|
| 1 | SUPPLY OF VARIOUS SPARES |
| 2 | 09 KG DCP EXTINGUISHER |
| 3 | Discharge hose with squeeze grip , hose should not burst or show leakage before 50Kgf/cm2 |
| 4 | DCP extinguisher cap washer |
| 5 | 25/75 KG DCP EXTINGUISHER |
| 6 | Discharge hose with clamps(1.5mtr length). Hose should not burst or show leakage before a pressure of 50Kgf/cm2. |
| 7 | Brass connection tube between CO2 cylinder & DCP cylinder with washer. |
| 8 | Cap washer |
| 9 | Safety valve of 25/75 kg DCP extingusher |
| 10 | CO2 EXTINGUISHERS |
| 11 | HDPE discharge horn for 2Kg CO2 extinguisher along with bend pipe fitting complete in all respect as per direction of EIC. |
| 12 | HDPE discarge horn for 4.5/6.8Kg capacity CO2 extinguishers with fittings as per direction of EIC. |
| 13 | High pressure discharge hose for 4.5/6.8Kg CO2 extinguisher with fittings as per direction of EIC. |
| 14 | Handle for 2Kg/4.5Kg extinguisher |
| 15 | Safety pin with nylon string for CO2 extinguisher & DCP extinguisher |
| 16 | Supply & fitting plastic safety pin holder in CO2 extinguisher. |
| 17 | FIRE HYDRANT VALVE |
| 18 | Supply and installation of lugs for hydrant landing valve |
| 19 | Supply & fitting fire hydrant disc washer as per direction of EIC. |
| 20 | Fire hydrant/ fire hose coupling washer (O ring) |
| 21 | Supply of brass lock for monitor |
| 22 | Supply of drain valve of Monitor SS 1/2\\" |
| 23 | Supply of PVC blank cap with chain for male and female 63 mm coupling |
| 24 | Miscellaneous Supply |
| 25 | Supply of F key made from 8 mm size (MS rod with priming/painting) as per sample |
| 26 | Supply of F key made from 12 mm size (MS rod with priming/painting) as per sample |
| 27 | Supply of Hose box FRP body capable for containg two hoses of 15 m length as per sample and specs directed by EIC |
| 28 | Supply of GI stud bolt of required sizes |
| 29 | CAP ASSEMBLY 9.0 KG DCP EXT 9KG IS:15683. Cap Valve Assembly for 9 KG DCP Fire Extinguisher (conforming to IS:15683) having Fire Rating 34B. Cap Valve Assembly shall be of SS-316 material. |
| 30 | Siphon Tube outlet for DCP flow in 9 KG DCP Fire Extinguisher (conforming to IS:15683) having Fire Rating 34B. Siphon Tube for DCP flow shall be of SS-316 material. |
| 31 | Siphon Tube inlet for CO2 flow in 9 KG DCP Fire Extinguisher (conforming to IS:15683) Siphon Tube for CO2 flow shall be of SS-316 material. |
| 32 | FIRE FIGHTING EQUIPMENT: Supply and delivery of Fire Fighting Equipment at station as per technical specifications specified in tender document. |
| 33 | 9 kg DCP extinguisher |
| 34 | 4.5 kg CO2 extinguisher |
| 35 | 2 kg CO2 extinguisher |
| 36 | 2 kg clean agent extinguishers IS 15683 |
| 37 | Type B Delivery Hoses of 15 M length bea |
| 38 | Jet Nozzles |
| 39 | Fog Nozzle |
| 40 | Universal Nozzle |
| 41 | Water curtain nozzle |
| 42 | PA system/ Loudhailer/ megaphone |
| 43 | Sand drum with scoop |
| 44 | Low Temperature rubber Gloves |
| 45 | Pair of Rubber hand gloves for Electrica |
| 46 | First Aid Box with Snake serum |
| 47 | Safety Helmet |
| 48 | Strecher WITH BLANKET |
| 49 | Rescuscitor |
| 50 | Hand Operated siren |
| 51 | Water gel blanket |
| 52 | Positive Pressure type self containing B |
| 53 | Safety Torch |
| 54 | Fire Proximity Suit |
| 55 | Red & Green flag (Pairs) 2 nos in each colour |
| 56 | Dry Chemical Powder silliconised potassiun bicarbonate type IS marked, pack in 10Kg |
| 57 | Wind Shock |
| 58 | CO2 cartridge - 3.2 kg capacity for 75 kg DCP extinguisher |
| 59 | Service part |
| 60 | Hose box repair work |
| 61 | Supply & fitting of rubber beeding of one hose box (both doors) including removing of worn out rubber beeding, labour charges, tools & tackles etc. as per direction of EIC/SE |
| 62 | Collection of hose box from the station area to work site, repair work like glass/acrylic changing ,SS hinge, adopter, nut- bolts, rubber beeding fitting by hand drilling etc complete in all respect and reinstallation of hose box on base support by using fastener support as per direction of EIC/SE |
| 63 | Painting and numbering of hose box \\"yellow shed\\" as per IS 5, paint shall be corrosive resistant shall conform to IS-2932 including all tools, tackles, materials as per direction of EIC/SE. |
