICE BID : ANNEXURE C(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender.)a) Simulator is required for 1 ships of GRSE and 01 ship of GSL i.e for 08 ships requirement of simulator is 02 sets (b) For 1st ship of GRSE and 01st ship of GSL , the required quantity of documentation is 03 sets per shipyard and for balance 06 ships the required quantity is 01 sets per ship , i.e for 08 ships , total quantity of documentation is 12 Nos. (c) Bidder has to quote as per system requirement as per SOTR/PRE BID MEETING/MOM of TNC as a complete package. (d) Inspection: As per SOTR NO. Prices quoted are inclusive inspection charges for Drawing Approval/ QAP approval /Type Test/FAT/In-process Inspection/On board Inspection wherever applicable as per SOTR requirement.( e)Bidder has to quote for warrantee extension charges, reduction for delivery preponement and charges for delivery postponement in % in price bid . This is optional part which will not be ordered at present but will be applied , if required in future. Price should not be mentioned in anywhere other than price bid. NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Material Description- details Material Code Qty Required for 08 ships UOM Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency Unit rate per ship without GST GST % GST Amount in INR Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies HSN / SAC Code * Name of Supply State / UT DRGS NO. Name of Supply State / UT Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category HSN/ SAC Code * Name of Supply State / UT Total price for 08 ships without GST Total price for 08 ship with GST TOTAL AMOUNT In Words |
| 2 | NGC_NGCMS_MAIN EQUIPMENT COMPRISING OF FOLLOWING:(A) MULTI-FUNCTION CONSOLE (MFC), QTY-08 SETS.(B) CENTRAL COMPUTING UNIT (CCU), QTY-02 SETS.(C) VERTICAL WALL DISPLAY (VWD), QTY-03 SETS.(D) CONTROL UNIT FOR VWD (CUWD), QTY-03 SETS.(E) CO CHAIR WITH CENTRAL MFC WITH PROVISION TO ROTATE AND SLIDE HORIZONTALLY, QTY-01 SET.(F) OPERATOR CHAIR FOR ALL MFC WITH 360 DEGREE ROTATION/HORIZONTAL/ VERTICAL SEAT ADJUSTMENT AND WITH FORWARD/BACKWARD MOVEMENT ON DECK FIXED RAILS, QTY-07 SETS.(G) POWER ON CONTROL MODULE (POCM), QTY-01 SET.(H) ISOLATION TRANSFORMER, QTY-02 SETS.(I) UPS WITH BATTERY BANK, QTY-02 SETS.(J) VIDEO DISTRIBUTION UNIT, QTY-01 SET.(K) NETWORK PRINTER, QTY-01 SET.(L) NETWORK ATTACHED STORAGE (NAS) & PROCESSING UNIT, QTY-01 SET.(M) VETO UNIT, QTY-01 SET.(N) AUTOMATIC TRANSFER SWITCH (ATS) ALONG WITH ASSOCIATED DISTRIBUTION PANEL, QTY-01 SET |
| 3 | NGC_NGCMS_CABLES |
| 4 | NGC_NGCMS_INSTALLATION MATERIALS |
| 5 | NGC_NGCMS_MOCK UPS |
| 6 | NGC_NGCMS_SIMULATOR |
| 7 | NGC_NGCMS_ON BOARD SPARES |
| 8 | NGC_NGCMS_SPECIAL TOOLS & TEST EQUIPMENT |
| 9 | NGC_NGCMS_TESTING & TUNING SPARES |
| 10 | NGC_NGCMS_INSTALLATION & COMMISSIONING SPARES |
| 11 | NGC_NGCMS_DOCUMENTATION HARD COPY |
| 12 | NGC_NGCMS_DOCUMENTATION SOFT COPY IN CD |
| 13 | NGC_NGCMS_INTERACTIVE ELECTRONIC TECHNICAL MANUAL (IETM) IN PORTABLE MEDIA |
| 14 | NGC_NGCMS_SUBMISSION OF BINDING DATA AND DRAWINGS TO GRSE FOR FIRST SHIP AND ALSO APPLICABLE FOR ALL 04 NOS. SUBSEQUENT SHIPS OF NGC. |
| 15 | NGC_NGCMS_SUBMISSION OF QAP TO DQA(N) FOR FIRST SHIP AND ALSO APPLICABLE FOR ALL SUBSEQUENT SHIPS OF NGC. |
