|
| 1 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. |
| 2 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 3 | Earth work in excavation of all kinds of soil by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for lift upto 1.5m, as directed by Engineer-incharge. |
| 4 | Disposal of excavated excess earth from the site including conveyance of materials up to an average lead of 1KM away from the site, and correspondiong required lift, loading, unloading etc complete as directed by the EIC. (The quantity is net quantity of capacity of truck after deduction of 20% for looseness) By mechanical transport including loading, unloading and stacking. (Lead upto 1KM away from the site) |
| 5 | Providing and laying in position cement concrete of specified grade, work up to plinth level : PCC 1:4:8 (1 cement, 4 coarse Sand(Zone-III) derived from natural sources: 8 graded stone aggregate 40mm nominal size derived from natural sources) including curing levelling, etc., as directed by EIC |
| 6 | Providing and laying Concrete of M25 grade (with minimum cement content of 330 kg /cum) in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, OPC, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement etc complete as directed by EIC |
| 7 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete as directed by EIC. (The cost includes providing gas cutting including gas bottles, welding machines, welding rods , all tools required is in the scope of contractor),Make: VSP/TATA/JINDAL (JSW). Material test reports to be submitted for the material brought to site |
| 8 | Labour charges for structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. The cost includes providing gas cutting including gas bottles, welding machines, welding rods , all tools required is in the scope of contractor. |
| 9 | Providing & Painting synthetic enamel paint with two or more coats including one coat primer and surface preparation on MS door etc. Please Enable Macros to View BoQ information |