| 1 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth. |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of soil |
| 3 | Providing & Laying of stone soling (dully hand packed) including watering dressing, ramming with iron rammer, all lead lifts, loading un-loading and all carriages etc complete |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 5 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. |
| 7 | Providing and laying of Khak bajri/Nallah boulders as filter media behind R wall etc including spreading, watering, ramming, incl proper consolidation and all other carraiges complete job. |
| 8 | Providing and fixing of 75mm dia PVC pipes for weep holes all complete. |
| 9 | 12mm Cement plaster of mix 1 : 4 ( 1 cement : 4 fine sand) |
| 10 | Carriage of materials from source to site of work including loading unloading complete. |
| 11 | Stone Agg above 40mm for an avg. lead of 27 Km |
| 12 | Stone Agg below 40mm for an avg. lead of 27 Km |
| 13 | sand for an avg. lead of 24 Km Please Enable Macros to View BoQ information |