| 1 | Earthwork in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, includinggetting out the excavated soil and disposal of surplus excavated soil as per direction of Engineer-in-charge , within a lead of 50m - all kinds of soil |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:5:10 (1 cement : 5 fine aggregate : 10 graded stone aggregate 40mm nominal size) |
| 3 | Providing and fixing at or near ground level precast cement concrete in kerbs, edgings etc. as per approved pattern andsetting in position with cement mortar 1:3 (1 cement : 3 fine aggregate), including the cost of required centering , shuttering complete - 1:1.5:3 (1 cement :1.5 fine aggregate: 3 graded stone aggregate 20 mm nominal size) |
| 4 | Brick work with common burnt clay F.P.S. (non modular ) bricks of class designation 3.5 in foundation and plinth in - cement mortar 1:4 (1 cement : 4 fine aggregate) |
| 5 | 12mm cement plaster of mix -1:4 ( 1 cement : 4 fine aggregate) |
| 6 | Providing and laying 83 mm mm thick factory made rubber moulded hydraulic pressed paver block made by block making machine with strong vibratory compaction and of approved size and design / shape laid in required colour and pattern over and including 50mm thick compacted bed of course sand, filling the joints with fine aggregate etc. all complete |
| 7 | Centering and shuttering including strutting , propping etc and removal of form for - foundations, footings, bases of columns etc for mass concrete |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:2:4 (1 cement : 2 fine aggregate : 4 graded stone aggregate 20mm nominal size) |
| 9 | Supplying and filling with red earth (excluding rock) including cost and conveyance to the work site and stacking to the departmental gauge , spreading in layers not exceeding 20cm in depth , watering and consolidation using 0.5 tonne roller , or wooden or steel rammers etc. complete for making play fields , running tracks and court yards |
| 10 | Steel work welded in built up sections / framed work , including cutting,hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required - in gratings, frames, guard bar, ladder, railings, brackets,gates and similar works |
| 11 | Painting with synthetic enamel paint of approved brand and manufacutre to give an even shade - Two or more coats on new work |
| 12 | Finishing walls with acrylic smooth exterior paint of required shade - New work (two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre / 10 sqm |
| 13 | Providing and laying soft Korean grass turfing including supplying red earth, manure, river fine aggregate, labour charges for ground preparation spreading earth and manure transportation of all and maintaining the lawn for initial three months etc. complete. |
| 14 | Maintenance of lawns with fine grassing for the first year including watering, etc., |
| 15 | Providing and laying flamed finish Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as per direction of Engineer-in-charge :F lamed finish granite stone slab Jet Black, Cherry Red, Elite Brown, Cat Eye or equivalent. |
| 16 | Providing edge moulding to 18mm thick marble stone counters ,vanities etc., including machine polishing to edge to give high gloss finish etc. complete - Granite work. |
| 17 | 40 mm thick rubbed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 fine aggregate) with joints 3 mm thick, side buttered with cemnt mortar 1:2 (1 cement : 2 stone dust) admixed with pigment to match the shade of stone and pointing with same mortar - white sand stone |
| 18 | Providing and fixing 3 lined granite benches having the coping slab single 1.38 X 0.44 X 0.10 m and which is supporting Granite Pillar on both side of single 0.29 x 0.29 x 0.40m. The rate including the cost of granite stone for 3 line dressing on the all exposed surface of the pillars and stone slabs, single nosing the top edges of the slab as per design pattern. The coping slab should be engraved to suit over the stand pillar with a groove cutting 20mm depth 0.29 x 0.29m. The rate including labour for shifting and fixing in position. The rate also labour charge all as per the architectureal drawing and as directed by Engineer-in-Charge. |
| 19 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50m and all lift |
| 20 | Providing and fixing on wall face unplasticised rigid PVC rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10mm gap for thermal expansion, (i) Single socketed pipes - 75mm diameter |
| 21 | Providing and fixing ASTM pipes including all ASTM plain & brass threaded fittings this included jointing of pipes & fittings with one step ASTM solvent cement , trenching refilling & testing of joints complete (External work) - 20 mm nominal outer dia pipes Please Enable Macros to View BoQ information |