| 16 | NGC_NGCMS_DESIGN REVIEW COMPRISING OF FOLLOWING (NOT LIMITED TO):(FOR FIRST SHIP AND ALSO APPLICABLE FOR ALL 04 NOS. SUBSEQUENT SHIPS OF NGC.)(A) FINALIZATION OF EQUIPMENT GA (DIMENSIONS, CG, WEIGHT, CABLE/PIPE ENTRY POINT, FOOTPRINT, VENTILATION PORT, DOOR OPENING, OPERATIONAL/MAINTENANCE ENVELOPE, ALIGNMENT & TOLERANCE REQUIREMENT ETC.)(B) FINALIZATION OF SYSTEM CONFIGURATION, BOM ETC.(C) FINALIZATION OF SYSTEM CABLING (CABLE DIAGRAM, CABLE SPECIFICATION, TERMINAL CONNCTION DETAILS ETC.)(D) SHIP SERVICE REQUIREMENT,HEAT DISSIPATION, POWER SUPPLY & CONSUMPTION FINALIZATION.(E) COMPARTMENT LAYOUT FINALIZATION W.R.T SYSTEM EQUIPMENT ONLY.(F) OTHER, IF ANY. |
| 17 | NGC_IAC_TECHNICAL ASSITANCE/TRAINING |
| 18 | Reduction for pre-ponement of delivery per annum basis in % |
| 19 | Charges for delivery postponement per annum basis in % |
| 20 | Charges for warranty extension per annum basis in % Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only ANNEXURE-A-0 (PRICE BID - List of Deliverables for Main Equipment) ITEM: NG CMS for NGC(03 built by GRSE, 02 ships built by GRSE's Partner shipyard and 03 by GSL) NAME & ADDRESS OF THE BIDDER WITH REFERENCE NO./DATE* Sl. No. Part No. Material Description Qty Required per ship Qty Required for 08 ships UOM Unit rate per ship without GST Total price per ship without GST Total price for 08 ships without GST GST % Total price for 01 ship with GST Total price for 08 ship with GST |
| 21 | Total 0.0 0.0 0.0 0.0 0.0 ANNEXURE-A-1 (PRICE BID - List of Deliverables for Cables ) ITEM: NG CMS for NGC(03 built by GRSE, 02 ships built by GRSE's Partner shipyard and 03 by GSL) NAME & ADDRESS OF THE BIDDER WITH REFERENCE NO./DATE* Sl. No. Yard No. BEL Part No. Material Description Qty Required per ship Qty Required for 08 ships UOM Unit rate per ship without GST Total price per ship without GST Total price for 08 ships without GST GST % Total price for 01 ship with GST Total price for 08 ship with GST |
| 22 | Total ANNEXURE-A-2 (PRICE BID - OBS Break-up) ITEM: NG CMS for NGC(03 built by GRSE, 02 ships built by GRSE's Partner shipyard and 03 by GSL) NAME & ADDRESS OF THE BIDDER WITH REFERENCE NO./DATE* Sl. No. Item Part No./ Model No./ Sl. No. Item Description Qty Required per ship Qty Required for 08 ships UOM Unit rate per ship without GST Total price per ship without GST Total price for 08 ships without GST GST % Total price for 01 ship with GST Total price for 08 ship with GST |
| 23 | Total 0.0 0.0 0.0 0.0 0.0 * VED - VITAL / ESSENTIAL / DESIRABLE analysis of spares to be carried out by OEM prior to submission to the BUYER.Notes:- 1. Data regarding maintenance spares / stores like lubricants, sealing compound, gases should be given separately giving source of supply.2. Data furnished as OBS should also include software backups, as applicable.3. In 'Remarks' column following information (if applicable) be given: (a) If an item has a shelf/operational life it be marked as 'G' and life indicated (b) Matching set of components be indicated ANNEXURE-A-3 ( PRICE BID -STE &SMT) ITEM: NG CMS for NGC(03 built by GRSE, 02 ships built by GRSE's Partner shipyard and 03 by GSL) NAME & ADDRESS OF THE BIDDER WITH REFERENCE NO./DATE* Sl. No. Material Description Qty Required per ship Qty Required for 08 ships UOM Unit rate per ship without GST Total price per ship without GST Total price for 08 ships without GST GST % Total price for 01 ship with GST Total price for 08 ship with GST |
| 24 | Total Please Enable Macros to View BoQ information |