Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | Total Quoted Amount (incl. GST) for: |
| 2 | Total Amount (Part A + Part B) (incl GST) |
| 3 | PART - A |
| 4 | Team: ( Total 3 shifts) |
| 5 | Decription : Providing support services for Preventive and Emergency/Breakdown services for PNG network including tools & tackles, consumables, inventory management of free issue material as defined in the scope of work of the tender document. This is inclusive of all materials as mentioned in Annexure 7 under bidders scope. For emergency/breakdown services and preventive maintenance of MDPE, LMC & Steel network included in this SOR scope. Per team includes - 01 Supervisor, 01 PE Technician, 01 Plumber, 02 Helpers (Supervisor will also be responsible for coordination of activities related to ) please refer clause 5.10 of Section-V for support services details. |
| 6 | Engineer In-Charge/Supervisor (Skilled) |
| 7 | PE Technician/Fusion Welder (Semi - skilled) |
| 8 | GI Technician/Plumber (Semi - Skilled) |
| 9 | Helper/Labor (Unskilled) |
| 10 | Supply of additional manpower (Plumber/PE Technician)Description: over and above / Team as and when required for Providing Emergency/Breakdown services of PNG network during emergency services, the manpower shall be arranged within 3 hours as instructed by EIC. Providing tools & tackles along with PPEs shall be in the scope of contractor. |
| 11 | Supply of Unskilled Labourers:Decription : Providing Un-skilled labourers for emergency, shut down and other misc. services. Contractor shall provide the labour within 3 hours at designated site directly. Providing tools & tackles along with PPEs shall be in the scope of contractor. |
| 12 | Supply of Electrician (Skilled):Decription : Providing skilled Electrician for Misc. services (Tools & tackles, PPEs shall be in the scope of contractor). |
| 13 | Provision for wage escalation due to revision in minimum wages as per Government of lndia Ministry of Labour & Employment Lodging facility of the Chief Labour Commissioner, New Delhi |
| 14 | Service Charges:The minimum service charges in the procurement of Support Services may be fixed as 3.85%. If Any bidder quote less than 3.85% , the bidder may rejected. The applicable range of service charges shall be (3.85% to 7.00%). Applicable for SOR line item 1.1 to 1.5. |
| 15 | PART-B |
| 16 | Lodging Facility: One Lodging facility required in GADecription : Bidder is required to arrange Lodging facility for its manpower with sufficient space to keep their manpower and materials. Lodging facility should be finalized to the satisfaction of EIC. Lodging facility shall be located at strategic location for round the clock monitoring of O&M activities. |
| 17 | Emergency Response Vehicle [ERV]: Two Vehicles required in GA.Decription: Deployment of Emergency Vehicle [4 Wheeler - Mahindra Bolero Camper / TATA Xenon Crew Cabin/ TATA Yodha OR Equivalent Model] (4 + 1 Seater) as per Branding & Necessary Modification (Internal & External) to perform O&M activity for round the clock (24 hr) including Fuel, Driver, Consumables etc. for average running of 1500 KMs per month. Same will be reconciled in every 3 months and the extra KM beyond 4500 kms can be claimed as per SOR no 2.103. Model shall be BS VI 2025 or latest having running KM not more than 9000 KM with necessary provision to store tools & tackles etc. as per instruction of EIC. Vehicle should be CNG fueled. Please refer clause no. 5.13.3 of Technical volume for detailed scope. |
| 18 | Extra running Kms for ERVDecription : Extra running Kms for ERV beyond quarterly fix Km i.e. 9000 Km/Quarter per Vehicle for SOR Item No. 2.102. |
| 19 | Running Kms for two wheeler vehicleDecription: Running kilometers for two-wheelers will be provided only for Helper/Labour when they are assigned for patrolling, as defined in the Scope of Work of the tender |
| 20 | Meter Reading, Bill Circulation for Domestic Connections: Charges for meter reading and bill circulation through dedicated personnel, rate includes supply of bluetooth thermal printers (SILCHAR GA) Decription : Bidder shall engage minimum 01 dedicated meter reader for 1500 NG |
| 21 | Below ground activities in Gasified/Charged network or in O&M area - Excavation, Installation / Laying, Testing, Purging & Commissioning of MP/ LP PE PipesDecription : Below ground activities in Gasified/Charged network or in O&M area - Excavation, Installation / Laying, Testing, Purging & Commissioning of MP/ LP PE Pipes including Electrofusion Welding, Padding and Bedding of PE pipes & PE Ball valves shall be supplied by Owner as free issue whereas EF fittings & warning tape shall be supplied by Bidder and all rates are inclusive of bidders scope materials including site restoration - 20 mm |
| 22 | Below ground activities in Gasified/Charged network or in O&M area - Excavation, Installation / Laying, Testing, Purging & Commissioning of MP/ LP PE PipesDecription : Below ground activities in Gasified/Charged network or in O&M area - Excavation, Installation / Laying, Testing, Purging & Commissioning of MP/ LP PE Pipes including Electrofusion Welding, Padding and Bedding of PE pipes & PE Ball valves shall be supplied by Owner as free issue whereas EF fittings & warning tape shall be supplied by Bidder and all rates are inclusive of bidders scope materials including site restoration - 32 mm |
