|
| 1 | Snow clearance by Mechanical Means using Machines as specified or equivalent |
| 2 | Snow Plough 180 HP (Ashoka Leyland Stallion-2009) |
| 3 | Snow Plough 4 WD 170-180 BHP (Unimog) |
| 4 | Snow Plough 4 WD 90 BHP (Trucks) |
| 5 | Snow Plough 4 WD 60 BHP (Trucks) |
| 6 | Snow Plough 4 WD 160 BHP (Trucks) |
| 7 | Snow cutter Rolba 1500 |
| 8 | Snow cutter Rolba 3000 |
| 9 | Snow cat |
| 10 | Snow Blower 4 WD 690 BHP 8500 T/Hr (Fresia Spa) |
| 11 | Snow Blower 4 WD 420-430 BHP 3500 T/Hr (Supra 4001) |
| 12 | Snow Blower 4 WD 570 BHP 5300 T/Hr (Supra 3000) |
| 13 | Snow Blower 4 WD 420 BHP 3500 T/Hr (Rolba 1500) |
| 14 | Slip Clearance |
| 15 | In ordinary soils disposal lead up to 50m and lift up to 1.5m |
| 16 | In soils mixed with moorum/Kankar/shingle boulders; disposal lead up to 50m and lift up to 1.5m |
| 17 | In soils mixed with Decomposed Rocks; by blasting or any other means |
| 18 | In medium hard rocks ; by blasting |
| 19 | In hard rocks; by blasting |
| 20 | Allied works |
| 21 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches forfoundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sidesand ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of soil |
| 22 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns |
| 23 | Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, walls (any thickness) including attached pilastersbuttresses, plinth and string course fillets, kerbs andsteps etc. |
| 24 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) including all leads ,lifts,loading , unloading ,carriages etc |
| 25 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including all leads ,lifts,loading , unloading ,carriages etc |
| 26 | Polygonal /Random Rubble Masonry ,uncoursed brought to courses laid dry with nallah stone in foundation & plinth excluding cost of Through /Bond Stones including all leads ,lifts,loading , unloading ,carriages etc |
| 27 | Random Rubble Masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 Coarse Sand : 12 Graded Stone Aggregate 20 mm nominal size) up to plinth level and curing complete with:Cement Mortar 1:6 (1 Cement : 6 Coarse Sand) including all leads ,lifts,loading , unloading ,carriages etc |
| 28 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in theproportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc.complete. including all leads ,lifts,loading , unloading ,carriages etc |
| 29 | 600 mm dia. R.C.C. pipe |
| 30 | 1000 mm dia. R.C.C. pipe (laying by manual/mechanicalmeans) |
| 31 | Filling behind walls including ramming etc ( including cost of stones) including all leads ,lifts,loading , unloading ,carriages etc |
| 32 | Filling behind walls including ramming etc ( excluding cost of stones) |
| 33 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire Mesh Gabion Boxes as per IS 16014:2012, MORTH Clause 2500, of required size, Mesh Type 10x12 (D = 100 mm with tolerance of ± 2%), Zinc Coated, Mesh Wire Diameter 3.0 mm, mechanically edged/selvedged with partitions at every 1 m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2 mm, supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in-Charge. |
| 34 | Carriage of Mulba / Earth at an average distance of 01 Km by MT Please Enable Macros to View BoQ information |