| 64 | Fabrication and installation of stand of hose boxes using the pipes, channel, angle etc. excavation and grouting the stand in under the ground by suitable PCC mixture, or making civil structure using the brick, plastering etc. painting of structure etc. complete the work in all respect including all tools tackles, labour, etc as per directions of EIC/SE |
| 65 | Repair ,maintenace,testing of CO2 & DCP |
| 66 | Supply & fitting of clamps for hanging 2Kg / 4.5Kg CO2 extinguisher on wall including labour charges, tools tackles & consumables complete in all respect as per direction of EIC/SE. |
| 67 | Hydrostatic testing, inspection of safety valve, changing of rupture disc, and refilling of high pressure cylinder through PESO approved party and charging upto required pressure (210 kg/cm2) including taking delivery of the cylinder from the station and returning the same inclusive of all labour material, transportation and all the other incidental expenses). The cylinder is to be returned back to the station within 15 days from the date of receiving from the station. (For 2Kg /4.5 kg CO2 cyl.) |
| 68 | Hydrostatic testing of DCP extinguishers of capacity (5/9/25/50/75 Kg.) and CA extinguisher (2kg) at 30kg/cm2 pressure, inspection of safety valve (wherever required) by emptying out powder/gas, carrying out hydrostatic testing, drying & refilling the extinguisher and providing operating instruction stickers and returning the same inclusive of all labour material, transportation and all the other incidental expenses). The testing to be carried out in the station only. |
| 69 | Refilling of CO2 gas in cartridges for using in DCP extinguishers including all labour, transportation etc.. complete as per specification and direction of EIC/Site-Engineer. (CO2 Cartridge of 150-200 gms) |
| 70 | Painting of CO2 extingushers(4.5kg/2kg) and DCP extinguishers(9/75 kg) and clean agent extinguishers(2kg). The extinguisher shall be painted fire red conforming to shade No.536 of IS-5. The paint shall conform to IS-2932 & providing operation method stickers as per type of extinguishers. |
| 71 | Hydrant landing valve maintenace work |
| 72 | Dismantaling of landing valves of fire hydrant line cleaning the spindle and refixing it with new gasket alongwith all tools tackles material, man power etc as per direction of EIC/SE |
| 73 | Supply and fitting of hydrant valve wheel of cast iron along with check nut complete in all respect as per sample, instruction and direction of EIC |
| 74 | Painting and numbering of hydrant post ,fire red paint shed 536 as per IS :5 |
| 75 | Fabrication ,supply and installation of 4\\" hydrant post as per the sample including all tools tackles, labour, etc as per directions of EIC/SE (All pipes and fitting will be supplied by IOCL) |
| 76 | Dismantaling of landing valves of fire hydrant line, changing the disc and disc washer provided inside the hydrant landing valve,leak testing and refixing it with new gasket alongwith all tools tackles material, man power etc as per direction of EIC/SE |
| 77 | Checking, inspection, servicing, maintenance, greasing, cleaning, oiling etc. of valve HOV/MOV of fire water line) alongwith all tools, tackles, manpower, material as per direction of EIC/SIC etc.(grease/gear oil will be provided by IOCL) (monthly basis) |
| 78 | Double headed hydrant valves (work include the operating platefarm cleaning if required) |
| 79 | Fire monitors (work include the operating platefarm cleaning if required) |
| 80 | 4\\" valves |
| 81 | 10\\"/12\\" valves |
| 82 | Leakage arresting by supply and Changing |
| 83 | 4\\" valves |
| 84 | 10\\"/12\\" valves |
| 85 | Miscellaneous activities and Maintenace |
| 86 | Fitting of new wind sock and frame rectification if required , removing of old wind sock in tank , buildings, upto height of 20 M,greasing of bearing of stand as per direction of site engineer/ EIC. |
| 87 | House keeping:,cleaning of FF store room, ML store room, PPE rack, CO2 flooding system, FM200 system etc at station area and making it strain free including all tool, tackles, labours etc as per direction of EIC/SIC (monthly basis) |