| 23 | Below ground activities in Gasified/Charged network or in O&M area - Excavation, Installation / Laying, Testing, Purging & Commissioning of MP/ LP PE PipesDecription : Below ground activities in Gasified/Charged network or in O&M area - Excavation, Installation / Laying, Testing, Purging & Commissioning of MP/ LP PE Pipes including Electrofusion Welding, Padding and Bedding of PE pipes & PE Ball valves shall be supplied by Owner as free issue whereas EF fittings & warning tape shall be supplied by Bidder and all rates are inclusive of bidders scope materials including site restoration - 63 mm |
| 24 | Below ground activities in Gasified/Charged network or in O&M area - Excavation, Installation / Laying, Testing, Purging & Commissioning of MP/ LP PE PipesDecription : Below ground activities in Gasified/Charged network or in O&M area - Excavation, Installation / Laying, Testing, Purging & Commissioning of MP/ LP PE Pipes including Electrofusion Welding, Padding and Bedding of PE pipes & PE Ball valves shall be supplied by Owner as free issue whereas EF fittings & warning tape shall be supplied by Bidder and all rates are inclusive of bidders scope materials including site restoration - 90-125 mm |
| 25 | Below ground activities in Gasified/Charged network or in O&M area - Trenchless layingDecription : Below ground activities in Gasified/Charged network or in O&M area - Trenchless laying - Manual Boring including insertion of PE pipes, EF jointing, Testing and Commissionng as per owner specifications. PE pipes of sizes & PE Ball valves shall be supplied by Owner as free issue items whereas EF fittings & warning tape shall be supplied by Bidder and all rates are inclusive of bidders scope materials including site restoration - 20 mm |
| 26 | Below ground activities in Gasified/Charged network or in O&M area - Trenchless layingDecription : Below ground activities in Gasified/Charged network or in O&M area - Trenchless laying - Manual Boring including insertion of PE pipes, EF jointing, Testing and Commissionng as per owner specifications. PE pipes of sizes & PE Ball valves shall be supplied by Owner as free issue items whereas EF fittings & warning tape shall be supplied by Bidder and all rates are inclusive of bidders scope materials including site restoration - 32 mm |
| 27 | Below ground activities in Gasified/Charged network or in O&M area- Trenchless layingDecription : Below ground activities in Gasified/Charged network or in O&M area - Trenchless laying - Manual Boring including insertion of PE pipes, EF jointing, Testing and Commissionng as per owner specifications. PE pipes of sizes & PE Ball valves shall be supplied by Owner as free issue items whereas EF fittings & warning tape shall be supplied by Bidder and all rates are inclusive of bidders scope materials including site restoration - 63 mm |
| 28 | Below ground activities in Gasified/Charged network or in O&M area - Trenchless layingDecription : Below ground activities in Gasified/Charged network or in O&M area - Trenchless laying - Manual Boring including insertion of PE pipes, EF jointing, Testing and Commissionng as per owner specifications. PE pipes of sizes & PE Ball valves shall be supplied by Owner as free issue items whereas EF fittings & warning tape shall be supplied by Bidder and all rates are inclusive of bidders scope materials including site restoration - 90-125 mm |
| 29 | Below ground activities in Gasified/Charged network or in O&M area- MDPE Pipe Service Line layingDecription : Below ground activities in Gasified/Charged network or in O&M area - MDPE Pipe Service Line laying for providing Domestic, Industrial & Commercial connections in gasified area - For Pipe length upto 5 mtrs. (Laying beyond 5 mtrs length (if any) will be paid through SOR 2.106 to 2.113 for the respective diameter), Refer Section-V, clause no. 6.1.9 for detailed scope of work. |
| 30 | Below ground activities in Gasified/Charged network or in O&M area- Installation of Service Regulator ModuleDecription : Below ground activities in Gasified/Charged network or in O&M area - Installation of Service Regulator Module (Owners supplied SRM) including Supply of required material & Manpower, Transportation, Civil Works, Installation, Testing / Purging & Commissioning (EF Fittings shall be supplied by Bidder). All rates are inclusive of bidders scope materials. Anything left out shall be provided by bidder (Refer Annex 7 for biddder & owner scope material) - Installation of SR Module =< B50 |
| 31 | Below ground activities in Gasified/Charged network or in O&M area- Installation of Service Regulator ModuleDecription : Below ground activities in Gasified/Charged network or in O&M area - Installation of Service Regulator Module (Owners supplied SRM) including Supply of required material & Manpower, Transportation ,Civil Works, Installation, Testing / Purging & Commissioning ( EF Fittings shall be supplied by Bidder). All rates are inclusive of bidders scope materials. Anything left out shall be provided by bidder (Refer Annex 7 for biddder & owner scope material) - Installation of SR Module >B50 |
| 32 | Below ground activities in Gasified/Charged network or in O&M area- Installation of new PE Ball Valve(125mm to 32mm) and construction of RCC valve chamber and its coverDecription : Below ground activities in Gasified/Charged network or in O&M area - Installation of new PE Ball Valve and construction of RCC valve chamber and its cover (Scope includes white washing/ painting, pest control etc.) |
