|
| 1 | Construction of subgrade and earthenshoulders with approved material obtained from road side with all lifts and leads trancporting to sites, spreading, grading to required slope and compected to meet requirement of table 300.2 and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 2 | Providing, Laying & Spreading Material on a prepared sub grade, adding cement @ 2% by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined, compressive strength and to form a layer of sub-base. and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 3 | Providing, treated, Laying & spreading Material on a prepared sub grade, adding cement @4% by weight to the spread material (G-3 with 4% cement OPC) manually, mixing in place ith rotavator and compacting with the road roller at OMC to achived the desired unconfined, compressive strenght and to form a layer of sub-base. and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 4 | Providing & applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface incliding supply of all meterial T&P and labour cess etc. and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 5 | P/L of open graded premix carpeting of 20mm thick composed with 13.2 mm and 11.2mm grit aggregate or approved graded grit @ 0.27 cum/10Sqm. using 80/100 bitumen @ 146.00 Kg./100Sqm. as bearing course, including heating of bitumen to required temperature, and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 6 | Providing and applying seal coat type ‘C’ with 6.8 mm gauge stone grit @ 0.90 cum/100 Sqm & bitumen 65 kg/100 Sqm including heating of bitumen to required temperature, mixing of stone gri with suitable mixol, laying and rolling with a smooth wheeled roller including cost of all material, Labour, royalty, T&P and all taxes etc required for proper completion of work and roller charges and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 7 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 8 | providing concrete for plain/reinforced concrete P.C.C. Grade M-10 (1:3:6) in open foundations complete as per drawing and technical specifications. and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 9 | Laying and compacting dry O.B.B. 40mm. Gauge in foundation in layers of not more than 15cm. Thickness including local sand, in ratio 2:1 as per direction of the Engineer-in-Charge and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.. Chp 1 2c |
| 10 | Brick masonry work in cement mortar in foundation complete excepting pointing and plastering, as per drawing and technical specification Clauses 600, 1202 & 1203 and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 11 | Supply and laying 350mm dia NP-3 Hume pipe and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 12 | Supply and laying 600mm dia NP-3 Hume pipeand including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 13 | Pointing with cement mortar (1:3) on brick work, as per drawing and technical specification Clauses 613.3 and 1204 and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 14 | providing concrete for plain/reinforced concrete P.C.C. Grade M-20 (1:2:4) in open foundations complete as per drawing and technical specifications. and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 15 | Mantinance Part A @ 7.50 % |
| 16 | Maintenance of constructed Bituminous road next five year after completion the contractor shall be paid total maintenance cost 7.5% of tender Civil Cost for five year in the form of instalment as below. The payment shall be inclusive of cess but excluding GST payment shall be done as per satisfaction of engineer in charge regarding maintenance work carried out by contractor (Including cess and Excluding GST)For 1st Year 0.00% |
| 17 | Item No. 16 but for 2nd year 0.75% |
| 18 | Item No. 16 but for 3rd year 1.50% |
| 19 | Item No. 16 but for 4th year 2.25% |
| 20 | Item No. 16 but for 5th year 3.00% Please Enable Macros to View BoQ information |