| 1 | Digging earth in any soil including mixed soil but excluding moorum, laterite sand stone or any other hard stone including spreading or stacking the spoils within a lead of 75 metres as directed bailing out water upto 1 metre depth, shoring etc., when and if required and back filling with fine sand ( including cost of sand) on completion of steining works i) 2.4 metre diameter of digging for 1.5 metre internal diameter of well. a) upto 3.0 m. below G.L. add 5% extra for mooram. |
| 2 | Digging earth in any soil including mixed soil but excluding moorum, laterite sand stone or any other hard stone including spreading or stacking the spoils within a lead of 75 metres as directed bailing out water upto 1 metre depth, shoring etc., when and if required and back filling with fine sand ( including cost of sand) on completion of steining works i) 2.4 metre diameter of digging for 1.5 metre internal diameter of well. b) beyond 3.0 m.upto 6.0 m. below add 100% extra for laterite rock or sand stone cutting |
| 3 | Digging earth in any soil including mixed soil but excluding moorum, laterite sand stone or any other hard stone including spreading or stacking the spoils within a lead of 75 metres as directed bailing out water upto 1 metre depth, shoring etc., when and if required and back filling with fine sand ( including cost of sand) on completion of steining works i) 2.4 metre diameter of digging for 1.5 metre internal diameter of well. c) beyond 6.0 m.upto 9.0 m. below add 100% extra for laterite rock or sand stone cutting |
| 4 | Digging earth in any soil including mixed soil but excluding moorum, laterite sand stone or any other hard stone including spreading or stacking the spoils within a lead of 75 metres as directed bailing out water upto 1 metre depth, shoring etc., when and if required and back filling with fine sand ( including cost of sand) on completion of steining works i) 2.4 metre diameter of digging for 1.5 metre internal diameter of well. d) beyond 9.0 m.upto 12 m. below add 100% extra for laterite rock or sand stone cutting |
| 5 | Digging earth in any soil including mixed soil but excluding moorum, laterite sand stone or any other hard stone including spreading or stacking the spoils within a lead of 75 metres as directed bailing out water upto 1 metre depth, shoring etc., when and if required and back filling with fine sand ( including cost of sand) on completion of steining works i) 2.4 metre diameter of digging for 1.5 metre internal diameter of well. e) Beyond 12 metre upto 15 metre below G.L. add 100% extra for laterite rock or sand stone cutting |
| 6 | Earth work in excavation of foundation trenches in all sorts of soil, including removing spreading or stacking the spoils within a lead of 7.5 m. as directed and including trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing or pumping out water as required complete. |
| 7 | Sand filling in foundation or plinth in layers not exceeding 15cm. as directed and consolidating same by thorough saturation with water and ramming complete, including the cost of supply of sand. |
| 8 | Single Brick Flat soling of Picked Jhamma Bricks including ramming and dressing bed to proper level and filling joints with local sand including cost of sand. |
| 9 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) |
| 10 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works |
| 11 | Reinforcement (for Reinforced concrete work) including distribution bars, stirrups, binders etc., including supply of rods, straightening bend and half round bars of any dia., removal of loose rust, cutting to requisite length, hooking and binding with 1.626 mm black annealed binding wire at every intersection complete including cost of wire. |
| 12 | Reinforced cement Concrete (Proportion 3:1.5:1), with approved trap stone chips, for structural concrete excluding shuttering and reinforcement, if any. |
| 13 | 1st class brick work for steining wall of well in cement morter 1 :4 below G.L. including cuttng bricks if required. a) 0 metre to 6 metre depth. |
| 14 | 1st class brick work for steining wall of well in cement morter 1 :4 below G.L. including cuttng bricks if required. b) above 6 metre to 9 metre depth. |
| 15 | 1st class brick work for steining wall of well in cement morter 1 :4 below G.L. including cuttng bricks if required. c) above 9 metre to 12 metre depth. |
| 16 | 1st class brick work for steining wall of well in cement morter 1 :4 below G.L. including cuttng bricks if required. d) above 12 metre to 15 metre depth. |
| 17 | Brickwork in cement mortar (prop. 6:1) including cost of scaffolding and other incidental works etc. complete, in superstructure ground floor. |
| 18 | 125 mm thick brick workwith 1st class bricks in cement mortar (4:1) in ground floor |
| 19 | Plaster (i) With 1:6 cement mortar (c) 15 mm thick plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/ staging where necessary (Groundfloor). [Excludingcost of chipping over concrete surface] |
| 20 | Neat cement punning about 1.5 mm thick in wall, dado, window sill, floor etc. NOTE: Cement 0.152 cu.m. per100 sq.m. |
| 21 | 25mm. Thick Grey Artificial Stone Flooring with graded stone chips in floor, Dado, Staircase etc. with cement concrete 4:2:1 laid in panels as directed, with 3.25 mm. Neat cement finishing at top and including rounding of corners and preparation of bed |
| 22 | 25 mm dia. M.S. plain round bar for lifting of water bucket. |
| 23 | Supplying, fitting & fixing of in position 15mm C.I. Pully. |
| 24 | Supplying P.V.C. water storage tank of approved quality with closed top with lid (Black) - Multilayer (b) 1000 litre capacity |
| 25 | Labour for hoisting plastic water storage tank. (i) Upto 1500 litre capacity. (a) Upto 1st story from G.L. |
| 26 | Labour for punching hole in plastic water storage tank upto 50 mm dia. |
| 27 | Supplying, fitting and fixing CPVC (Chlorinated Polyvinyl Chloride) pipes of approved make conforming to IS-15778: 2007 . with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. (a) For Exposed Work (ii) CPVC Pipes Class-2,SDR-13.5, 15 mm |
| 28 | Supplying, fitting and fixing CPVC (Chlorinated Polyvinyl Chloride) pipes of approved make conforming to IS-15778: 2007 . with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. (a) For Exposed Work (ii) CPVC Pipes Class-2,SDR-13.5, 25 mm |
| 29 | Supplying, fitting and fixing bib cock |
| 30 | Supplying, fitting and fixing valve |
| 31 | Supplying and fitting fixing of submersible Pump |
| 32 | Supplying, fitting & fixing eletrification work |
| 33 | Miscellaneous cost for site clearance before and after work, dewatering during work and clearance of bottom of well after work & disinfecting using bleaching etc. twice |
| 34 | Cost of barricade etc. during execution of work. |
| 35 | Display board writing & Photo (3 phase). |
| 36 | Add CGST @ 9.00% of Total Cost |
| 37 | Add SGST @ 9.00% of Total Cost |
| 38 | Labour welfare cess @ 1.00% |
| 39 | Add Contigency Please Enable Macros to View BoQ information |