| 33 | Below ground activities in Gasified/Charged network or in O&M area- Disconnection of PE line on customer request. (PE Disconnection)Decription : Below ground activities in Gasified/Charged network or in O&M area - Disconnection of PE line on customer request. (PE Disconnection)-i.e. excavation, sqeezing of charged PE pipe, installatiion of Endcap / Plug on TF for stoppage of supply/removal of RCC guard, etc. as per instruction of EIC. The rates mentioned in this line item are inclusive of manpower charges. |
| 34 | Above ground activities in Gasified/Charged network or in O&M area - Supply, installation, Testing and Commissioning.Decription : Above ground activities in Gasified/Charged network or in O&M area - Supply, installation, Testing and Commissioning. This SOR is applicable for Alteration, Shifting, Removal, & Re-fitting of GI, LMC connection. GI Pipes/Copper Pipes, Meter, Regulators, isolation valves shall be supplied by Owner. All other required fittings and consumables are under Bidders scope. Applicable to alteration requirement/request. (Customer Visit Report Required). The rates mentioned in this line item are inclusive of manpower charges, AEO team & shall not be engaged in execution of these activites. Only Pipe removal/fitting would be paid as per this SORs for Alteration, Shifting, Removal, & Re-fitting of GI, LMC connections. All rates are inclusive of bidders scope of materials, charges for mobilization for domestic alteration/riser shifting work/Preparation of isometric drawing and necessary reports/services for making holes in brick wall/RCC structure, removal/refitting of meter assembly, colour touch up,at the time of alteration activity, etc. - Fitting of 1/2\\" GI Pipe through threaded joints including supply and fixing of GI fittings. |
| 35 | Above ground activities in Gasified/Charged network or in O&M area - Supply, installation, Testing and Commissioning.Decription : Above ground activities in Gasified/Charged network or in O&M area - Supply, installation, Testing and Commissioning. This SOR is applicable for Alteration, Shifting, Removal, & Re-fitting of GI, LMC connection. GI Pipes/Copper Pipes, Meter, Regulators, isolation valves shall be supplied by Owner. All other required fittings and consumables are under Bidders scope. Applicable to alteration requirement/request. (Customer Visit Report Required). The rates mentioned in this line item are inclusive of manpower charges, AEO team & shall not be engaged in execution of these activites. Only Pipe removal/fitting would be paid as per this SORs for Alteration, Shifting, Removal, & Re-fitting of GI, LMC connections. All rates are inclusive of bidders scope of materials, charges for mobilization for domestic alteration/riser shifting work/Preparation of isometric drawing and necessary reports/services for making holes in brick wall/RCC structure, removal/refitting of meter assembly, colour touch up,at the time of alteration activity, etc. - Fitting of 3/4\\" GI Pipe through threaded joints including supply and fixing of GI fittings. |
| 36 | Above ground activities in Gasified/Charged network or in O&M area - Supply, installation, Testing and Commissioning.Description : Above ground activities in Gasified/Charged network or in O&M area - Supply, installation, Testing and Commissioning. This SOR is applicable for Alteration, Shifting, Removal, & Re-fitting of GI, LMC connection. GI Pipes/Copper Pipes, Meter, Regulators, isolation valves shall be supplied by Owner. All other required fittings and consumables are under Bidders scope. Applicable to alteration requirement/request. (Customer Visit Report Required). The rates mentioned in this line item are inclusive of manpower charges, AEO team & shall not be engaged in execution of these activites. Only Pipe removal/fitting would be paid as per this SORs for Alteration, Shifting, Removal, & Re-fitting of GI, LMC connections. All rates are inclusive of bidders scope of materials, charges for mobilization for domestic alteration/riser shifting work/Preparation of isometric drawing and necessary reports/services for making holes in brick wall/RCC structure, removal/refitting of meter assembly, colour touch up,at the time of alteration activity, etc. - Fitting of 1\\" GI Pipe through threaded joints including supply and fixing of GI fittings. |
| 37 | Removal/DisconnectionsDescription : This SOR is applicable for, Removal of GI, LMC connection. Removal of Threaded 1/2\\" GI Pipe including all fittings |
| 38 | Removal/DisconnectionsDescription : This SOR is applicable for, Removal of GI, LMC connection. Removal of Threaded 3/4\\" GI Pipe including all fittings. |
| 39 | Removal/DisconnectionsDescription : This SOR is applicable for, Removal of GI, LMC connection. Removal of Threaded 1\\" GI Pipe including all fittings. |