| 88 | Inspection,testing and maintenance of eye shower,greasing of all moving points and valve, cleaning of platform and other required rectification work including labour charges, tools tackles & consumables complete in all respect as per direction of EIC.(monthly) |
| 89 | Checking, inspection, testing, servicing, maintenance, greasing of hand operated siren complete in all respect as per direction of EIC/SE(quarterly) |
| 90 | Painting on metal surfaces & surface pre |
| 91 | Application of One coat of high build, self priming, rust encapsulating polyamidoamine cured epoxy mastic coating (80 % solid by volume) to a dry film thickness of 100 microns by AIRLESS SPRAY followed by one coat of Epoxy MIO (80% solid by volume) with minimum 100 microns DFT by AIRLESS SPRAY , followed by two coats of isocyanate acrylic aliphatic PU coat (50% solid by vol.) with each coat minimum 50 microns DFT by AIRLESS SPRAY on the surface and on all its associated structures. Whereever spray application is difficult , brush application can be used with approved materials, paints,brushes, labour, equipment etc. and completing the job in all respects as per specification and instructions of the Site Engineer / EIC. |
| 92 | Surface preparation using hand /Power tool cleaning with non-sparking tools and solvent cleaning including removal of oil, grease and other contaminants removal of loose or defective paint, loose mill scale, loose rust, weld flux and slag from the metallic surfaces, by hand chipping, scrapping, hand brushing, using chipping hammers, hand scrappers/chisels, coire brushes, sand paper, steel wools etc. in all respect as per the specifications, and directions of EIC / Site E ngineer. |
| 93 | Testing and inspection of CO2 and DCP extinguisher on every month basis including pastings,marking, of maintenance date, cleaning, and replacement of defective parts (supplied by IOCL), measuring weight including labour, greasing, testing, all as per instruction of EIC with all tools and tackle. Also submit a report in approved format. |
| 94 | For 10/9Kg DCP extinguisher |
| 95 | For 25/75Kg DCP extinguisher |
| 96 | for 2Kg Co2 and 2kg CA extinguisher |
| 97 | for 4.5Kg Co2 extinguisher |
| 98 | Inspection and Refilling of clean agent media in extinguishers of capacity 2 Kgincluding transportation, labour within 15 days of intimation completein all respect |
| 99 | Hydrotesting of Type B delievey hoses of 15M length bearing IS- 636 Mark as per code and instruction of EIC/SIC. |
| 100 | Calibrations work & generation of report |
| 101 | Calibrations of LEL meter (Multigas Dete |
| 102 | Replacement of Oxygen sensor |
| 103 | Examination, testing and certification of 10 T Hand Operated Travelling Crane (HOT) as per IS 807. (As per section 28, 29 and 31 of factory act, 1948 though factories accredited vendor) |
| 104 | Examination, testing and certification of 5 T Chain pulley as per IS 807. (As per section 28, 29 and 31 of factory act, 1948 though factories accredited vendor |
| 105 | Examination, testing and certification of 1 T chain pulley as per IS 807. (As per section 28, 29 and 31 of factory act, 1948 though factories accredited vendor) |
| 106 | Environment Monitoring |
| 107 | Ambient Air quality testing and certific |
| 108 | Stack Gas emission testing and certifica |
| 109 | Noise (Sound) level monitoring and certi |
| 110 | Drinking water testing and certification |
| 111 | Muck Analysis |
| 112 | Muck analysis (as per instructions from EIC) and report of pH value;Water Content; Sulphide as S; loss on ignition at 8500C; Acid Insoluble; Iron as Fe2O3; Iron as Fe; Chloride as Cl, Silica as SiO2, Calcium as CaO, Magnesium as MgO, Anaerobic Bacteria test and as per additional instruction of EIC. |
| 113 | Writing of slogans (in Hindi, English,Or |
| 114 | Writing of slogans (in Hindi, English,Oriya) at all heights with approved paints and shade as per the direction of EIC, date changing on walls, numbering on hydrant valve ,post,direction marking etc as per instructions alongwith all tools, tackles, material etc. The rate covers back ground painting (application of 1 coat primer and 2 coat paint on the board/wall before writing) Please Enable Macros to View BoQ information |