| 40 | Above ground activities in Gasified/Charged network or in O&M area - Supply, installation, Testing and Commissioning.Decription : Above ground activities in Gasified/Charged network or in O&M area - Supply, installation, Testing and Commissioning. This SOR is applicable for Alteration, Shifting, Removal, & Re-fitting of GI, LMC connection. GI Pipes/Copper Pipes, Meter, Regulators, isolation valves shall be supplied by Owner. All other required fittings and consumables are under Bidders scope. Applicable to alteration requirement/request. (Customer Visit Report Required). The rates mentioned in this line item are inclusive of manpower charges, AEO team & shall not be engaged in execution of these activites. Only Pipe removal/fitting would be paid as per this SORs for Alteration, Shifting, Removal, & Re-fitting of GI, LMC connections. All rates are inclusive of bidders scope of materials, charges for mobilization for domestic alteration/riser shifting work/Preparation of isometric drawing and necessary reports/services for making holes in brick wall/RCC structure, removal/refitting of meter assembly, colour touch up,at the time of alteration activity, etc. - Fitting of 3/4\\" GI Pipe through welded joints including supply and fixing of fittings. |
| 41 | Above ground activities in Gasified/Charged network or in O&M area - Supply, installation, Testing and Commissioning.Description : Above ground activities in Gasified/Charged network or in O&M area - Supply, installation, Testing and Commissioning. This SOR is applicable for Alteration, Shifting, Removal, & Re-fitting of GI, LMC connection. GI Pipes/Copper Pipes, Meter, Regulators, isolation valves shall be supplied by Owner. All other required fittings and consumables are under Bidders scope. Applicable to alteration requirement/request. (Customer Visit Report Required). The rates mentioned in this line item are inclusive of manpower charges, AEO team & shall not be engaged in execution of these activites. Only Pipe removal/fitting would be paid as per this SORs for Alteration, Shifting, Removal, & Re-fitting of GI, LMC connections. All rates are inclusive of bidders scope of materials, charges for mobilization for domestic alteration/riser shifting work/Preparation of isometric drawing and necessary reports/services for making holes in brick wall/RCC structure, removal/refitting of meter assembly, colour touch up,at the time of alteration activity, etc. - Fitting of 1\\" GI Pipe through welded joints including supply and fixing of fittings. |
| 42 | Removal/DisconnectionsDecription : This SOR is applicable for, Removal of GI, LMC connection. Removal of Welded 3/4\\" GI Pipe including all fittings. |
| 43 | Removal/DisconnectionsDecription : This SOR is applicable for, Removal of GI, LMC connection. Removal of Welded 1\\" GI Pipe including all fittings. |
| 44 | Above ground activities in Gasified/Charged network or in O&M area- Supply, installation, Testing and Commissioning.Decription : Above ground activities in Gasified/Charged network or in O&M area - Supply, installation, Testing and Commissioning. This SOR is applicable for Alteration, Shifting, Removal, & Re-fitting of GI, LMC connection. GI Pipes/Copper Pipes, Meter, Regulators, isolation valves shall be supplied by Owner. All other required fittings and consumables are under Bidders scope. Applicable to alteration requirement/request. (Customer Visit Report Required). The rates mentioned in this line item are inclusive of manpower charges, AEO team & shall not be engaged in execution of these activites. Only Pipe removal/fitting would be paid as per this SORs for Alteration, Shifting, Removal, & Re-fitting of GI, LMC connections. All rates are inclusive of bidders scope of materials, charges for mobilization for domestic alteration/riser shifting work/Preparation of isometric drawing and necessary reports/services for making holes in brick wall/RCC structure, removal/refitting of meter assembly, colour touch up,at the time of alteration activity, etc.- Conversion of domestic stove (4 burners or below) after commisioing on customer request (inclusive of Jet). |
| 45 | Above ground activities in Gasified/Charged network or in O&M area - Preventive Maintenance - Domestic / Commercial / Industrial PNG Connection / InstallationDecription : Above ground activities in Gasified/Charged network or in O&M area - Preventive Maintenance - Domestic / Commercial / Industrial PNG Connection / Installation as per scope mentioned in Technical Vol. Part-II. Inclusive of consumable screw, Teflon tape, paint for touch up, sand, cementing etc. Supply of all materials other than GI/Cu/PE pipes, Isolavation/Appliance Valves, PE valves, Service regulators, Meter and Regulators are in bidders scope.- Documentation as per Owners requirement need to be maintained and submitted. Refer Part II for detailed scope of work. All rates are inclusive of bidders scope materials. The rates mentioned in this line item are inclusive of manpower charges, Lodging facility team and shall not be engaged in execution of these activites - Preventive Maintenance of domestic connection - 1 year frequency. |
| 46 | Above ground activities in Gasified/Charged network or in O&M area - Preventive Maintenance - Domestic / Commercial / Industrial PNG Connection / InstallationDecription : Above ground activities in Gasified/Charged network or in O&M area - Preventive Maintenance - Domestic / Commercial / Industrial PNG Connection / Installation as per scope mentioned in Technical Vol. Part-II. Inclusive of consumable screw, Teflon tape, paint for touch up, sand, cementing etc. Supply of all materials other than GI/Cu/PE pipes, Isolavation/Appliance Valves, PE valves, Service regulators, Meter and Regulators are in bidders scope.- Documentation as per Owners requirement need to be maintained and submitted. Refer Part II for detailed scope of work. All rates are inclusive of bidders scope materials. The rates mentioned in this line item are inclusive of manpower charges, AEO team and shall not be engaged in execution of these activites - Preventive Maintenance of Commercial Connection including Riser, Meter, Regulators etc - 1 year frequency. |
| 47 | Above ground activities in Gasified/Charged network or in O&M area - Preventive Maintenance - Domestic / Commercial / Industrial PNG Connection / InstallationDecription : Above ground activities in Gasified/Charged network or in O&M area - Preventive Maintenance - Domestic / Commercial / Industrial PNG Connection / Installation as per scope mentioned in Technical Vol. Part-II. Inclusive of consumable screw, Teflon tape, paint for touch up, sand, cementing etc. Supply of all materials other than GI/Cu/PE pipes, Isolavation/Appliance Valves, PE valves, Service regulators, Meter and Regulators are in bidders scope.- Documentation as per Owners requirement need to be maintained and submitted. Refer Part II for detailed scope of work. All rates are inclusive of bidders scope materials. The rates mentioned in this line item are inclusive of manpower charges, Lodging facility team and shall not be engaged in execution of these activites - Preventive Maintenance of Industrial Connection including MRS- 1 year frequency. |
| 48 | Above ground activities in Gasified/Charged network or in O&M area - Preventive Maintenance - Domestic / Commercial / Industrial PNG Connection / InstallationDecription : Above ground activities in Gasified/Charged network or in O&M area - Preventive Maintenance - Domestic / Commercial / Industrial PNG Connection / Installation as per scope mentioned in Technical Vol. Part-II. Inclusive of consumable screw, Teflon tape, paint for touch up, sand, cementing etc. Supply of all materials other than GI/Cu/PE pipes, Isolavation/Appliance Valves, PE valves, Service regulators, Meter and Regulators are in bidders scope.- Documentation as per Owners requirement need to be maintained and submitted. Refer Part II for detailed scope of work. All rates are inclusive of bidders scope materials. The rates mentioned in this line item are inclusive of manpower charges, Lodging facility team and shall not be engaged in execution of these activites - Supply and Installation of Stone/RCC marker. |
| 49 | Above ground activities in Gasified/Charged network or in O&M area - Preventive Maintenance - Domestic / Commercial / Industrial PNG Connection / InstallationDecription : Above ground activities in Gasified/Charged network or in O&M area - Preventive Maintenance - Domestic / Commercial / Industrial PNG Connection / Installation as per scope mentioned in Technical Vol. Part-II. Inclusive of consumable screw, Teflon tape, paint for touch up, sand, cementing etc. Supply of all materials other than GI/Cu/PE pipes, Isolavation/Appliance Valves, PE valves, Service regulators, Meter and Regulators are in bidders scope.- Documentation as per Owners requirement need to be maintained and submitted. Refer Part II for detailed scope of work. All rates are inclusive of bidders scope materials. The rates mentioned in this line item are inclusive of manpower charges, Lodging facility team and shall not be engaged in execution of these activites - Supply and Installation of Pole marker. |
| 50 | Above ground activities in Gasified/Charged network or in O&M area - Preventive Maintenance - Domestic / Commercial / Industrial PNG Connection / InstallationDecription : Above ground activities in Gasified/Charged network or in O&M area - Preventive Maintenance - Domestic / Commercial / Industrial PNG Connection / Installation as per scope mentioned in Technical Vol. Part-II. Inclusive of consumable screw, Teflon tape, paint for touch up, sand, cementing etc. Supply of all materials other than GI/Cu/PE pipes, Isolavation/Appliance Valves, PE valves, Service regulators, Meter and Regulators are in bidders scope.- Documentation as per Owners requirement need to be maintained and submitted. Refer Part II for detailed scope of work. All rates are inclusive of bidders scope materials. The rates mentioned in this line item are inclusive of manpower charges, Lodging facility team and shall not be engaged in execution of these activites - Reinstallation of Pole/Stone marker. |
| 51 | Above ground activities in Gasified/Charged network or in O&M area - Preventive Maintenance - Domestic / Commercial / Industrial PNG Connection / InstallationDecription : Above ground activities in Gasified/Charged network or in O&M area - Preventive Maintenance - Domestic / Commercial / Industrial PNG Connection / Installation as per scope mentioned in Technical Vol. Part-II. Inclusive of consumable screw, Teflon tape, paint for touch up, sand, cementing etc. Supply of all materials other than GI/Cu/PE pipes, Isolavation/Appliance Valves, PE valves, Service regulators, Meter and Regulators are in bidders scope.- Documentation as per Owners requirement need to be maintained and submitted. Refer Part II for detailed scope of work. All rates are inclusive of bidders scope materials. The rates mentioned in this line item are inclusive of manpower charges, Lodging facility team and shall not be engaged in execution of these activites - Meter Shifting of Commercial/Industrial Connection within customer premises. |
| 52 | Above ground activities in Gasified/Charged network or in O&M area - PaintingDecription : Above ground activities in Gasified/Charged network or in O&M area - Painting- Any Surface of Valve Chambers, SR, MRS, DRS, RCC/Stone/Pole Markers etc as per specification provided by EIC (For scope refer Technical Vol. Part II). |
| 53 | Above ground activities in Gasified/Charged network or in O&M area - Stencling on Pole/Stone/RCC markerDecription : Above ground activities in Gasified/Charged network or in O&M area - Stencling on Pole/Stone/RCC marker: Scope includes cleaning of surface, stenciling PBGPL Gas logo, 03 telephone numbers each having 10-12 digits , matter writing in Hindi/Venacular & English as per drawing. The font size shall be tentatively of 2 to 2.5 inches for each digit. The size and font, however may vary as per requirement. The rate shall be per marker basis. All tools and tackles are in contractors scope (For scope refer Technical Vol. Part II). |
| 54 | Above ground activities in Gasified/Charged network or in O&M area - Stencling on any other surfaceDecription : Above ground activities in Gasified/Charged network or in O&M area - Stencling on any other surface: Scope includes cleaning of surface, stenciling PBGPL Gas logo, Numbers, Letters, as per drawing or as instructed by EIC. All tools and tackles are in contractors scope (For scope refer Technical Vol. Part II). |
| 55 | Civil Construction work including supply of required material & Labor - Brick work including plastering.Decription : Civil Construction work including supply of required material & Labor - Brick work including plastering. Modification of brick wall and any other brick work, foundation work etc. All materials, labour, tools and tackles are in contractors scope (For scope refer Technical Vol. Part II). |
| 56 | Civil Construction work including supply of required material & Labor - PCC 1:2:4Decription : Civil Construction work including supply of required material & Labor - PCC 1:2:4, Refer Part II clause 15 of Technical volume (For scope refer Technical Vol. Part II). |
| 57 | Civil Construction work including supply of required material & Labor - RCC M20Decription : Civil Construction work including supply of required material & Labor - RCC M20 (For scope refer Technical Vol. Part II). |
| 58 | Civil Construction work including supply of required material & Labor - Supply of PE Valve Chamber CoversDecription : Civil Construction work including supply of required material & Labor - Supply of PE Valve Chamber Covers (For scope refer Technical Vol. Part II). |
| 59 | Civil Construction work including supply of required material & Labor - Replacement of SR BoxDecription : Civil Construction work including supply of required material & Labor - Replacement of SR Box =< B50 inclusive of supply of SR box and foundation (For scope refer Technical Vol. Part II). |
| 60 | Civil Construction work including supply of required material & Labor - Replacement of SR BoxDecription : Civil Construction work including supply of required material & Labor - Replacement of SR Box >B50 inclusive of supply of SR box and foundation (For scope refer Technical Vol. Part II). |
| 61 | Civil Construction work including supply of required material & Labor - Replacement/shifting of existing PE Ball ValveDecription : Civil Construction work including supply of required material & Labor - Replacement/shifting of existing PE Ball Valve along with construction of valve chamber inclusive of white wash, painting, pest control and providing Covers (For scope refer Technical Vol. Part II). |
| 62 | Civil Construction work including supply of required material & Labor - Modification Valve Pit Height for Brick/RCC PE ChamberDecription : Civil Construction work including supply of required material & Labor - Modification Valve Pit Height for Brick/RCC PE Chamber: Increase the height of valve pit by RCC/Brick and plaster and roof casting with RCC, rate includes demolition and increasing of height of chamber with roof casting and supply of chamber cover and ring (For scope refer Technical Vol. Part II). |
| 63 | Restoration of trenches to original surface as applicable including HSE and shifting of surplus excavated earth/debris - Restoration of the roads, pavements, channels, footpaths, tiles, stones etc.Decription : Restoration of trenches to original surface as applicable including HSE and shifting of surplus excavated earth/debris - Restoration of the roads, pavements, channels, footpaths, tiles, stones etc. to original condition including supply of the approved quality material required, as per local authorities norms, obtaining NOC from concerned local authorities/ land owners/ third party agencies designated by Owners and to the satisfaction of EIC - PCC 1:2:4 with thickness of 50mm for protection of all sizes of PE pipe laying (For scope refer Technical Vol. Part II). |
| 64 | Restoration of trenches to original surface as applicable including HSE and shifting of surplus excavated earth/debris - Restoration of the roads, pavements, channels, footpaths, tiles, stones etc.Decription : Restoration of trenches to original surface as applicable including HSE and shifting of surplus excavated earth/debris - Restoration of the roads, pavements, channels, footpaths, tiles, stones etc. to original condition including supply of the approved quality material required, as per local authorities norms, obtaining NOC from concerned local authorities/ land owners/ third party agencies designated by Owners and to the satisfaction of EIC - Construction of RCC structure/Pedestal for protection of service line (20/32 mm dia.) in old Projects & O&M areas for drain/nallah crossing (adjecent to house / Boundry walls). Refer clause no. 6.1.17, Part II of Technical volume. |
| 65 | Hiring of following equipment for doing any emergency workDecription : Hiring of following equipment for doing any emergency work: Only Applicable if work is executed under scope of Part-I. Hiring of following equipments for doing any emergency work. The period of hiring will start after the equipment reaches at site and ends when equipment leaves the site. Hiring will be based on instruction of EIC. Break down period of equipment will not be paid. Hiring rates is inclusive of fuel cost, operators cost, Maintenance cost etc. - Hiring of JCB for excavation (For scope refer Technical Vol. Part I). |
| 66 | Hiring of following equipment for doing any emergency workDecription : Hiring of following equipment for doing any emergency work :Only Applicable if work is executed under scope of Part-I. Hiring of following equipments for doing any emergency work. The period of hiring will start after the equipment reaches at site and ends when equipment leaves the site. Hiring will be based on instruction of EIC. Break down period of equipment will not be paid. Hiring rates is inclusive of fuel cost, operators cost, Maintenance cost etc. - Hiring of Hydra Crane (For scope refer Technical Vol. Part I). |
| 67 | Hiring of following equipment for doing any emergency workDecription : Hiring of following equipment for doing any emergency work :Only Applicable if work is executed under scope of Part-I. Hiring of following equipments for doing any emergency work. The period of hiring will start after the equipment reaches at site and ends when equipment leaves the site. Hiring will be based on instruction of EIC. Break down period of equipment will not be paid. Hiring rates is inclusive of fuel cost, operators cost, Maintenance cost etc. - Hiring of Diesel Generator set - 15 KVA ( This requirement is under circumstances besides the Generator available in Emergency van) (For scope refer Technical Vol. Part I).The per-day rate is applicable for a maximum hiring duration of up to 4 hours per day. |
| 68 | Hiring of following equipment for doing any emergency workDecription : Hiring of following equipment for doing any emergency work :Only Applicable if work is executed under scope of Part-I. Hiring of following equipments for doing any emergency work. The period of hiring will start after the equipment reaches at site and ends when equipment leaves the site. Hiring will be based on instruction of EIC. Break down period of equipment will not be paid. Hiring rates is inclusive of fuel cost, operators cost, Maintenance cost etc. - Hiring of Dewatering/Mud Pump greater than 5 HP with hose pipe and accessories (This requirement is under circumstances besides the Dewatering pump available in Emergency van) (For scope refer Technical Vol. Part I).The per-day rate is applicable for a maximum hiring duration of up to 4 hours per day. |
| 69 | Hiring of following equipment for doing any emergency workDecription : Hiring of following equipment for doing any emergency work :Only Applicable if work is executed under scope of Part-I. Hiring of following equipments for doing any emergency work. The period of hiring will start after the equipment reaches at site and ends when equipment leaves the site. Hiring will be based on instruction of EIC. Break down period of equipment will not be paid. Hiring rates is inclusive of fuel cost, operators cost, Maintenance cost etc. - Hiring of Breaker for Concrete (RCC- Any size/ PCC more than 4\\" thickness) / Rock (Length of strata is more than 2 m)/ Bitumin Thickness more than 6\\" and also for part II -PE laying section (For scope refer Technical Vol. Part I).The per-day rate is applicable for a maximum hiring duration of up to 4 hours per day. |
| 70 | Hiring of following equipment for doing any emergency workDecription : Hiring of following equipment for doing any emergency work :Only Applicable if work is executed under scope of Part-I. Hiring of following equipments for doing any emergency work. The period of hiring will start after the equipment reaches at site and ends when equipment leaves the site. Hiring will be based on instruction of EIC. Break down period of equipment will not be paid. Hiring rates is inclusive of fuel cost, operators cost, Maintenance cost etc. - Hiring of Air Compressor of 100 CFM capacity, 6 barg for Flushing & testing (For scope refer Technical Vol. Part I).The per-day rate is applicable for a maximum hiring duration of up to 8 hours per day. |
| 71 | Hiring of following equipment for doing any emergency workDecription : Hiring of following equipment for doing any emergency work :Only Applicable if work is executed under scope of Part-I. Hiring of following equipments for doing any emergency work. The period of hiring will start after the equipment reaches at site and ends when equipment leaves the site. Hiring will be based on instruction of EIC. Break down period of equipment will not be paid. Hiring rates is inclusive of fuel cost, operators cost, Maintenance cost etc. - Hiring of Tractor Trolley/ Truck for shifting of material in extra ordinary conditions (For scope refer Technical Vol. Part I).The per-day rate is applicable for a maximum hiring duration of up to 8 hours per day. |
| 72 | Supply of GI 1\\" Coupler (ISI marked GI Coupler with NPT thread) |
| 73 | Supply of GI 3/4\\" Coupler (ISI marked GI Coupler with NPT thread) |
| 74 | Supply of GI 1/2\\" Coupler (ISI marked GI Coupler with NPT thread) |
| 75 | Supply of GI 1\\" Union (ISI marked with NPT thread) |
| 76 | Supply of GI 3/4\\" Union (ISI marked with NPT thread) |
| 77 | Supply of GI 1/2\\" Union (ISI marked with NPT thread) |
| 78 | Supply of GI 1\\" Elbow (ISI marked with NPT thread) |
| 79 | Supply of GI 3/4\\" Elbow (ISI marked with NPT thread) |
| 80 | Supply of GI 1/2\\" Elbow (ISI marked with NPT thread) |
| 81 | Supply of GI 1\\" Plug (ISI marked with NPT thread) |
| 82 | Supply of GI 3/4\\" Plug (ISI marked with NPT thread) |
| 83 | Supply of GI 1/2\\" Plug (ISI marked with NPT thread) |
| 84 | Supply of GI 1\\" Tee (ISI marked with NPT thread) |
| 85 | Supply of GI 3/4\\" Tee (ISI marked with NPT thread) |
| 86 | Supply of GI 1/2\\" Tee (ISI marked with NPT thread) |
| 87 | Supply of GI Reducer 1\\" x 3/4\\" (ISI marked with NPT thread) |
| 88 | Supply of GI Reducer 3/4\\"X 1/2\\"\\" (ISI marked with NPT thread) |
| 89 | Supply of GI ELBOW male x Female 3/4\\"\\"(ISI marked with NPT thread) |
| 90 | Supply of GI ELBOW male x Female 1/2\\"(ISI marked with NPT thread) |
| 91 | Supply of Appliance Valve 1/4\\" |
| 92 | Supply of Appliance Valve 1/2\\" |
| 93 | Supply of GI 1\\" Clamp (MS) |
| 94 | Supply of GI 3/4\\" Clamp (MS) |
| 95 | Supply of GI 1/2\\" Clamp (MS) |
| 96 | Supply of GI 1/2\\" Hex Nipple (ISI marked with NPT thread) |
| 97 | Supply of GI 1/2\\" Nipple 1/2\\" x 2\\" (ISI marked with NPT thread) |
| 98 | Supply of Regulator Bush (ISI marked with NPT thread) |
| 99 | Supply of Isolation Valve 1\\" (ISI marked with NPT thread) |
| 100 | Supply of Isolation Valve 3/4\\" (ISI marked with NPT thread) |
| 101 | Supply of Isolation Valve 1/2\\" (ISI marked with NPT thread) |
| 102 | Supply of Meter inlet Adaptor 3/4\\" X 3/4\\"(As per IS 319) |
| 103 | Supply of Meter inlet Adaptor 3/4\\" X 1/2\\"(As per IS 319) |
| 104 | Supply of O Ring (ISI marked) |
| 105 | Supply of PVC Sleeves for 1/2\\" GI pipe |
| 106 | Supply of Meter Warning Plate SS |
| 107 | Supply of Warning Mat |
| 108 | Supply of Suraksha Hose pipe (ISI mark) |
| 109 | Supply of Jet 110 Brass (Brass jet with NPT thread) |
| 110 | Supply of Jet 125/120 Brass (Brass jet with NPT thread) |
| 111 | Supply of MDPE Coupler SDR 11,PE 100 -20mm |
| 112 | Supply of MDPE Coupler SDR 11,PE 100 -32mm |
| 113 | Supply of MDPE Coupler SDR 11,PE 100 -63mm |
| 114 | Supply of MDPE Coupler SDR 11,PE 100 -90mm |
| 115 | Supply of MDPE Coupler SDR 11,PE 100 -125mm |
| 116 | Supply of MDPE Elbow SDR 11,PE 100 -32mm |
| 117 | Supply of MDPE Elbow SDR 11,PE 100 -63mm |
| 118 | Supply of MDPE Elbow SDR 11,PE 100 -90mm |
| 119 | Supply of MDPE Elbow 45 deg SDR 11,PE 100 -63mm |
| 120 | Supply of MDPE Elbow SDR 11,PE 100 -125mm |
| 121 | Supply of MDPE Elbow 45 deg SDR 11,PE 100 -90mm |
| 122 | Supply of MDPE Elbow 45 degSDR 11,PE 100 -125mm |
| 123 | Supply of MDPE Top Tee SDR 11,PE 100 -32 x 20mm |
| 124 | Supply of MDPE Top Tee SDR 11,PE 100 125 x 32mm |
| 125 | Supply of MDPE Top Tee SDR 11,PE 100 125 x 63mm |
| 126 | Supply of MDPE Top Tee SDR 11,PE 100 -63 x 32mm |
| 127 | Supply of MDPE Top Tee SDR 11,PE 100 -63 x 20mm |
| 128 | Supply of MDPE Top Tee SDR 11,PE 100 -125 x 90mm |
| 129 | Supply of MDPE Top Tee SDR 11,PE 100 -90 x 63mm |
| 130 | Supply of MDPE Top Tee SDR 11,PE 100 -90 x 32mm |
| 131 | Supply of MDPE Top Tee SDR 11,PE 100 -90 x 20mm |
| 132 | Supply of Equal Tee SDR 11 ,PE 100 -20mm |
| 133 | Supply of Equal Tee SDR 11 ,PE 100 -32mm |
| 134 | Supply of Equal Tee SDR 11 ,PE 100 -63mm |
| 135 | Supply of Equal Tee SDR 11 ,PE 100 -90mm |
| 136 | Supply of Equal Tee SDR 11 ,PE 100 -125mm |
| 137 | Supply of End Cap SDR 11,PE 100 -20 mm |
| 138 | Supply of End Cap SDR 11,PE 100 -32 mm |
| 139 | Supply of End Cap SDR 11,PE 100 -63 mm |
| 140 | Supply of End Cap SDR 11,PE 100 -90 mm |
| 141 | Supply of End Cap SDR 11,PE 100 -125 mm |
| 142 | Supply of Reducer SDR 11,PE 100 -32x20mm |
| 143 | Supply of Reducer SDR 11,PE 100 -63x32mm |
| 144 | Supply of Reducer SDR 11,PE 100 -125x90mm |
| 145 | Supply of Reducer SDR 11,PE 100 -90x63mm |
| 146 | Supply of Reducer SDR 11,PE 100 -90x32mm |
| 147 | Supply of Reducer SDR 11,PE 100 -125x63mm |
| 148 | Supply of TF Fittings 20 x 1\\" |
| 149 | Supply of TF Fittings 32 x 1\\" |
| 150 | Supply of TF Fittings 63 x 1\\" |
| 151 | Supply of TF Fittings 90 x 1/2\\"/3/4\\" |
| 152 | Supply of TF Fittings 63 x 1/2\\"/3/4\\" |
| 153 | Supply of TF Fittings 20/32 x 1/2\\"/3/4\\" |
| 154 | Supply of 125 mm Ball valve |
| 155 | Supply of 90 mm Ball valve |
| 156 | Supply of 63 mm Ball valve |
| 157 | Supply of 32 mm Ball valve |
| 158 | Total Value Excluding GST (Part A + Part B) |
| 159 | GST on Sl. No. 3(Bidder must enter the value without suffixing % symbol) Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail